2013/14 ANNUAL PERFORMANCE REPORT

DEPARTMENT

Office of the Chief Operating Officer

2013/14 Annual Performance Report for Mogale City Local Municipality

Strategic goal/ objectives: To ensure sound governance practices within the municipality Section: IDP Baseline

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

1

1 Process plan submitted

1 Process plan submitted

1 Process plan submitted

No. of IDP Road show reports

1

2

1

2

No. of IDP Public advertisement published on the Website and newspapers

3

3

3

3

No. of draft IDP submitted for IDP tabled in Council

2

2

2

2

No. of SDBIP submitted to the Annual SDBIP Municipal Manager for the Executive Mayor's approval

1

1 submitted in July 13

1

1

Submission to National and No. of Reports submitted Provincial Departments

4

1 Draft IDP, 1 final IDP and 1 SDBIP

4

1 Draft IDP, 1 final IDP and 1 SDBIP

Mid-year or Section72 Report

1

1

1

1

Project Name Key Performance Indicator

No. of IDP Process Plan submitted for Council adoption

IDP Development and Review

No. of mid-year reports submitted to the MM

Tabling of No. of Annual Reports submitted Municipal to Council Annual Report

1

1

1

OPERATIONAL EXPENDITURE: Office of the Chief Operating Officer

2

Explanation of Variance

The new Annual Report process plan requires that the Annual Report be table in Council twice

Mitigation Measures

2012/13 Annual Performance Report for Mogale City Local Municipality

Strategic goal/ objectives : To ensure sound governance within the municipality Department: Municipal Financial Management Section : Revenue Enhancement 2012/13 Previous 2013/14 Current Explanation of Project Name Key Performance Baseline Annual Target year performance year performance Variance Indicator

% budgeted revenue billed.

96%

94%

Baseline

Annual Target

Free Basic Services

% of households earning less that R2400 per month with access to free basic services

100%

95%

100%

100%

_

_

Credit Control

%collected versus billed revenue on main tarrif

94%

93%

94%

96%

_

_

Revenue Management

96%

100%

_

Mitigation Measures

_

Section : Credit Control Project Name

Key Performance Indicator

2012/13 Previous 2013/14 Current Explanation of year performance year performance Variance

OPERATIONAL EXPENDITURE: Municipal Financial Management

Mitigation Measures

2012/13 Annual Performance Report for Mogale City Local Municipality

Section : Budget and Treasury Office Project Name

Key Performance Indicator

Budget Compilation Process plan

No. of Budget plans submitted for Council

Budget related documents placed on the website

No. of budget related documents submitted for placement on the website

Annual Financial Statements

Timely submission of annual financial statements to the AG

Key Performance Indicator

Expenditure Management

% of All creditors settled within 30 days

Mitigation Measures

Annual Target

1

1

1

1

_

_

12

14

12

14

_

_

1

financial statement submitted to the AG

1

1 financial statement submitted to the AG

_

_

Baseline

Annual Target

Section : Expenditure Management Project Name

2012/13 Previous 2013/14 Current Explanation of year performance year performance Variance

Baseline

77%

80%

2012/13 Previous 2013/14 Current Explanation of year performance year performance Variance

77%

76%

OPERATIONAL EXPENDITURE: Municipal Financial Management

Cash Flow Challenges

Mitigation Measures

Cash Flow Turn Around Strategy approval and implementation

DEPARTMENT Economic Services

2013/14 Annual Performance Report for Mogale City Local Municipality

Strategic goal/ objectives: to provide sustainable services to the community Department: Economic Services Project Baseline Annual Target Key Performance Location Project Name Indicator (Ward) Management Support (Jobs created)

All wards

No. of jobs created and facilitated

Section: Enterprise Management Project Key Performance Project Name Location Indicator (Ward) All wards No. of SMMEs training intervention implementated

