Masdar Headquarters Building - Thornton Tomasetti

Report 4 Downloads 82 Views
Masdar Headquarters Building  Abu Dhabi, U.A.E. 

2009 Thornton Tomasetti Annual Meeting  Wincy Law, Project Engineer, LEED AP  May 8, 2009

Masdar Headquarters Building  Abu Dhabi, U.A.E. 

RWDI: Wind Tunnel Test 1:300 Model

Masdar Headquarters Building  Abu Dhabi, U.A.E. 

Isometric View from Revit

Structural Components 

Cones

Structural Components 

Lower Trellis: Peel Cones 

Structural Components  Lower Trellis: Mesh Lower Trellis: Peel  Cones 

Structural Components  Truss Lower Trellis: Mesh  Lower Trellis: Peel  Cones 

Structural Components  Upper Trellis: Top Chord Bracing Truss  Lower Trellis: Mesh  Lower Trellis: Peel  Cones 

Geometry: Upper Trellis  §  Max cantilever = 57m  §  Upper Trellis = 7 acres  194m (637ft)    m 34 t  2f 11

57

m    7ft

120m (394ft) 

18

31.5m  103ft 

 

m

53

57 m  18 7 ft  

ft

4 17

285m (935ft) 

Geometry: Upper Trellis  §  Max cantilever = 57m  §  Upper Trellis = 7 acres  (» 3 X Wrigley Field)  194m (637ft)    m 34 t  2f 11

57

m    7ft

120m (394ft) 

18

31.5m  103ft 

 

m

53

57 m  18 7 ft  

ft

4 17

285m (935ft) 

Connection Design  §  ANSYS

Site Photos 

Courtesy of RWA

Site Photos 

Courtesy of RWA

Masdar Headquarters 

Courtesy of Adrian Smith + Gordon Gill Architecture