4 1 2g 3f EFGH

Report 0 Downloads 97 Views
DO NOT SCALE THIS DRAWING

1

2g

4

3f

7803

05 SERIES - DEMOLITION / ENABLING WORKS 10 SERIES - SITE PLAN 15 SERIES - ENGINEERING WORKS 30 SERIES - ELEVATIONS 35 SERIES - SECTIONS 40 SERIES - ROOF LAYOUT & STRUCTURE 45 SERIES - INTERMEDIATE FLOOR JOIST LAYOUT 55 SERIES - FLAT LAYOUTS 60 SERIES - KITCHENS 65 SERIES - BATHROOM, EN-SUITE & WC 70 SERIES - SERVICES 75 SERIES - DETAILS 80 SERIES - WINDOWS 85 SERIES - SALES & LEGAL PLANS PEGRAM 1008 DRAWINGS - STRUCTURAL ENGINEER'S

6311

DASHED LINES DENOTE DOOR OPENING TO BE FORMED WHEN SITE WELFARE HAVE VACATED. REFER TO WH124/10/05.01 FOR SETTING OUT.

EXISTING DOUBLE DOORS DOOR TO BE USED UNTIL SITE WELFARE HAVE VACATED & TO BE REPLACED WITH NEW ALUMINIUM DOUBLE DOORS AS SHOWN ON WH124/10/80.01.

EXISTING SVP REPLACED WITH 150mm DIA SVP CW17

CW19

THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT DRAWINGS:-

KEY PLAN (NTS)

RWP

NEW 300mm O/A CAVITY WALL CONSTRUCTION, 2 LEAFS 100mm 3.5N/mm² BLOCK (1950kg/m3 DENSITY) WITH 100mm CAVITY AND BLOWN INSULATION WITH 20mm ACRYLIC RENDER FINISH - COLOUR: WHITE

4146

*

NEW CAVITY WALL CONSTRUCTION TO MATCH AND LINE THROUGH WITH EXISTING

SERVICE RISER

EXISTING EXTERNAL WALL TO BE RETAINED

215

NEW R.C. COLUMN / WALLS- REFER TO PEGRAM 1008/A1 FOR DETAILS - COLUMNS TO SHOP FRONTAGE TO BE FINISHED EXTERNALLY WITH 20mm ACRYLIC RENDER - COLOUR: WHITE

215

M6

REFER TO 80.01 FOR NEW GLAZING DETAILS

W3

DASHED LINES DENOTE 215mm BLOCK WALL TO BE CONSTRUCTED WHEN SITE WELFARE HAVE VACATED. REFER TO PHASE 2 CONDOC FOR DETAILS.

RWP 60

60

W2

* *

REFER TO 80.01 FOR NEW GLAZING DETAILS

5110

SAP

W1

CW2

W1

RESIDENTIAL BIN STORE

CEILING 3115mm A.F.F.L

52.360 F.F.L.

M3 SAP

890

SAP

60

W2

M3

ALL DASHED PIPEWORK TO BE RUN UNDER 1ST FLOOR SLAB AND ABOVE PROPOSED CEILING LINE IN KITCHEN .

1398

60

REFER TO 80.01 FOR NEW GLAZING DETAILS

LEVEL DOOR THRESHOLD

M3

SVP/SAP RWP

RWP LOCATION CORE DRILL REQUIRED THROUGH EXISTING CONCRETE SLAB. NOTE: FLOOR THICKNESS VARIES. DRAINAGE OFFSET FROM ABOVE SVP TERMINATING WITH AIR ADMITTANCE VALVE ABOVE CEILING LEVEL

AAV

*

ANCON SPB FRAME CRAMPS (OR SIMILAR)

M1

303mm TOTAL CAVITY WALL THICKNESS 102.5 / 100 / 100 ( BRICK / CAVITY / BLOCK ) FACING BRICK FINISH

M2

300mm TOTAL CAVITY WALL THICKNESS 100 / 100 / 100 ( BLOCK / CAVITY / BLOCK ) RENDERED FINISH WITH 'M1' BELOW GLAZING LINE.