SMME Programme

Cooperatives support Program

All wards

Time taken to register compliant business applications received

All wards

No. of business inspections conducted

All wards

Stages for the implementation of targeted training and mentorship programme

2012/13 Previous year performance

2013/14 Current year Explanation of performance Variance

To engage private developers

New target

280

_

Baseline

Annual Target

2012/13 Previous year performance

New target

8

_

15

High training demand due to more SMME registered

_

New target

30 days

_

14 days

Increasing efficiency registration was done bi-monthly

_

Daily inspections conducted with assistance from interns

_

High demand for training requests received from cooperatives as result Executive Mayor's pronouncement on the establishment of cooperatives

_

New target

New target

320000%

Stage final: 30 cooperartives registered in the incubator programme

235

Not all projects (Leratong Node shopping centre) were realised as planned

Mitigation Measures

2013/14 Current year Explanation of performance Variance

_

_

OPERATIONAL EXPENDITURE: Economic Services

406200%

50 cooperatives registered

Mitigation Measures

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Development and Planning Project Name

Development planning applications Development planning: Regional Planning Development planning: Building plan

Project Location (Ward)

Key Performance Indicator

All wards

Time taken to submit complaint Applications to the Section 80: Portfolio Committee

All wards

No. of Precinct Plan Developed

All wards

Time taken to approve complaint building plans

Section: Rural Development Project Project Name Location (Ward) Disaster Management Emergency All wards relief interventions

Commonage Programme Implementaiton

30 and 31

Key Performance Indicator % of total number of emergency cases responded to as compared to cases resolved

Stages for town planning application for the commonage programme

Annual Target

2012/13 Previous year performance

60 days

All compliant applications were referred te section 80 meetings within 30 days of reaching compliance

30 Days

_

_

1

Consultant appointed by National Development of Rural Development to draft a Precint Plan for World Hertage area.

1 draft precinct plan developed

_

_

60 days

60 days

Compliant builidng plans were approved within 30 days - 45 days

All building plans were approved within 45 days of becoming compliant

_

_

Baseline

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

Explanation of Variance

Mitigation Measures

100%

100%

100%

100%

_

_

Stage 4 Stages of Town planning register completed.

EIA application underway as scheduled, public participation and public comments has been addressed and submitted as part of the EIA compliance requirements by GDARD

Baseline

60 days

New target

EIA application submitted

2013/14 Current year Explanation of performance Variance

OPERATIONAL EXPENDITURE: Economic Services

Mitigation Measures

A meeting was held with The township Developement and application has not yet Planning to facilitate the The township been approved by the approval of the submitted application submitted Executive Mayor thus application , the for approval the township registry applications has since could not be created been submitted for prior the approval. approval to enable the registration process.

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Enterprise Management Project Name

Neighbourhood Development Grant

Project Location (Ward)

7

Key Performance Indicator

Stages for the construction of walkways between Kagiso and Leratong

Baseline

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

Renegeration Contractor Final Stage : strategy appointed by Regeneration Appointment of submitted and April 2014 and 4 strategy contractor for approved by km of 6 km of submitted and the construction Section 80 and walkways approved by of Walkways Project plan be constructed Section 80 between Kagiso submitted to between Kagiso and Leratong National Treasury and Leratong. for approval.

CAPITAL EXPENDITURE : Economic Services

Explanation of Variance

Mitigation Measures

_

_

DEPARTMENT Social Services

2013/14 Annual Performance Report for Mogale City Local Municipality

Strategic goal/ objective: to ensure sustainable service delivery to the community Department: Social Services Project Name

Key Performance Indicator

Baseline

Annual Target

2012/13 Previous year performance

All wards

No.of co-operatives established and/or supported

New target

3

_

All wards

No. of jobs created and sustained through EPWP programme

New target

100

_

122

Baseline

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

New KPI

4

_

5

Project Location (Ward)

2013/14 Current year performance

2 Cooperatives were established. and 21 existing cooperatives supported

Explanation of Variance

Mitigation Measures

_

_

22 more jobs created as permission was granted to review and add more projects on EPWP.

