Chatham Borough Tree Planting Program 2012 Shade Tree Commission
Every year, Shade Tree Commission plants trees in the Borough. In 2012 Chatham Borough planted 32 trees in total. The tree species that were planted are: Linden, Red Maple, Zelkova, Elm, Yoshino Cherry, Cherokee Princess Dogwood, Pin Oak, and Ivory Silk Tree Lilac. Enclosed is a list of the tree planting information, a map of the locations where trees were planted, a short term maintenance plan for the newly planted trees, the budget for this program, and after pictures organized by location.
2012 Tree Plantings Number
Street
28 121 50 80 10
Burgess St Center Ave Center Street Chandler Rd
Number of Trees Planted 2 1 1 2
Coleman Ave Dunbar St
2 2
East Coleman Ave Elm Place Elmwood Ave
1 1 1
Fuller Ave Hillside Ave Hillside Ave Hillside Ave Hillside Ave Hillside Ave Lafayette Place Main St Garden Terrace NH North Hillside North Summit Ave Overlook Road Overlook Road Red Road (adjacent to 78 Hillside Ave) Summit Ave Summit Ave Washington Ave TOTAL
1 1 1 1 1 2 2
60 40 7 37 71 71 155 157 159 184 361 24 53 10 12 31 64 66 264
1 1 1 1 1 1 1 1 1
Species
Caliber (inches)
Red Maple (2) Yoshino Cherry Red maple Zelkova (2) Yoshino Cherry (2) Linden (2) Cherokee Princess Dogwood Red Maple Elm Ivory Silk Tree Lilac Red Maple Elm Elm Elm Pin Oak (2) Pin Oak (2) Red Maple
2-3” 2-3” 2-3” 2-3” 2-3”
Pin Oak Red Maple Red Maple Yoshino Cherry Red Maple
2-3” 2-3” 2-3” 2-3” 2-3”
Red Maple Elm Red Maple
2-3” 2-3” 2-3”
2-3” 2-3” 2-3” 2-3” 2-3” 2-3” 2-3” 2-3” 2-3” 2-3” 2-3” 2-3”
31
2
Linden (Tilia)
Zelkova (Zelkova)
Red Maple (Acer rubrum)
Elm (Ulmus)
3
Yoshino Cherry (Prunus x yedoensis)
Pin Oak (Quercus palustris)
Cherokee Princess Dogwood (Cornus florida)
Ivory Silk Tree Lilac (Syringa reticulate)
4
2012 Tree Planting Locations Map
5
Maintenance Plan The contractor, Coviello Brothers, planted the 31 trees. Each newly planted tree comes with a one-year guarantee and automatic replacement. The contractor will provide mulch bases for the newly planted trees in the first year, when the trees are planted. Maintenance will be performed by the Chatham Borough Department of Public Works and will include – watering, removal of tree stakes and guy wires, and pruning as needed. Each year, for the first three years, new trees are inspected for damage and disease. Pruning will be implemented as need and trees will be trimmed/pruned in the third year to ensure that they are growing properly. Newly planted tree watering is based on several factors. The Borough encourages the adjacent property owner to the newly planted Borough Right-of-Way tree to adopt the tree and shepherd the tree’s watering program. The DPW will assist in watering when the homeowners are unable. Additionally, the DPW monitors the local weather circumstances; during drought frequent watering is implemented. 2012 Budget Item Trees
Planting of Trees Labor
Description
Quantity
Cost
Total
Linden 2-2.5” Red Maple 2-2.5” Zelkova 2-2.5” Elm 2-3” Yoshino Cherry 2” Cherokee Princess Dogwood 8’ height Pin Oak 2-2.5” Ivory Silk Tree Lilac
2 11 2 5 5
$138.00 $118.00 $135.00 $135.00 $112.00
$276.00 $1,298.00 $270.00 $675.00 $560.00
1
$147.00
$147.00
4 1
$133.00 $173.00 Total for trees:
$532.00 $173.00
Outsourced Work - Coviello Brothers Shade Tree Commission Volunteers: Site new locations in town, identify species, visit nurseries and tag exact trees, visit the contractor – Coviello Brothers, and visit the sites once planting begins and ends College Intern: Writing of report, photography of new trees in their locations
$3,931.00
Total for Planting:
$741.50
20 hours at $15/hour
$300.00
12 hours at $15/hour
$180.00
Total for Labor:
$480.00
Total: $5,152.50 See project invoices and processed purchase orders on the next page.
6
7
8
2012 Tree Planting After Pictures by Location #
Street
# Trees Planted
28
Burgess St
2
121
Center Ave
1
50
Center Street
1
Picture(s)
9
#
Street
# Trees Planted
80
Chandler Rd
2
10
Coleman Ave
2
Picture(s)
10
#
Street
# Trees Planted
60
Dunbar St
2
40
East Coleman Ave
1
Picture(s)
11
#
Street
# Trees Planted
7
Elm Place
1
37
Elmwood Ave
1
71
Fuller Ave
1
Picture(s)
12
#
Street
# Trees Planted
71
Hillside Ave
1
155
Hillside Ave
1
157
Hillside Ave
1
Picture(s)
13
#
Street
# Trees Planted
159
Hillside Ave
1
184
Hillside Ave
2
Picture(s)
14
#
Street
# Trees Planted
-
Lafayette Place
2
361
Main St Garden
1
Picture(s)
Terrace NH
15
#
Street
# Trees Planted
24
North Hillside
1
53
North Summit Ave
1
Picture(s)
16
10
Overlook Road
1
#
Street
# Trees Planted
12
Overlook Road
1
Picture(s)
17
31
Red Road (adjacent
1
to 78 Hillside Ave)
64
Summit Ave
1
#
Street
# Trees Planted
Picture(s)
18
66
Summit Ave
1
264
Washington Ave
1
19