M3

328mm TOTAL CAVITY WALL THICKNESS 102.5 / 75 / 150 ( BRICK / CAVITY / BLOCK ) TO MATCH EXISTING FACING BRICK FINISH

M4

250mm TOTAL CAVITY WALL THICKNESS 102.5 / 47.5 / 100 ( BRICK / CAVITY / BLOCK ) FACING BRICK FINISH

M5

102.5 FACING BRICK PLINTH AROUND COLUMNS UPTO GLAZING LINE. REFER TO 35.02 DETAIL A FOR DETAILS. ACRYLIC RENDER APPLIED TO EXTERNAL FACE OF R.C. COLUMN ABOVE GLAZING LINE.

30 MIN. FIRE RATED PARTITION SEE 75-17 FOR DETAILS. 50mm GYPROC THERMALINE SUPER ON 10mm DABS - 60mm O/A DOT & DAB 'DRY-LINER BASIC' SYSTEM - GENERALLY TO ALL EXTERNAL MASONRY WALLS AND CONC. COLUMNS UNLESS NOTED OTHERWISE ON DRAWING

MJ

MOVEMENT JOINT

NEW RWP

G

NEW 65mm SQUARE PVCu RAIN WATER DOWN PIPE

M6

PARTY WALL - 215mm THICK BLOCK WALL ( BLOCKS LAID FLAT)

M7

AS M2 BUT NOT RENDERED AS INTERNAL WALL.

D

DRAINAGE AMENDED AS ADDENDUM No. 14384

C

SHOP FRONT & RESIDENTIAL DOOR OPENINGS AMENDED AS ADDENDUM No. 14381

B

CONTRACT DOCUMENT ISSUE

A

PRELIMINARY DOCUMENT ISSUE

GULLY LOCATION WINDOW / DOOR REFERENCES. REFER TO 80 SERIES FOR DETAILS.

Checked Prelim Issue

W1 60

SAP

Checked Condoc Issue

Author

Manager

Author

Manager

BS

JTG

MN

JTG

Date

Date

Date

Date

15/05/10

15/05/10

15/06/10

15/06/10

328

SAP

CW3

2314

DRAINAGE LOCATION 200mm Ø CORE DRILL REQUIRED THROUGH EXISTING CONCRETE SLAB - SVP = SOIL VENT PIPE, SAP = STUB STACK AT HIGHEST LEVEL. NOTE:- FLOOR THICKNESS VARIES SETTING OUT TAKEN FROM STRUCTURE.

*

W1 328

LINTEL ON PADSTONE OVER (REFER TO 05 SERIES DRG' s FOR SIZE AND SPECIFICATION.)

1) REFER TO 05 SERIES AND M. PEGRAM DRAWINGS FOR FOUNDATION DETAILS. 2) ALL WALLS BELOW GLAZING TO BE EXPOSED BRICK U.N.O. WITH PLINTHS WHERE SHOWN. 3) ALL NEW CAVITY WALLS TO RECEIVE FULL BLOWN GLASS FIBRE INSULATION.

* 60

*

15mm GYPROC WALLBOARD TEN DOT & DAB 'DRY-LINER BASIC' SYSTEM (OVERALL 25mm)

NOTE:SINGLE/ DOUBLE BLOCK LEAF WINDOW/ DOOR OPENING INFILL

DOOR LOCATIONS. REFER TO 55 SERIES FOR DOOR REFERENCES & 75.19 FOR DOOR JAMB DETAILS & 80 SERIES FOR DOOR DETAILS.

890

*

GYPROC THERMALINE SUPER 50 on 70 'C' STUDS AT 300 CENTRES. (OVERALL 120mm THICK)

MASONRY WALL CONSTRUCTION

CW1

60

W6

6mm PARGE COAT, 15mm GYPROC WALL BOARD TEN APPLIED VIA GYPLINER SYSTEM (OVERALL 30mm)

MN

328

(NOTE:- TO BE CONSTRUCTED IN PHASE 2)

W5

GYPROC HARDWALL PLASTER (13mm)

BS

5110

COMMERCIAL UNIT 1 (SITE WELFARE DURING CONSTRUCTION)

328

W4

GYPROC THERMALINE SUPER 50 APPLIED VIA GYPLINER SYSTEM TO ENCASE COLUMNS AND MASONRY REVEALS (OVERALL 60mm)

Checked By

890

890

W1

SAP

HATCH DENOTES PHASE 2 WORKS

2230

2230

CW1

*

NEW WINDOW / DOOR OPENING IN EXISTING STRUCTURE FOR DIMENSION REFER TO 05, 30 & 80 SERIES DRAWINGS.