_

Jobs created

Section: Social upliftment Project Project Name Location (Ward)

Key Performance Indicator

No. indigent registration programme awareness campaigns facilitated

Poverty Alleviation

All wards

Stages for profiling indigent households in rural and informal settlements

No. of poverty alleviation projects implemented

Final Stages: Survey conducted on indigent households in Muldersdrift, Hekpoort, New target Magaliesburg and Tarlton, Tudor Shaft, Soul City, Pangoville, Makhulu gama, Coronation Park

7

6

_

5

OPERATIONAL EXPENDITURE Department : Social Services

Survey conducted on indigent households in Muldersdrift, Hekpoort, Magaliesburg,Tarlton, Tudor Shaft, Soul City, Pangoville, Makhulu gama and Coronation Park. Close out report was submitted to EXCO

8

Explanation of Variance

Mitigation Measures

_

_

_

_

More budget available to implement 2 more projects

_

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Social upliftment Project Project Name Location (Ward)

Local Action Programme for Children

Gender empowerment

Key Performance Indicator

Baseline

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

Explanation of Variance

Mitigation Measures

_

_

No. of training interventions on Early Childhood development programme

New KPI

2

_

4

Alignment with the New Children's Act on places of care for children led to the introduction of 2 more training interventions

No. of programmes Facilitated for Child Development and Support

New KPI

5

_

5

_

All wards

All wards

No. of projects facilitated to empower women and men

7

6

7

8

Gender forums were established as part of the reviewed Gender Strategy hence the increase in number of projects

_

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Social upliftment Project Name

Project Location (Ward)

Key Performance Indicator

Baseline

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

Explanation of Variance

Mitigation Measures

Disability Support

All wards

No. of projects for persons with disability implemented

5

4

5

4

_

_

Support of the elderly

All wards

No. of projects implemented to support the elderly

6

6

6

7

_

_

June being a youth month, organizations and business came forward to partner with the municipality to facilitate projects on youth empowerment.The involvement of social auxilliary work students also contributed to the increase in number of projects implemented.

Youth Development

All wards

No. of youth development projects implemented

8

4

8

14

Grant in Aid

All wards

No.of NGOs monitored and supported

60

60

60 NGOs monitored

60 NGO's monitored

_

_

Thusong Service Centres

All Wards

% applications/enquiries received vs. responded to in writing

New KPI

100%

_

100%

_

_

OPERATIONAL EXPENDITURE Department : Social Services

_

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Social upliftment Project Project Name Location (Ward)

Thusong Service Centres

Key Performance Indicator

All Wards

No. of Skills development projects implemented at Thusong Centres

All Wards

No. of community based awareness campaigns facilitated on issues of HIV/Aids

Baseline

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

4

3

4

3

_

_

11

The HIV/AIDS awareness talks were conducted as a response to a need identified by the elderly.

_

8

4

8

Management of HIV and Aids

All Wards

No. of capacity building projects initiated for HIV/Aids Volunteers

11

2

11

7

Explanation of Variance

The training was needs based and there were new volunteers that participated the programme.

Mitigation Measures

_

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Sport,Arts,Culture & Recreation Project Name

(Ward)

All wards

Key Performance Indicator Documented headcount benefiting from library services

No. of library resources circulated (Books, Tapes, and CDs, Manuals, periodicals and newspapers) Delivery of library and information services All wards

No. of Library Outreach Programmes implemented

All wards

% Provincial Budget allocated versus spent on library resources (Books, Tapes and CDs, Manuals, periodicals and newspapers)

Baseline

459,981

Annual Target

459,990

2012/13 Previous year performance

459,981

2013/14 Current year performance

Explanation of Variance

453,052

People did not use the libraries due to the community strikes and library computer system off was offline The availability of new books led to an increase in the circulation of library resources.

Mitigation Measures

The target will be adjusted accordingly in the next financial year

250,184

250,200

250,184

251,585

8

8

8

8

_

_

100%

100% R7000 000.00 was allocated for library resources and the total budget was spent.

