Date: Job Name: Address: C Below Job No. Technician:
May 11, 2012 Elmer Ave Phase II Potholing Elmer Ave, Los Angeles, CA 229 Joseph Cervantes
Project Summary No.
Utility
Size
Material
Top Depth (ft)
Direction
Location
Surface
1
Gas
2”
Poly
3.58
E-W
Southeast of intersection for Elmer Ave. and Stagg Street
Asphalt
Comments: Top depth is measured from ground surface to top of utility. Potholes were performed at locations specified by the client. Utility size and material are based on visual estimates and may vary.
229 Elmer Ave Phase II Potholing
www.cbelow.com
Page 1
POTHOLING DATA SHEET 14280 EUCLID AVE., CHINO, CA 91710 OFFICE: (888) 902-3569 FAX: (909) 606-6555
www.cbelow.net Technician Name
Date
C Below Project No.
Joseph Cervantes
5-11-12
229 Project Address
Project Name
Elmer Ave Phase II Pothole
Elmer Ave., Los Angeles, CA
Client Company
Contact
Tetra Tech
Jason Fussel
Pothole No.
Location
1
Southeast of intersection for Elmer Ave. and Stagg Street
Surface Type: Thickness:
Profile View (not to scale) Measured Distance from Finished Surface
Asphalt (in)
7
Notes:
Top:
3.58
(feet)
Bottom:
3.75
(feet) (in)
2
Size: Utility:
Gas
Material:
Poly
Direction:
E-W
PHYSICAL SWING TIE INFORMATION No.
Distance (ft)
Dir.
From Permanent Existing Fixture
No.
Distance (ft)
Dir.
From Permanent Existing Fixture
No.
Distance (ft)
Dir.
From Permanent Existing Fixture
1
15.58
NE
Face of Power Pole
2
19.75
NW
Center of Comm MH
3
31.50
SW
Center of Sewer MH
HAND SKETCH
229 Elmer Ave Phase II Potholing
www.cbelow.com
Page 2
No.
Utility
Size
Material
Top Depth (ft)
Direction
Location
Surface
1
Gas
2”
Poly
3.58
E-W
Southeast of intersection for Elmer Ave. and Stagg Street