ANNEXURE C

Report 2 Downloads 72 Views
ANNEXURE C VALUATION ABSTRACT YEAR BY YEAR Date:

16-Sep-2006

F. Y.

2001 -2002

Ref:

WORK DONE

UNIT QUANTITY

BOUNDARY WALL STAGE Foundation

m sqm

143.74 79.27

RATE (Rs)

V 418

AMOUNT (Rs)

0.4 404.88 0.4 1547.03

58197 122629 180826

2002 -2003

FOUNDATION STAGE B WALL Finishing GATE

sqm sqm m no

490.09 79.27 143.74 2.00

0.45 2104.63 0.6 2320.55 0.6 607.32 7548.60

1031470 183944 87296 15097 1317807

2003 -2004

Gr Fl ROOF LAID

sqm

490.09

0.345 1613.55

790794 790794

2004 -2005

Gr Fl FINISHING PAVEMENT 1st Fl STARTED

sqm sqm sqm

490.09 82.87 312.68

0.205 958.78 158.16 0.3 797.19

469892 13108 249263 732262

2005 -2006

1st Fl MAIN BLOCK ATTIC ROOF TILES

sqm sqm sqm

312.68 72.58 291.58

Under Construction

sqm

82.17

0.7 1860.11 2657.29 370.78 602.82

581614 192856 108113 49533 932116

Total Value of the Building excluding Land: Say, Rs. Thirty-nine lakhs fifty thousand only.

3953806 Rs.

3,950,000.00

Signature of registered Valuer W.B./CCIT, Kol-VII/(CC-IX)16/2005-06

Recommend Documents