Finding A New Normal

Report 4 Downloads 262 Views
Finding A New Normal City/State: Timonium-Lutherville, Maryland Project Category: Residential Architecture

Accessible, sustainable, and made in America. These three principles create a building and landscape that mediates a sloping site, shields itself from winter winds, and opens toward vistas of the surrounding countryside. The tripartite goals are also reflected in three increasingly visible masses: a green-roofed bedroom wing inset into the hillside; a gable-roofed living area facing the street; and a sky lit tower commanding views of the stream valley below. The owners 13 year old son sustained traumatic brain injury when a truck driver fell asleep at the wheel, killing his mother and injuring his brother. Because he now uses a wheelchair, the house program was set with Universal Design and barrier free living as the top priority. Second to that was a sustainability imparted by the family’s love and respect for nature. Finally, the desire for a home constructed sourced by products made in America.

Exterior from North

Universal design is vital in the design to allow users of all capabilities to navigate the home and site. Design features include a fully accessible kitchen, meditation tower with custom designed chairlift, and radiant-heated concrete with inset rugs for flat transitions. Sustainable design is achieved by integrating the building into the site, using a cedar wrap, protective “skin” on the exterior of the building, a green roof for landscape continuity, and south facing clerestory windows.

Interior Living & Dining Area

SLATTERY RESIDENCE OWNER:

RACE

7 76 436.9 BC

2 72 439.1 BC

8 75 434.2 BC

EX. "8W

3 74 434.5 CL

1

440 SP

4 41 0 50 443.3 tl "/m AIN4 DR 5 119 443.8 NK T-BA

SAN. CO

0 140 436.9 NK B-BA

87

441.18

12.00'

V 435.41 pipe 436.51)

439

440 (Tpipe 435.6)

INV 434.5 inlet 438.5

440

Y

441

PE . "12HD PROP

440.70

2 132 444.4 SPOT

A SETB

5 121 444.0 NK T-BA

2%

13.51'

441.75

B

CK

% @ 1.0

7.30'

5

5 141 440.0 NK B-BA

25

22

4

INV 8 435.00 (Tpipe 436.10) 0 5 133 445.2 12 444.1 NK SPOT T-BA

5

225.09' +/25.00' MIN

144

3 142 435.4 NK B-BA

441

33

INV 433.92 (5.0ft cover)

441.18

ED HOUSE =441

25'+/31.71' +/-

5 443.8 NK T-BA

441.16 433.08) INV 431.98 (Tpipe (4.9ft cover)

(Tpipe 431.29) (0.71ft cover)

INV 430.19

5 43

25FT SE

59

INV 429.0

SP

TBACK

6 189 430.7 SPOT

8 188 428.9 OT

(Tpipe 430.54) (0.46ft cover)

INV 429.44

C

3' 395.3

INV 430.76

9 150 432.4 " 431.86) (Tpipe14 (1.1ft cover)

' 95.38 "W 3 13'15 S 09°

432.46) INV 431.36 (Tpipe (2.5ft cover) 2 149 433.4 NK B-BA

8 151 436.2 NK B-BA

NO CE EN R 1 E F RE EY V R R SU SU TAL TH N O RIZ ED TO AM HO C H ALL EREN NORT F RE TEM, E PO SYS ED NC 2COU E FER RE RE TIMO E CO R A B L TIMO BAL D A TIC VER NC L AL ERE 9 EF A RDATUM 1

4 148 432.6 NK B-BA

@ 4.3%

BW 43 439 9.58 .50 BW 440 439 .08

8.58 0

6 147 434.0 NK B-BA

45

441.50

0 124 445.7 NK T-BA

40.50

00

25'+/-

PROP. "12HDPE

BWT-BANK 4 440 40.58 .50 BW 440440.08

441.10

441.00

5 123 444.7

440.5

DESIGNED BY:

E FER RE TIM L BA TI BAL

P: 410.225.0930 F: 410.225.0893

10400 STEVENSON RD. SUITE 101 STEVENSON, MD 21153 P: 410.602.8070

STRUCTURAL ENGINEER: MURRAY WEINER P.E. 130 ARCHIMEDES CT. PIKESVILLE, MD 21208 P: 410.303.7300 MEP ENGINEER: THOMAS FOULKES LLC. 1608 PARK AVENUE BALTIMORE, MD 21217 P: 410.262.1806

