Panama Canal Expansion Dredging

Report 10 Downloads 248 Views
PANAMA CANAL EXPANSION DREDGING Presented by: Rogelio A.Gordon W. Executive Manager Dredging Division Panama Canal

Where are we located

The Panama Canal Main components

Atlantic Ocean

Gatun Locks Gatun Dam

Gatun Lake

Madden Dam

Gaillard Cut

Madden Lake

Pedro Miguel Locks

Miraflores Lake Miraflores Locks

Miraflores Spillway

Pacific Ocean

Longitudinal Profile of the Panama Canal

GAILLARD CUT MIRAFLORES LAKE GATUN LAKE

ATLANTIC OCEAN

Elev = 25.9 M

Elev = 16.5 M

PACIFIC OCEAN

GATUN LOCKS

PEDRO MIGUEL LOCKS

MIRAFLORES LOCKS

Canal Excavation Summary

1882-1895 60(23) French effort

1904-1914 201

1914-1986 271 70

1954-2014 394

2008-2014 545 151

123

178 U.S. construction

Landslides (postconstruction)

Improvement projects

Canal Expansion

Widening Efforts

to 715 ft

2003 - 2014

to 630 ft

1994 - 2001

From 300 ft to 500 ft

1955 - 1971

Deepening Efforts Year 1953 1967 1976 2005 2014

40 ft 45 ft 48 ft 51 ft 55 ft

Referred to 85 ft Mean Lake Level

Canal Expansion Program Components 25 M m3 Atlantic Pospanamax Locks Deepening and widening Atlantic entrance

Increase of the maximum operating level of Gatun Lake 26.7 m

27.1 m

Pacific Postpanamax Locks

10  M m3

Gatun Lake widening and deepening and widening of Gaillard Cut navigation channels (26.5Mm3)

Deepening & Widening Pacific Entrance

Disposal Sites Potential Barge Disposal (17.3 Mm³) Potential Barge Disposal (32 Mm³)

Gatun Locks

Disposal sites

Gatun Lake

Potential Barge Disposal (42.2 Mm³)

Baseline studies Evaluation of existing environmental conditions Technical Factors (site preparation, use, and material transportation methods) Environmental Impacts Mitigation and environmental monitoring requirements Gamboa

Frijoles Barge Disposal (11 Mm³) Trinidad Barge Disposal (20 Mm³)

Potential Barge Disposal (22.3 Mm³)

Designated Cutter Suction Dredge Disposal

Pedro Miguel Locks Miraflores Locks

Tabernilla Barge Disposal Full Designated Cutter Suction Dredge Disposal

Balboa

HIGH ENVIRONMENTAL STANDARDS Environmental Requirements: Environmental Impact Studies and Enforcing Resolutions Panamanian Laws and Regulations Panama Canal Authority Standards Multilateral Development Banks Requirements Public Participation Environmental and Health & Safety Aspects Addressed: Noise and Vibrations Air Quality Water Management Awareness Training Solid and Hazardous Waste Management Erosion and Sedimentation Control Wildlife Rescue Occupational Health and Industrial Hygiene Cultural Resources Protection