REFER TO WH124/10/55.02 FOR FIT OUT OF SITE WELFARE OFFICES

5110

328

M3

60

6000

NEW 215mm WIDE 7N/mm² (1950kg/m3 DENSITY) BLOCK WALL WITH HEAD RESTRAINT BY ANCON (OR SIMILAR)

(NOTE:- TO BE CONSTRUCTED IN PHASE 2)

EXISTING STRUCTURE TO REMAIN - THICKNESS VARIES

60

NEW RWP

6000

W3

W1

*

F

3.5N/mm² BLOCKWORK (1950kg/m3 DENSITY)

COMMERCIAL BIN STORE

60

327

M3

W2

3316

M3

G

FACING BRICKS MATCHING EXISTING.

*

14.07.10

2939

*

14.07.10

163

*

15.06.10

60

SVP

GYPROC THERMALINE SUPER 50 APPLIED VIA GYPLINER SYSTEM TO MASONRY WALLS (OVERALL 60mm THICK)

15.05.10

S/S

THIS WALL THICKNESS TO MATCH EXISTING.

13

6000

60

SVP

W1

Date

13

MN

1148

60

NOTE:1) FIREFIGHTING STAIRCASES AND OUTSIDE OF LIFT SHAFTS TO BE FINISHED WITH 13mm HARDWALL PLASTER UNLESS SHOWN OTHERWISE. 2) ALL LINING THICKNESS ARE APPROXIMATE. DRY LINER TO ASSESS ON SITE TO ACHIEVE FLUSH FINISH WITH ADJOINING LININGS WHERE POSSIBLE. 4) DIMENSIONS TO BE READ IN CONJUNCTION WITH 55 SERIES DRAWINGS AND M.PEGRAM 1008 DRAWINGS, REFER TO 55 SERIES FOR PLOT AREAS. 5) ALL SERVICE PENETRATIONS THROUGH PARTY WALLS / FLOORS TO BE FIRE STOPPED PROVIDING MINIMUM 90 MINUTES FIRE PROTECTION WITH ROCKWOOL FIREPRO (OR SIMILAR)

MN

215

Description

1078

75

W3

1810

INTERNAL WALL LININGS

Revision

52

W1

3770

3770

NEW 300MM O/A CAVITY WALL CONSTRUCTION WITH FULL BLOWN INSULATION AND BRICK TO MATCH EXISTING

1252

DASHED LINES DENOTE 215mm BLOCK WALL TO BE CONSTRUCTED WHEN SITE WELFARE HAVE VACATED. REFER TO PHASE 2 CONDOC FOR DETAILS.

W2

*

SVP

100

60

H

60

LEGEND

SVP

W1

W4

Title

FORM DOOR OPENING 2100mm HIGH x 1033mm WIDE.

NOTE:- TEMPORARY

M1

*

Site

*

GROUND FLOOR PHASE 1 GENERAL ARRANGEMENT SHEET 1 of 3 Canon House, Wallington

Drg.

CW17

303

350

WH124/10/25-00 1033

W4

30

30 204 215

M6

1007

215 30

890

W4

60

215mm WIDE PARTY WALL LINED FLUSH WITH COLUMN

60

S/K-90 (1350)

W2

S/S

30

SVP

60

W1 M3

W2 RWP

M6 1398

W4

60

* 327

W4 30

327

* 890

E

NEW RWP

RODING EYE REFER TO DRAWING 15.01

30 215 30

1398

M3

CONTRACT DOCUMENT ISSUE

FORM DOUBLE DOOR OPENING 2100mm HIGH x 1810mm WIDE. 1810

Date

Drawn 150

Rev

May2010 BS

Scale

D

1:50@A1

FOR CONTINUATION REFER TO 25.01 The Weston Group Business Centre, Parsonage Road, Takeley, Essex. CM22 6PU. Tel: 01279 873333 Fax: 01279 873378 [email protected]