DOO CONSULTING 531 PICCADILLY ROAD BALTIMORE, MD 21204 P: 443.463.5859

2

430 6 191 425.4 E LIN TREE 3 187 425.4 OT

9 192 426.6 E LIN TREE

KANICS INCLUSIVE DESIGN SERVICES LLC. 196 W MEYER AVENUE NEW CASTLE, PA 16105 P: 724.652.9174

SP

OCHVIEW TERRACE LOT AREA 65,412 SF

425

7 193 426.5 E LIN TREE

CIVIL ENGINEERS: 9 186 423.9 SPOT

K BAC

0 185 422.7 OT

LINE ERTY PROP

210 9 184 424.8 SPOT

7 194 420.5 E LIN TREE

SP

0 195 419.2 E LIN TREE

1

F

4 180 417.3 SPOT

420

0

0

41

SP

415

3 174 414.4 E LIN TREE

30FT

SETB

ACK 1 179 410.9 SPOT

30 K BAC SET

2 199 411.4 NK T-BA

5

3 08/22/12 Permit Revision 3 No. Date Description

9 181 417.2 SPOT

4 182 417.8 OT

2 177 411.1 SPOT

1789.87 40 FND IP

7 176 411.7 OT

0' 65.0 W 1 " 0 6'0 87°1 .57' SP

2 175 409.9 E LIN TREE

N

4 200 408.2 NK T-BA

E Y LIN ERT ROP

164

Site Plan

Tower

GENERAL CONTRACTOR:

SPECIALTY CONSULTANTS:

(Tpipe 430.0)

Man-Made Grid

261 ROBERT ST. BALTIMORE, MD 21217

N

ISSUE SET

100% CD SET ISSUE 03-07-2013 ALTER URBAN PROJECT

Revisions

7 139 436.4 NK B-BA

5 138 440.3 OT

307 LOCHVIEW TERRACE LUTHERVILLE, MD

4

51 7.77 43 FND IP

440.57

2 52 429.9 H SM

/H SAN M 29.92 TOP-4 15.59 IN (1 )4 .80 8" INV 21 IN (2 )4 15.12 8" INV )4 OUT (3 .88 8" INV 15 IN (4 )4 8" INV

3 2 53 54 434.8 434.8 BC TC

OF ALTER URBAN LLC AND INTENDED FOR THE SPECIFIC PROJECT INDICATED. NOT TO BE USED FOR OTHER PROJECTS WITHOUT WRITTEN PERMISSION. ORIGINAL DRAWING PRODUCED FOR ARCH D SHEET (24x36).

EX. "8SAN

3

435

5 73 439.5 CL

439.50

440

View North

2

W TERRACE 5 0.30 56 440.7 55 44 BC TC

ED SLATTERY

Retaining Wall

House Grid

Orchard

e Slop

Line

Landscape Grid

View South Schematic Site Plan

Interacting Grid Analysis

By lowering the first floor level 1’-0”, the site was made accessible from front to back. The cut earth was moved to the NW side of the home behind a concrete retaining wall which grounds the home and allows the landscape to “flow” onto the green roof. Accessibility: 1. Access throughout entire site 2. Material variations create tactile and visual cues Sustainable: A. Large south facing glazing with overhang. B. Concrete wall, earthen berm, and coniferous planting minimize cold NW winds C. Deciduous tree provides summer shade and winter daylight on southern facade. D. Minimized north-facing openings. Recessed Entry. E. Indigenous plantings and rain garden. F. Solar panel array.

BC

BC

BC

EX. "8W

2

440 SP

4 41

443

0 50 443.3 tl "/m AIN4 DR 5 119 443.8 NK T-BA

SAN. CO

TW 444.00

0 140 436.9 NK B-BA

12.00' INV 435.41 (Tpipe 436.51)

439

INV 8 435.00 (Tpipe 436.10) 0 5 133 445.2 12 444.1 NK SPOT T-BA

440 (Tpipe 435.6)

INV 434.5

TW 440.94

inlet 438.5

2 132 444.4 OT SP

440 441

PE . "12HD PROP

440.70

BW 440.94

DRIVEWAY

A SETB

F

5 121 444.0 NK T-BA

2%

2%

13.51'

