Instructions Subject: CEV Manifold Alignment Fixture - Amazon Web ...

Report 1 Downloads 20 Views
020003445 2/11

Instructions Subject: CEV Manifold Alignment Fixture FOUR PORT KIT (020003434) Part Number

Figure 1

Description

Quantity

0901005

8-32x1/2” Phillips Head Screw

5009080

O-ring .239 x .070

8

5009763

O-ring .362 x .103

4

5010332

Insul Manifold Int Carb

1

5011929

Tube 6-8 Valve #4 Water

1

5011930

Tube 5-6-8 Valve #2 Water

1

5011931

Tube 6-8 Valve #3 Water

1

020000986

Raised Four Port Manifold

1

* 020003244

Manifold Fixture - Top

1

* 020003433

Manifold Fixture - Bottom

020003413

10-24x3/8” Cap Screw

020003445

Instructions

5 (1 extra)

1 3 (1 extra) 1

FIVE PORT KIT (020003435) Figure 2 - Manifold & Mounting Plate

Figure 3 - Remove mounting plate & replace these three (3) center tubes (provided).

Part Number

Description

Quantity

0901005

8-32x1/2” Phillips Head Screw

5 (1 extra)

5009080

O-ring .239 x .070

10

5009763

O-ring .362 x .103

4

5010332

Insul Manifold Int Carb

1

5011929

Tube 6-8 Valve #4 Water

1

5011930

Tube 5-6-8 Valve #2 Water

1

5011931

Tube 6-8 Valve #3 Water

1

020000987

Raised Five Port Manifold

1

* 020003244

Manifold Fixture - Top

1

* 020003433

Manifold Fixture - Bottom

1

020003413

10-24x3/8” Cap Screw

020003445

Instructions

3 (1 extra) 1

Important Please read all instructions before starting TOOLS REQUIRED: Phillips Head Screwdriver & 5/32 Allen Wrench 1. Shut off C02 and water. Figure 4 - Gap below bottom O-ring * If 2-piece SS manifold fixture already exists, replacement of tubes is not necessary.

2. Depressurize the water system and bleed pressure down. 3. Disconnect the power supply and remove the merchandiser, bonnet, light kit and refrigeration deck. (Figure 1) 4. Depressurize and shut down syrup pumps to three (3) valves having tubes replaced. 5. Remove manifold and stainless steel (SS) or plastic mounting plate fixture. (Figure 2 & Figure 3).

Figure 5 - Proper Alignment

Manitowoc Beverage Systems Sellersburg, 2100 Future Drive, Sellersburg, IN 47172, Tel: 812-246-7000, www.manitowocbeverage.com

CEV Manifold Alignment Fixture

020003445 2/11 6. Remove three (3) valves and valve blocks associated with the three (3) manifold tubes being replaced. 7. Align new fixture bottom by sliding tubes into bottom groove (Figure 4). While holding bottom fixture, slide the new fixture top (Figure 5) into bottom groove. 8. Making sure the new fixture top and new fixture bottom is located properly (Figure 5 & Figure 6), use a Phillips screwdriver to fully tighten three (3) screws. 9. Using pre-lubricated o-rings (supplied), replace all o-rings on remaining tubes going into manifold.

Figure 6 - Tighten with 5/32 Allen Wrench

10. Place manifold onto tubes and screw the four (4) screws (020001284) to new manifold fixture with a phillips head screwdriver (Figure 7). 11. Adjust manifold plungers to their previous locations regarding carbonated or non-carbonated. 12. Pressurize water system C02 and syrup pumps. Check for leaks. 13. Reinstall refrigeration deck and light kit. Fill tub until full. 14. Apply manifold insulation. (Figure 8) 15. Reconnect power supply. Check for leaks. 16. Reinstall bonnet and merchandiser.

Figure 7

NOTE: •

Not all o-rings will be needed if replacing the three (3) tubes is necessary (Figure 3)



Discard old tubes. These tubes are NOT to be used on any other units.



On five (5) valve units with four (4) port manifolds due to the #1 water location on four (4) and five (5) port manifolds being different. Part #’s stay the same but tube call outs change from: #2 water to #1 water - 5011930

Figure 8

#3 water to #2 water - 5011931 #4 water to #3 water - 5011929

Manitowoc Beverage Systems Sellersburg, 2100 Future Drive, Sellersburg, IN 47172, Tel: 812-246-7000, www.manitowocbeverage.com