02-09-2017 Cost of Services Presentation

Report 0 Downloads 31 Views
Town of Tupper Lake Water and Sewer District Consolidation Study What Exists: Cost of Services 2/9/2017 (updated 2/18/17)

Visit the website: http://www.danc.org/operations/engineering/tupper-lake-watersewer-consolidation-study

Components of Water/Sewer Billing • Each Town Water/Sewer Customers is billed for water and sewer services based on the following factors: 1) Village Rates for Outside Users 2) Town Rate based on existing debt service for the district 3) Town Rate based on existing operation/maintenance costs for the district

2

Village Water Rates • Established by Village Code – §50-6, “Flat Rate Schedule” – §50-7, “Metered Service Rate”

• The only metered Town customer is the Wild Center, and they pay the same rate as a Village metered customer. • The Minimum Charge Per Month for Inside Village Water Customers is: – $21.20/ month or $254.40 per year, vs. $354.40 for Town Water Customers

• Code Sections located on webpage – http://www.danc.org/files/public/Tupper/VTLWaterRents.pdf 3

4

5

Village Sewer Rates • Established by Village Code – §41-3, “Flat Rate Schedule” – There are no sewer flow meters in the system

• The Minimum Charge Per Month for Inside Village Sewer Customers is: – $22/ month or $264 per year, vs. $326.40 for Town Water Customers

• Code Sections located on webpage – http://www.danc.org/files/public/Tupper/VTLSewerR ents.pdf 6

7

8

Town Water District Debt Summary • 28 Town Water Districts • Includes 1 “district extension” with separately managed debt and 1“special case” – WD#8-2 is District Extension – WD#17 Other is special case where 30 parcels in the district were not taxed correctly for debt for several years; they are now back-charged for taxes owed

• 21 districts/extension are already debt free • 1 district, WD#15, will be debt free in 2017 9

Town Water District Debt Details • WD#3 will have new debt in 2017 • WD#7 has two outstanding loans from 2015 AUD – $46,746 owed; paid off in 2019 – $192,916 owed; paid off in 2031

• WD#8-2 – $48,279 owed; paid off in 2019

• WD#16 – $24,304 owed; paid off in 2019

• WD#17 • WD#17-Other – $248,000 owed; paid off in 2035

Total Outstanding WD Debt from 2016 AUD = $341,047 10

Town Sewer District Debt Summary • 25 Town Sewer Districts • Includes 3 “district extensions” with separately managed debt and 1 “special case” – SD#8-2 is a District Extension – SD#8-2 Other is a special case where two property owners paid off their portion of the district debt in full and are only taxed for the maintenance fee. – SD#17-1 is a District Extension – SD#17-2 is a District Extension

• 18 districts/extensions are already debt free • 2 districts, SD#8-2 and SD#16, will be debt free in 2019 11

Town Sewer District Debt Details • SD#5 has 2 outstanding loans from 2015 AUD – $213,333 owed; paid in 2021 – NYSEFC loan; $86,327 owed; paid off in 2035 • SD#8-2 has 2 outstanding loans – $25,989 owed; paid in 2019 – $2,000 owed; paid in 12/2017

• SD#16 – $10,975 owed; paid in 2019 • SD#17 – $53,875 owed; paid in 2035 • SD#17-1 – $136,698 owed; paid in 2035 • SD#17-2 – $59,881 owed; paid in 2035 • SD#23 – $1.85M owed; paid in 2038

Total Outstanding Debt from 2015 AUD = $2.4M 12

Water District User Cost Summary District

EDUs

WD01 WD02 WD03 WD04 WD05 WD06 WD07 WD08 WD08-2 WD09 WD10 WD11 WD12 WD13 WD14 WD15 WD16 WD17 WD17 “Other” WD18 WD19 WD20 WD21 WD22 WD24 WD25 WD26 WD27

123 12 46 8 49 1 176 32 31 42 1 49 6 1 1 17 13 87

Town Debt/EDU Town O&M/EDU 2016 2016 $0 $15 $0 $0 $45.87 $50 $0 $0 $0 $20 $0 $0 $160.75 $60 $0 $20 $143.19 $20 $0 $20 $0 $0 $0 $20 $0 $0 $0 $0 $0 $0 $58.60 $45 $270.99 $25 $40.38 $20

Total Town Costs/EDU $15 $0 $95.87 $0 $20 $0 $220.75 $20 $163.19 $20 $0 $20 $0 $0 $0 $103.60 $295.99 $60.38

Village Cost/EDU

$340.80

Total Cost/EDU $355.80 $340.80 $436.67 $340.80 $360.80 $340.80 $561.55 $360.80 $503.99 $360.80 $340.80 $360.80 $340.80 $340.80 $340.80 $444.40 $636.79 $401.18

30

$158.47

$20

$178.47

$519.27

1 3 5 3 2 3 25 1 0

$0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0

$340.80 $340.80 $340.80 $340.80 $340.80 $340.80 $340.80 $340.80 $0.00

$0

13

Town of Tupper Lake O&M Charges • Charges are based on Village “eligible” pass through costs as detailed in the Town/Village Intermunicipal Agreement (2005) • Pumping Stations

14

Town of Tupper Lake O&M Charges • Individual Grinders

15

Town of Tupper Lake O&M Charges

16

Sewer District User Cost Summary Sewer District

EDUs

Town Debt/EDU

Town O&M/EDU

Total Town Cost/EDU

Village Cost/EDU

SD01

98

$0

$15

$15

$341.40

SD02

12

$0

$15

$15

$341.40

SD04

8

$0

$15

$15

$341.40

SD05

117

$294.89

$70

$364.89

$691.29

SD06

1

$0

$0

$0

$326.40

SD08-1

31

$112.90

$20

$132.90

$459.30

SD8-2

32

$309.53

$25

$334.53

$660.93

SD8-2 Other

2

$0

$25

$25

$351.40

SD11

4

$0

$0

$0

SD13

2

$0

$0

$0

$326.40

SD14

1

$0

$0

$0

$326.40

SD15

18

$0

$20

$20

$346.40

SD16

18

$380.75

$15

$395.75

$722.15

SD17

46

$384.76

$50

$434.76

$761.16

SD17-1

45

$151.89

$85

$236.89

$563.29

SD17-2

26

$110.93

$85

$195.93

$522.33

SD18

1

$0

$0

$0

$326.40

$326.40

Total Cost/EDU

$326.40

17

Sewer District User Cost Summary (Cont.)

Sewer District

EDUs

Town Debt/EDU

Town O&M/EDU

Total Town Cost/EDU

Village Cost/EDU

SD20

5

$0

$0

$0

$326.40

SD21

3

$0

$15

$15

$341.40

SD22

2

$0

$0

$0

$326.40

SD23

275

$329.63

$90

$419.62

SD24

3

$0

$0

$0

$326.40

SD25

29

$0

$0

$0

$326.40

SD26

1

$0

$0

$0

$326.40

SD27

0

$0

$0

$0

$326.40

$0

Total Cost/EDU

$746.02

$0

18

Questions or Comments? Carrie Tuttle DANC Director of Engineering 315-661-3259 [email protected]

Kevin Schwenzfeier Department of State Local Government Specialist 518-474-7632 [email protected]

Star Carter DANC GIS Supervisor 315-661-3261 [email protected] 19