441.75

4.95

CK

% @ 1.0

7.30'

440.5

441.75

5 141 440.0 NK B-BA

25

22

441

442

.73

5

225.09' +/25.00' MIN

144

3 142 435.4 NK B-BA

441

33

INV 433.92 (5.0ft cover)

441.18

PROPOSED HOUSE FFE=441

25'+/31.71' +/-

5 443.8 NK T-BA

E

441.16

433.08) INV 431.98 (Tpipe (4.9ft cover)

8 151 436.2 NK B-BA

INV 430.76

(Tpipe 431.29) (0.71ft cover)

INV 430.19

5 43

25FT SE

59

SP

TBACK

INV 429.0

8 188 428.9 OT

(Tpipe 430.54) (0.46ft cover)

INV 429.44

6 189 430.7 SPOT

9 150 432.4 " 431.86) (Tpipe14 (1.1ft cover)

D

307 LOCHVIEW TERRACE LOT AREA 65,412 SF

GENERAL CONTRACTOR:

10400 STEVENSON RD. SUITE 101 STEVENSON, MD 21153 P: 410.602.8070

STRUCTURAL ENGINEER: MURRAY WEINER P.E. 130 ARCHIMEDES CT. PIKESVILLE, MD 21208 P: 410.303.7300

C

MEP ENGINEER:

H

THOMAS FOULKES LLC. 1608 PARK AVENUE BALTIMORE, MD 21217 P: 410.262.1806

Patio

425

KANICS INCLUSIVE DESIGN SERVICES LLC. 196 W MEYER AVENUE NEW CASTLE, PA 16105 P: 724.652.9174 CIVIL ENGINEERS:

H

H

0 185 422.7 OT

LINE ERTY PROP

210 ACK ETB MS FRO

9 186 423.9 SPOT

7 194 420.5 E LIN TREE

SP

0 195 419.2 E LIN TREE

I

4 180 417.3 SPOT

420 9 181 417.2 SPOT

4 182 417.8 OT

41

SP

I

3 416.3 INE

415

2 199 411.4 NK T-BA

J

30FT

SETB

ACK 1 179 410.9 SPOT

30 K BAC SET

410

3 174 414.4 E LIN TREE

5

2 177 411.1 SPOT

1789.87 40 FND IP

7 176 411.7 OT

0' 65.0 W 1 " 0 6'0 87°1 .57' SP

UP

2 175 409.9 E LIN TREE

7 201 405.7 OT SP

405

N

4 200 408.2 NK T-BA

INE TY L PER PRO

164

Floor Plan

N

FIRST FLOOR PLAN - PROPOSED 6" = 1'-0"

G

I

Green Roof (landscape continuity)

Functionality (central core)

ISSUE SET

03-07-2013 ALTER URBAN PROJECT

119.00 DRAWN BY

JCS

Accessibility (large wood structure, barrier free, open plan)

Guest House (Separation)

Exploded Axonometric

A Kitchen B Dining Room C Living Room D Mudroom/Laundry E Exercise Room F Garage G Guest Suite H Bathroom (Accessible) I Bedroom Organizational Diagram J Tower 100% CD SET ISSUE 3 08/22/12 Permit Revision 3 No. Date Description

420

0 183 420.0 SPOT

Sustainability (protective skin, evolving volume)

The Tower (contemplation, 360 view)

P: 410.225.0930 F: 410.225.0893

DOO CONSULTING 531 PICCADILLY ROAD BALTIMORE, MD 21204 P: 443.463.5859

7 193 426.5 E LIN TREE

5

261 ROBERT ST. BALTIMORE, MD 21217

H

I

SP

The Wall (foundation, family memory)

SPECIALTY CONSULTANTS:

6 191 425.4 E LIN TREE 3 187 425.4 OT

9 192 426.6 E LIN TREE

0 190 431.8 SPOT

9 184 424.8 SPOT

E ER BREAFLTIM B TI BAL

(Tpipe 430.0)