100%

_

_

100%

OPERATIONAL EXPENDITURE Department : Social Services

_

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Sport,Arts,Culture & Recreation

Project Name

Sports and Recreation

Project Location (Ward)

Baseline

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

All wards

Headcount benefiting from sport facility usage

231,562

231,570

231,562

181,249

All wards

No. of sport and recreation programmes implemented

8

8

8

8

All wards

Heritage, Arts, and Culture Development Promotion and Management

Key Performance Indicator

No. of visits for sports fields maintenance

1,766

1,800

1,766

1,631

Explanation of Variance The construction work at sport facilities led to community members having little or no access to the facilities during the period thus the decrease in statistics.

_

The construction work at sport facilities led to the sports fields not being maintained

3,024

3,050

3,024

4,338

No. of heritage arts and culture programmes implemented

6

4

6

5

The International Museum Day Celebration programme received a large response from schools thus an increase in statistics A request was received to stage the competition for arts and culture groups

No. of exhibitions staged

2

2

2

2

_

All wards

No. of visitors and learners hosted at Mogale Museum

All wards

All wards

Mitigation Measures The targets will be adjusted in the next financial year as construction in various sport complexes continues based on the approved available budget.

_

The targets will be adjusted in the next financial year as construction in various sport complexes continues based on the approved available budget.

_

_

_

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Public Safety Project Name

Project Location (Ward)

Key Performance Indicator

Baseline

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

Explanation of Variance

New target

130

_

145

More requests received for safety training

_

_

_

All wards

No. of road safety campaigns conducted

All Wards

No. of roadblocks conducted for traffic law enforcement.

1589

1600

1589

1629

Additional officers were appointed and extended operations took place. Warrant roadblocks were included

All Wards

No. of inspections conducted on by-law enforcement

2057

1400

2057

1554

Complaints, special events and hawkers checked increased

Traffic Law Enforcement

OPERATIONAL EXPENDITURE Department : Social Services

Mitigation Measures

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Public Safety

Project Name

Project Location (Ward)

All Wards

Key Performance Indicator

No. of traffic citations captured

Baseline

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

Explanation of Variance

Mitigation Measures

288 457

300,000

288,457

478,379

Additional officers were appointed to conduct law enforcement

_

Traffic Law Enforcement All Wards

km of road painted

201.8

180

201.8

188

Opeartions Rehabilated

_

All wards

% Reaction to land invasions through use of guards

New KPI

100%

100%

100%

_

_

All Wards

No. of site inspections undertaken to monitor potential land invasion

1199

Deployment of additional security officers from the Service Provider as per request received to conduct more inspections

_

Security Management 39

240

39

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Motor Vehicle & Driver Licensing and Registration Project Key Performance Project Name Location Indicator (Ward)

Motor Vehicle & Driver Licensing and Registration

Baseline

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

All Wards

% of Roadworthy Certificate applications registered on enatis system

100%

100%

100%

100%

_

_

All Wards

% of learner's license applications registered on enatis system

100%

100%

100%

100%

_

_

All Wards

% of driving license applications registered on enatis system

100%

100%

100%

100%

_

_

All Wards

% of vehicle registration applications registered on enatis system

100%

100%

100%

100%

_

_

All Wards

% of renewal of motor vehicle licenses applications registered on enatis system

100%

100%

100%

100%

_

_

All Wards

% of motor vehicle penalties registered on enatis system

100%

100%

100%

100%

_

_

All Wards

% of permit applications registered on enatis system

100%

100%

100%

100%

_

_

OPERATIONAL EXPENDITURE Department : Social Services

Explanation of Variance

Mitigation Measures

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Sports and Recreation Project Name

Kagiso Sport Complex

Upgrade Azaadville Sport Complex

Kagiso Extension13 Sports Complex upgrade

Project Location (Ward)

3,4,5 and 11

3

4 and 5

Key Performance Indicator

Stages for the upgrade of Kagiso Sport Complex

Baseline

Construction of the wall commenced

Stages for the upgrade of New target Azaadville Sport Complex

Stages for the upgrade of Kagiso Ext 13 Sport Complex

New target

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

Explanation of Variance

Mitigation Measures

Final Stage: Upgrading of sport facilities Construction of the as per the wall commenced designs completed

Admininstration Block, Main entrance road, the grass on the two soccer fields has been laid and the mast lights have been installed. Construction of Clubhouse structure is complete and internal finishes in progress.