430

430

A

3' 395.3

BW 43 438 8.58 .50

50

432.46) INV 431.36 (Tpipe (2.5ft cover) 2 149 433.4 NK B-BA

' 95.38 "W 3 13'15 S 09°

BW 43 439 9.58 .50 BW 440 439 .08

4 148 432.6 NK B-BA

@ 4.3%

43

441.50

0 124 445.7 NK T-BA

6 147 434.0 NK B-BA

45

60"

0.50 @ 44 WALL 0 50LF 440.0 ALL @ .5LF W

25'+/-

PROP. "12HDPE

PATIO

BWT-BANK 4 440 40.58 .50 BW 440440.08

441.10

441.00

5 123 444.7

440.5

DESIGNED BY:

NO CE EN R E F RE EY R RV U SU S TAL TH N O RIZ ED TO AM HO C H ALL EREN NORT F RE TEM, PO SYS ED NC COU E FER ORE CO REEntry TIM RE A B L TIMO L A B A TIC VER NC L AL ERE F 19 RE TUM A D

87

441.18

BW 441.42 "12HD PE @ 3. 0%

307 LOCHVIEW TERRACE LUTHERVILLE, MD

Revisions

7 139 436.4 NK B-BA

5 138 440.3 OT

442

5.05

51 7.77 43 FND IP

440.57

2 52 429.9 H SM

3

440

00'

3 2 53 54 434.8 434.8 BC TC

4

R

439.50

/H SAN M 29.92 TOP-4 15.59 IN (1 )4 .80 8" INV 21 IN (2 )4 15.12 8" INV )4 OUT (3 .88 8" INV 15 IN (4 )4 8" INV

5 0.30 56 440.7 55 44 BC TC

1

EX. "8SAN 440.68

3 74 434.5 CL

435

5 73 439.5 CL

RE PROPERTY OF ALTER URBAN LLC AND INTENDED FOR THE SPECIFIC PROJECT INDICATED. NOT TO BE USED FOR OTHER PROJECTS WITHOUT WRITTEN PERMISSION. ORIGINAL DRAWING PRODUCED FOR ARCH D SHEET (24x36).

CHVIEW TERRACE

Living Kitchen Bedrooms Guest Gym/Pool Support (Pantry/Laundry/Mud) Garage

DIMENSION STA

1. FINISH FLOOR EL 2. ALL SPOT ELEVAT 3. U.N.O. ALL DIMEN

A. FROM FA B. ALL VERT

The main living area of the house was designed to provide maximum maneuverability and flexibility for the family. The roof line expands up only where required to provide headroom at the Art Loft while limiting the additional volume of the space. The result is an organic form which is accentuated by the cedar boards used on the interior and exterior.

KEY # 1 GREE 2 CEDA CUT, 2'-0" F 3 GLUL 4 ASPH 5 BRAK CLAD INSTA 6 1/2" D DRAW 7 8 EXPO 9 HARD IRON REQU 10 WALK 11 CONC 12 CEDA 13 CONC 14 EPDM 15 STRU 16 SKYL SPEC 17 CEDA 18 GRAV 19 META COLO INSTA

Section Looking North Art Loft Pool

DIMENSION STANDARDS

LONGITUDINAL SECTION @ LIVING SPACES LOOKING NORTH 1 1/4" = 1'-0"

Kitchen Dining

Living

Guest Suite

1. FINISH FLOOR ELEVATION OF 2. ALL SPOT ELEVATIONS SHAL 3. U.N.O. ALL DIMENSIONS SHAL

A. FROM FACE OF STRU B. ALL VERTICAL DIMEN FINISH FLOOR). C. TO CENTERLINE OF W

4. REFER TO STRUCTURAL DRA 5. REFER TO ARCHITECTURAL E ELEVATIONS. 6. WINDOW SILL HEIGHTS TO BE ARCHITECTURAL ELEVATIONS

ART LOFT 200

CARPORT 123

LIVING/DINING 107 PATIO 122

2

CROSS SECTION @ LIVING ROOM LOOKING EAST 1/4" = 1'-0"

3

LIVING/DINING 107

CROSS SECTION @ LIVING ROOM LOOKING WEST 1/4" = 1'-0"

B 3 1

4 2 A

Dining Room, Kitchen, & Art Loft

Accessibility: 1. Handrails encourage mobility out of the wheelchair. 2. Radiant concrete floors helps with poor lower-limb circulation. 3. Material variations create tactile and visual cues. 4. Accessible kitchen. Touch-open cabinets simplify operation and eliminate protruding knobs. Upper cabinets and Cook top are installed with power lift systems to allow for variable heights. Sustainable: A. Exterior + Interior Walk-off mats reduce indoor air pollutants. B. LED lighting and recycled cardboard pendant fixtures.

ENT 100

27

59

6 189 430.7 SPOT

2 154 436.2 E LIN TREE

1 168 432.6 SPOT 1 167 430.5 NK T-BA

430

NE RTY LI PROPE

Bed

SP

425

SP

0 185 422.7 OT

7 194 420.5 E LIN TREE

SP

0 195 419.2 E LIN TREE

4 180 417.3 SPOT

420

420

0 183 420.0 SPOT

0 172 421.1 E LIN TREE

9 181 417.2 SPOT

4 182 417.8 OT

41

SP

Bed

3 173 416.3 E LIN TREE

Bed

415

3 174 414.4 E LIN TREE

30FT

4 198 414.4 NK T-BA

5 202 412.0 SPOT

410

SETB

ACK 1 179 410.9 SPOT

30 K BAC SET

Tower

5

1 171 419.5 NK T-BA

2 199 411.4 NK T-BA

3 08/22/12 Permit Revision 3 No. Date Description

5 203 416.0 SPOT

CIVIL ENGINEERS: 9 186 423.9 OT

Suite

9 184 424.8 OT

7 170 424.0 NK T-BA

425

7 193 426.5 E LIN TREE

LINE ERTY PROP

0 169 427.6 SPOT

KANICS INCLUSIVE DESIGN SERVICES LLC. 196 W MEYER AVENUE NEW CASTLE, PA 16105 P: 724.652.9174

SP

307 LOCHVIEW TERRACE LOT AREA 65,412 SF

3 161 426.1 LE PO

Bed

DOO CONSULTING 531 PICCADILLY ROAD BALTIMORE, MD 21204 P: 443.463.5859

6 191 425.4 E LIN TREE 3 187 425.4 OT

9 192 426.6 E LIN TREE

210 ACK ETB MS FRO

Kit.

SP

SPECIALTY CONSULTANTS:

(Tpipe 430.0)

0 190 431.8 SPOT

TBACK

4 205 425.6 SPOT

INV 429.0

SP

THOMAS FOULKES LLC. 1608 PARK AVENUE BALTIMORE, MD 21217 P: 410.262.1806

430

25FT SE

8 155 435.4 E LIN TREE

8 188 428.9 OT

(Tpipe 430.54) (0.46ft cover)

INV 429.44

2 436.79 s l gp Dnai DAR

TBACK

435

STAN

(Tpipe 431.29) (0.71ft cover)

INV 430.19

5 43

TI BAL TI BAL

2 177 411.1 SPOT

1789.87 40 FND IP

7 176 411.7 OT

0' 65.0 W 1 " 0 6'0 87°1 .57' SP

7 166 406.8 SPOT

2 175 409.9 E LIN TREE

7 201 405.7 OT SP

405

400

164 6 D 397.5 IP FN

ROPOSED SITE PLAN-PERMIT EVISION 1" = 30'-0"

1 165 398.6 7 OT SP 163 398.0 LE PO

N

4 200 408.2 NK T-BA

INE TY L PER PRO

164

N

Surrounding Views

Revisions

437.0

26

7 204 421.1 OT

INV 430.76

9 150 432.4 " 431.86) (Tpipe14 (1.1ft cover)

25FT SE

2 160 437.2 SPOT

43 INV 431.36 (Tpipe (2.5ft cover) 2 149 433.4 NK B-BA 8 151 436.2 NK B-BA

THIS DESIGN AND DRAWING ARE PROPERTY OF ALTER URBAN LLC AND INTENDED FOR THE SPECIFIC PROJECT INDICATED. NOT TO BE USED FOR OTHER PROJECTS WITHOUT WRITTEN PERMISSION. ORIGINAL DRAWI

25.73'