Perimeter wall at Azaadville Sport Complex completed

_

Construction of the perimeter wall is completed

_

_

Final Stage: Installation of mast light Completed

_

Installation of mast lights completed.

_

_

CAPITAL EXPENDITURE: Social Services

The project was delayed by tree obstacle on the construction site.

Project to be completed in 2014/15 financial year

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Sports and Recreation Project Key Project Name Location Performance (Ward) Indicator

Lusaka Sport Complex upgrade

Krugersdorp West Swimming pool upgrade

1 and 2

Stages for the upgrade Lusaka Sport Complex

19

Stages for the upgrading of Krugersdorp West Swimming pool

Baseline

Annual Target

New target

Final Stage: Upgrade of sport facility completed

New target

Stage 4: appointment of a contractor for the upgrading of Krugersdorp Swimming pool

2012/13 Previous year performance

_

_

2013/14 Current year performance

Explanation of Variance

Mitigation Measures

Construction of new guardhouse, new entrance gate and paving completed. Renovation of the existing buildings is complete. Trenching and installation of cables is complete.The delivery of mast poles is still awaited.

The steel and engineering industry strike has led to the delay in the delivery of the masts.

Project to be completed in 2014/15 financial year

Contractor not yet appointed

Tender re-advertised hence the contractor was not appointed

Contrator to be appointed in 2014/15 financial year

CAPITAL EXPENDITURE: Social Services

c

DEPARTMENT Infrastructure Services

2013/14 Annual Performance Report for Mogale City Local Municipality

Strategic goal/ objectives: to ensure sustainable service delivery to the community Department: Infrastructure Services

Project Name

Key Performance Indicator

No.of co-operatives contracted to execute work

Project Location

All wards

Baseline

Annual Target

New target

8

2012/13 Previous year 2013/14 Current year performance performance

_

Explanation of Variance

Mitigation Measures

10

_

_

507

The EPWP methodology (labour intensive) was also utilised for projects that were not funded by the EPWP incentive grant in order to report on job creation.

_

Job creation intitiatives No. of jobs created /sustained throught the EPWP Programme

All wards

New target

300

_

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Road and Surface Drainage Project Name

Key Performance Indicator

Stormwater maintenance (to minimise flooding)

km of roads cleaned, m 2 paved sidewalks cleaned and/or kerbs repaired

No. of intersections Road intersections and provided with street name signage signage boards

Gravel road maintenance

Project Location

All wards

All wards

km of gravel road gravelled 2, 28, 29, and km of gravel roads 30,31, 32,33, maintained 34

Baseline

Annual Target

263km of road, 53 789m2 sidewalk and 160m kerbing cleaned and repaired

400 km of roads cleaned, 60,000m2 paved sidewalks cleaned and 200m of kerbs repaired

216 Intersections provided with street name boards

13,2 km of gravel road gravelled and 296,8 km of gravel road maintained

200 Intersections provided with street name boards

2012/13 Previous year 2013/14 Current year performance performance

263km of road, 53 789m2 sidewalk and 160m kerbing cleaned and repaired

216 intersections provided with street name boards

9 km of gravel road 13,2 km of gravel road gravelled and 120 km gravelled and 296,8 km of gravel road of gravel road maintained maintained

Explanation of Variance

Mitigation Measures

443.6km of road, Additional requests 77512m²paved and recieved from 2010 m kerbing communities cleaned and repaired

_

284 intersections provided with street name boards

On the targeted suburbs all intersections were provided with street name boards to ensure completion.

_

11,449km 0f gravel road gravelled and 333.59km of gravel road maintained

Heavy rainfall experienced duirng the year which necessitate more maintenance work to gravel roads

_

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Electricity Maintenance Project Name

Key Performance Indicator

New indigent household electrical connections

No. of New indigent connections registered versus provided

Maintanance of traffic lights intersections

% of Traffic lights repairs versus complaints received

Project Location

All wards

All areas

Baseline

New target

New target

Annual Target

150

90%

2012/13 Previous year 2013/14 Current year performance performance

_

_

Explanation of Variance

Mitigation Measures

200

Indigents households on the approved register were accomodated on the available budget

_

100%

Own resources utilized and budget was available to cater for all complaints received

_

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Water and Sanitation Project Name

Key Performance Indicator

Potable water loss

%of Potable water loss (norm 15)

Water quality % compliance to SANS241 compliance monitoring

Potable water provision to informal settlement and rural communities

Project Location

Baseline

Annual Target

All wards

New target

30%

_

All wards

90%

90%

90%

No.of settlements provided Ward 32, 31, with potable water 23,28,30

On -Site Dry Sanitation No. of informal settlements provision to informal Ward 32, 31, provided with on site dry households and rural 23,28,31 sanitation services communities

Bulk wastewater quality management for treatment works

% compliance with permit and effluent discharge quality standards(Percy Steward, Flip human and Magaliesburg)

All wards

87

71

50%

Potable water delivered to 97 settlements

On -Site Dry Sanitation services provided to 97 households

40%

2012/13 Previous year 2013/14 Current year performance performance

87

71

50%

Explanation of Variance

Mitigation Measures

29%

_

_

100%

Rand Water ensured quality compliance during distribution

_

95

Less settlement supplied because the water pipelines with stand pipes were installed in other settlements

Target to be revised

87

Through the CRDP (Comprehensive Rural Development Programme) permanent solution for sanitation was provided for more other settlements

47%

Percy stewart upgrade was completed hence the increase

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Water and Sanitation Project Location Project Name (ward)

Lusaka Ext 2 & 3 renewals phase 4

Munsieville Ext 5 Bulk sewer

3

24

Key Performance indicator

No. of external toilets structures connected to sewer line

Stages for Upgrading of 1Ml pumpstation and construction of 1km bulksewer

Baseline

2000

Annual Target

2450

New target

Final Stage: Upgrading of 1Ml pumpstation and construction of 1km bulksewer completed

2012/13 Previous 2013/14 Current year performance year performance

2000

_

CAPITAL EXPENDITURE : Infrastructure Services

Explanation of Variance

2140

Project closed with 2140 structures due to the inaccessibility of other affected houses

Updraging of 1Ml pumpstation and construction of 1,850km bulksewer completed

The contractor demonstrated sufficient capacity to complete construction in advance and budget was made available accordingly

Mitigation Measures

The other affected houses toilet structures will be connected on a case by case basis

_

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Building Projects

Project Name

construction of Munsieville Aged Day Care Centre

Project Location (ward)

Key Performance indicator

ward 27

No. of stages for completion of the Munsieville aged day care centre

2012/13 Previous 2013/14 Current year performance year performance

Baseline

Annual Target

Building completed

Munsieville Aged Day Care Centre operational

Munsieville Aged Day Building completed Care Centre building operational

Baseline

Annual Target

2012/13 Previous 2013/14 Current year performance year performance

Explanation of Variance

_

Mitigation Measures

_

Section: Water and Sanitation Project Name

Kromdraai Pipeline

installation of prepaid water meters

Project Location (ward)

32

All Ward

Key Performance indicator

Km of bulk water pipeline installed

No. of new households installed with prepaid water meters

New target

New target

2.5 km of pipeline completed

13000

_

_

CAPITAL EXPENDITURE : Infrastructure Services

Explanation of Variance

Mitigation Measures

3km pipeline completed (installed and backfilled)

Due to continued interruptions on the projects based on the EIA and WRDM the additional area had to be accomodated

_

7000

Project delayed due to the budget been reduced and the other contractor pulled out of the project

The works order issued to the remaining contractor and the balance of the meters to be installed in 2014/15

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Building Projects Project Project Name Location (Ward)

Key Performance indicator

Green Hostel Reburbishment

Stages of the Electrical installation at the Green Hostel

10

Baseline

New tender was submitted. Project at tender stage

Annual Target

2012/13 Previous 2013/14 Current year performance year performance

Stage 2: Appointment of contractor and site handover

New tender was Contractor appointed submitted. Project and site handed over at tender stage