0 156 441.7 E LIN TREE

' 447.73

SP

' 447.55 9'00" E N 11°2

9 157 441.6 OT

BW

08

BW 43 438 8.58 .50

8.50

437.15

8 152 440.5 NK B-BA

3' 395.3

13

L @ 43 F WAL 34.0L

' 95.38 "W 3 13'15 S 09°

440

5 153 443.4 E LIN TREE

Custom Chairlift

View from100% top of Tower CD SET ISSUE ISSUE SET

The tower’s custom chairlift utilizes rope, pulleys and electronics to determine the user’s weight119.00 and strength and set the assistance accordingly, so that the user will be challenged and supported. 03-07-2013

ALTER URBAN PROJECT

JCS

DRAWN BY

REVIEWED BY

SHEET NAME

SITE PLAN SHEET NUMBER

C102

Tower

South View

Gallery

DIMENSION STANDARDS:

1. FINISH FLOOR ELEVATION OF THE FIRST FLOOR (01-FIRST FLOOR) SHALL BE SET AT: 0'-0". 2. ALL SPOT ELEVATIONS SHALL BE MEASURED FROM THE FIRST FLOOR FINISH ELEVATION, 0'-0". 3. U.N.O. ALL DIMENSIONS SHALL BE READ AS FOLLOWS: A. FROM FACE OF STRUCTURE IN NEW WALLS INCLUDING MASONRY AND WOOD FRAME. B. ALL VERTICAL DIMENSIONS TO BE MEASURED FROM TOP OF A.F.F. (ARCHITECTURAL FINISH FLOOR). C. TO CENTERLINE OF WINDOW / DOOR / OPENING.

4. REFER TO STRUCTURAL DRAWINGS FOR "BOTTOM OF STRUCTURE" ELEVATIONS. 5. REFER TO ARCHITECTURAL ELEVATIONS AND WALL SECTIONS FOR "TOP OF WALL" ELEVATIONS. 6. WINDOW SILL HEIGHTS TO BE DIMENSIONED FROM ASSOCIATED LEVEL. REFER TO ARCHITECTURAL ELEVATIONS FOR DIMENSIONS.

LONGITUDINAL SECTION @ RAMP/TOWER 1/8" = 1'-0"

2 3 4 5 6

7 8 9 10 11 12 13

Gym

Longitudinal Section at Ramp/Tower 1

KEY # 1

Garage

PROPOSED KE

SKYLIGHT ON BUILT-UP CURB SPECIFICATIONS. NEW LIGHT FIXTURE. SEE ELE OPEN TO SKYLIGHT ABOVE. ARCHITECTURAL PRECAST C CONCRETE WALL. PROVIDE S APPROVAL PRIOR TO FABRIC GREEN ROOF SYSTEM AND P BRAKE METAL FASCIA AND G WINDOW/DOOR CLADDING. P APPROVAL PRIOR TO INSTAL SIZES, AND FLASHING. GREENSCREEN: WALL HUNG DESIGN AND SHOP DRAWING CONCRETE FLOOR. SEE PLAN RAMP. SEE PLAN AND DETAIL FINISHING. SAND-BLASTED INTERIOR CO RAIN BARREL. TIE DOWNSPO EPDM ROOF. SEE DETAILS. CONCRETE SITE WALL.

Accessibility: 1. Flush shower transition allows for roll-in access as needed. 2. High gloss acrylic panels provide reflective visual cues. Scratch and impact resistance allows for ease of cleaning. 3. Hand showers and grab bars. 4. Roll under vanities provide maximum comfort and ease of access. 5. Mirrored surface down to top of vanity aids in hand-eye coordination tasks. 6. Wall mounted toilet allows for maximum clearance and ease of cleaning. 7. Grab bars. 8. Sandblasted floor pattern provides visual cues as well as slip resistance. Sustainable: A. Dual flush toilet bowl reduces water consumption. B. Counter tops made from recycled glass and cement. 3 2

A 5 B

7

4 6

1 8

Typical Bathroom

3

B

Art Loft

Ramp to Tower

3

Gym/Exercise Room

Greenscreen units along the East facade of the bedroom wing will provide vertical green cover up towards the green roof. The plant layer will help reduce heat gains on the bedroom walls.

Suite

Kit.

Bed Bed

Lig ng

Rear Patio & Backyard

or

ni

Bed

M

Tower

ht

Bed

Solar Orientation

Green Roof Earth Berm

Preliminary Section Diagram

Vertical Planting Sun Shading

Green Roof