Annual Target

2012/13 Previous 2013/14 Current year performance year performance

Final Stage: 10 MVA transformer installed and energised

All foundations completed and casted. Busbar extensions on east and west side completed. Steelwork erected and Equipment installed. Bulk longlead equipement items delivered to site for installation

Explanation of Variance

_

Mitigation Measures

_

Department : Electricity Services Project Name

Condale substation upgrading

Project Location (ward)

20

Key Performance Indicator

Stages for the transformer energised

Baseline

All foundations completed and casted. Busbar extensions on east and west side completed. Steelwork erected and Equipment installed. Bulk longlead equipement items delivered to site for installation

CAPITAL EXPENDITURE : Infrastructure Services

10 MVA Transformer manufacturing completed. Unit delivered to site and installed. Final commissioning completed

Explanation of Variance

_

Mitigation Measures

_

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Roads and Surface Drainage Project Name

Project Location (ward)

Key Performance indicator

Roads resurfacing (Tertiary and Main Arterial Road upgraded)

All Wards

km of roads resurfaced and rehabilitated

Speed calming Measures

All Wards

No. of speed calming measures

Baseline

16.2 km of paved road rehabilited

35

Annual Target

16.5 km of paved road rehabilitated

45

2012/13 Previous 2013/14 Current year performance year performance

16.2 km of paved road rehabilited

Due to the increase 16.3km of paved road in the price of petrol rehabilited target could not be reached

35 speed calming 93 Speed calming measures installed Measures

CAPITAL EXPENDITURE : Infrastructure Services

Explanation of Variance

Additional funding was received during budget adjustment

Mitigation Measures

Target to be informed by the budget and fluctuations of petrolum prices

_

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Road and Surface Drainage Project Key Performance Location Project Name indicator (ward)

Baseline

Annual Target

2012/13 Previous 2013/14 Current year performance year performance

Explanation of Variance

Mitigation Measures

Construction of urban roads

1,2,3,4,10,14,

Km of urban roads constructed

_

5.2

3,148

5.721

Pr5 Project Scope Increased

_

Urban roads stormwater construction

2,14,30,31,32

km of storm water constructed

_

3.13km

1,884

3.18

Project Pr5 & Pr 16 Scope Increased

_

0.366

Pr 15 project behind Schedule as the project is labour intensive

Contractor put on terms to ensure achievement of the target.

177 jobs

More jobs created as a result of labour intensiveness of projects

_

Construction of rural roads

Jobs created through Roads and Stormwater projects

30,31,32

km of rural roads constructed

No. of job created through Roads and stormwater projects

_

0.6

142 jobs

133 jobs

2,674

142 jobs

CAPITAL EXPENDITURE : Infrastructure Services

2013/14 Annual Performance Report for Mogale City Local Municipality

Roads and Surface Drainage Project Name

Chief Mogale Bulk Roads Stage 1 Construction

Chief Mogale Bulk Stormwater Stage 1

Dr. Sefularo Housing Project Roads & Stormwater

Project Location (ward)

Key Performance indicator

6

Stages for the planning of the Bulk Roads, intersection construction

6

Stages for the procurement (Bulk Stormwater construction)

32

time taken to completed preliminary and scope design

Baseline

Annual Target

New target

Procurement completed and Site handover to the Constructor

New target

Procurement completed and Site handover to the Constructor

New target

Preliminary Project scoping & design report completed

2012/13 Previous 2013/14 Current year performance year performance

Explanation of Variance

Mitigation Measures

Budget Provision Delay caused by the for reallocation of funds implementation to implement the in the 2014/2015 project Financial Year.

_

Consultant Assignment, busy with tender process

_

Budget Provision Delay caused by the Consultant Assigned, for reallocation of funds busy with tender implementation to implement the process in the 2014/2015 project Financial Year.

_

Delay caused by the Project scoping report reallocation of funds submitted to implement the project

CAPITAL EXPENDITURE : Infrastructure Services

Planning studies to be conducted in 2014/2015 Financial Year.

DEPARTMENT Integrated Environmental Management

2013/14 Annual Performance Report for Mogale City Local Municipality

Strategic Goal and objective: to provide sound environmental management Department: Integrated Environmental Management Baseline Annual Target Project Key Performance Location Project Name Indicator (Ward)

All wards

No.of co-operatives contracted to execute work

New target

5

2012/13 Previous year performance

2013/14 Current year performance

Explanation of Variance

Mitigation Measures

_

5

_

_

209

More jobs created through waste management contracted services which was reported on EPWP for the financial year

_

Job creation intitiatives

All wards

No. of jobs created /sustained through the EPWP Programme

New target

190

_

OPERATION EXPENDITURE: Integrated Environmental Management

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Municipal Health Project Name

Waste management: (refuse collection, litter picking, street cleansing and landfill) jobs created

Baseline

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

Explanation of Variance

Mitigation Measures

All wards

No. of co-operatives appointed through waste management projects

New target

2

_

2

_

_

All wards

No. of jobs created through waste management projects

New target

70 jobs

_

77

_

_

Project Location (Ward)

Key Performance Indicator

OPERATION EXPENDITURE: Integrated Environmental Management

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Integrated Environmental Management

Project Name

Climate Change Framework

Project Location (Ward)

All wards

Baseline Key Performance Indicator

Stages for the development of climate change Framework

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

Climate Change Stage 4: 1st draft framework TOR Stage 4: 1st draft of the Climate item was of the Climate TOR to Exco Change presented at Change framework EXCO in March framework 2013

OPERATION EXPENDITURE: Integrated Environmental Management

Explanation of Variance

Mitigation Measures

_

_

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Park and Cemeteries

Project Name

Jobs created through Parks Services

Food gardens

Baseline

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

Explanation of Variance

Mitigation Measures

All wards

no. of jobs( FTE equivalent) created through Parks Services

196

120 FTE jobs

196

132

_

_

All wards

No. of food gardens supported in terms of the food garden policy

17

5 food gardens supported

17 Food gardens supported

6 Food gardens supported

_

_

Project Location (Ward)

Key Performance Indicator

OPERATION EXPENDITURE: Integrated Environmental Management

2013/14 Annual Performance Report for Mogale City Local Municipality

Department: Integrated Environmental Management Baseline

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

Explanation of Variance

Mitigation Measures

Stages for Kagiso Cemetery Upgrading

New Target

Stage 2: Appointment of the service provider:

_

Service provider appointed and site established

_

_

Stages for the construction of Coronation Park

New Target

Final Stages: Construction commenced

_

Service provider appointed, site established, construction commenced

_

_

Project Location (Ward)

Key Performance Indicator

Kagiso Cemetery

4,5,6, 7,8 , 9,

Coronation Park Development

20

Project Name

CAPITAL EXPENDITURE : Integrated Environmental Management

2013/14 Annual Performance Report for Mogale City Local Municipality

Section: Municipal Health

Project Name

Landfill cell development

Project Location (Ward)

All wards

Key Performance Indicator

Baseline

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

Explanation of Variance

Mitigation Measures

Stages for the development of the landfill

New Target

Final Stage : Construction of the new landfill cell

_

Construction of the new landfill cell Completed

_

_

Key Performance Indicator

Baseline

Annual Target

2012/13 Previous year performance

2013/14 Current year performance

Explanation of Variance

Mitigation Measures

Department: Parks and Cemeteries

Project Name

Project Location (Ward)

Muldersdrift Park Development

28

Stages for the development of the Park

New Target

Stage4 : Site cleareance

_

Site cleared and construction commenced by April 2014.

_

_

Munsieville Park Development

26

Stages for the development of the Park

New Target

Stage4 : Site cleareance

_

Site cleared and construction commenced by April 2014.

_

_

30

Stages for the development of the Park

New Target

Stage4 : Site cleareance

_

Site cleared and construction commenced by April 2014.

_

_

Magaliesburg Park Development

CAPITAL EXPENDITURE : Integrated Environmental Management