527 MAdisoN AveNue | Agorafy

Report 0 Downloads 223 Views
MIDTOWN office space available FOR SUBlease

527 Madison Avenue BETWEEN 53RD & 54TH StreetS

availabILITIES

Partial 12th Floor: 3,601 RSF Entire 21st Floor: 7,200 RSF

Available Immediately

RENT Negotiable

TERM Through December 2017

CommentS 12th floor: brand new glass fronted prebuilt units 21st floor: Classic executive layout with perimeter offices, high end finishes “Plug & play” space Excellent light & views Furniture available on 21st floor Floor-to-ceiling windows CAT 5 wiring Supplemental AC unit in IT closets on 21st floor Institutional quality sublandlord

Leasing Information Lauren Davidson

Lindsay Ornstein

212.537.7685

212.537.0351

[email protected]

[email protected]

The information provided herein was obtained from sources believed reliable; however, Transwestern makes no guarantees, warranties or representations as to the completeness or accuracy thereof. The presentation of this property is submitted subject to errors, omissions, change of price or conditions, prior sale or lease, or withdrawal without notice. Copyright © 2014 Transwestern.

400 Park Ave, 16th Floor | New York, NY 10022 T 212.537.0370 F 212.537.0380 www.transwestern.com

MIDTOWN office space available FOR SUBlease

527 Madison Avenue BETWEEN 53RD Street & 54TH Street 12th Floor Renovations SK-016A 1/8" = 1'-0" 02/28/2014

12TH FLOOR

| 13008.00

Plan - 12th Proposed Layout

I.T.

SUITE A 4,399 RSF

LEASED

SUITE B 3,601 RSF

COPY

PANTRY

PANTRY RECEPTION

I.T. CONF. RM.

CLOS.

CLOS.

STORAGE

RECEPTION

ELEVATOR LOBBY

Leasing Information Lauren Davidson

Lindsay Ornstein

212.537.7685

212.537.0351

[email protected]

[email protected]

The information provided herein was obtained from sources believed reliable; however, Transwestern makes no guarantees, warranties or representations as to the completeness or accuracy thereof. The presentation of this property is submitted subject to errors, omissions, change of price or conditions, prior sale or lease, or withdrawal without notice. Copyright © 2014 Transwestern.

400 Park Ave, 16th Floor | New York, NY 10022 T 212.537.0370 F 212.537.0380 www.transwestern.com

MIDTOWN office space available FOR SUBlease

527 Madison Avenue

8. EN

FINISH NOTES: 1. ALL WOOD TO BE FIRE RETARDANT, AS PER C27-328. 2. ALL FLOOR AND WALL FINISHES TO COMPLY WITH THE MIN. REQUIREMENTS FOR INTERIOR FINISH CLASS, FLAMESPREAD RATINGS AND SMOKE DENSITY, AS PER SEC. C27-348 THROUGH C27-351. & TABLE 5-4. 3. ATTACHMENTS OF FINISHES TO BE AS PER SEC. C27-348(F). 4. ALL ACOUSTICAL & THERMAL INSULATION TO COMPLY WITH C27-335.1. MAXIMUM UNDERCUT OF F.P.S.C. DOORS TO BE AS PER NFPA 80 STANDARDS (3/8" WITH SADDLE/ 3/4" WITHOUT SADDLE)

7. AC

6. N.

BETWEEN 53RD Street & 54TH Street

60.4

52

140 .42

68

E5 3RD

E4

25 2

2.

0.4 2

40

80

1.

T

10

MA DIS ON

AV EN UE

2

E5 4 14 TH ST 8 REE

STR EET

BIN

1035734

BLOCK

1289

LOT

52

ZONING MAP

80

ZONE

C5.3

DUST CONTROL: A. DEBRIS, DIRT, AND DUST TO BE KEPT TO A MINIMUM AND CONFINED TO THE IMMEDIATE CONSTRUCTION AREA. B. CONTRACTOR TO ISOLATE CONSTRUCTION AREA BY MEANS OF TEMPORARY PARTITIONS OR HEAVY WEIGHT DROP CLOTHS. C. DEBRIS, DIRT AND DUST TO BE CLEANED UP AND CLEARED FROM THE BUILDING SITE PERIODICALLY TO AVOID EXCESS ACCUMULATION.

4.

NOISE AFTER HOURS: A. CONSTRUCTION OPERATIONS WILL BE CONFINED TO NORMAL WORKING HOURS: 8:00 AM TO 6:00 PM EXCEPT LEGAL HOLIDAYS B. CONTRACTOR MUST OBTAIN WRITTEN PERMISSION FROM ALL AFFECTED PARTIES TO WORK OTHER THAN REGULAR HOURS

D4

C5

212.537.7685 [email protected] ON HALF-SIZED (11" x 17") SETS, SCALE NOTED ON DRAWINGS IS DOUBLED

APPLIC

FIRE SUPPR

GROSS FLO

AREA OF R

B4

SPECIAL INSPECTIONS

TABLE

PAA# DWG. ARCHITECTURAL T-000 00 A-012 00 A-013 00 A-112 00 A-212 00 A-312 00 A-412 00 A-600 00 A-601 00 A-605 00 A-620 00 A-621 00 A-740 00 A-760 00 A-820 00 A-821 00 A-840 00 A-901 00 A-902 00 A-903 00 MECHANICAL M-001 00 M-100 00 M-101 00 M-200 00 M-201 00 M-300 00 M-301 00 ELECTRICAL E-001 00 E-100 00 E-101 00 E-200 00 E-300 00 E-301 00 FIRE ALARM FA-001 00 FA-100 00 PLUMBING P-001 00 P-100 00 P-200 00 SPRINKLER SP-001 00 SP-100 00 SP-200 00

LEASED

Lindsay Ornstein

1. N.

MECHANICAL SYSTEMS SPRINKLER SYSTEM FIRE RESISTANCE RATED CONSTRUCTION FIRESTOP, DRAFTSTOP, FIREBLOCK SYSTEMS ENERGY CODE COMPLIANCE INSPECTIONS FINAL

3,601 RSF

Lauren Davidson

2. N.

B5

CODE COMPLIANCE NOTES

1. 2. 3. 4. 5. 6.

C4

Leasing Information

3. N.

SPECIAL INSPECTIONS:

CONSTRUCTION OPERATIONS WILL NOT INVOLVE INTERRUPTION OF HEATING, WATER, OR ELECTRICAL SERVICES TO OTHER TENANTS.

GENERAL NOTES - TENANT SAFETY

4. N.

LOCAL LAW 58/87 NOTES: 1. ALL NEW AND RELOCATED DOORS TO BE MIN. 2'-10" WIDE WITH PROPER CLEARANCES AND HANDICAPPED USABLE HARDWARE. 2. AUTOMATIC DOOR CLOSING DEVICES MUST BE HANDICAP APPROVED TYPE AS MFG. BY LCN OR EQUIVALENT. 3. ALL NEW TRIMMED OPENINGS TO BE 2'-8" MINIMUM WIDE. 4. 5% OF NEW CUBICLES WILL BE HANDICAP USABLE WITH 2'-8" MINIMUM PASSAGE POINT.

12TH FLOOR RENDERINGS

FIRE SAFETY: A. ALL BUILDING MATERIALS WHICH ARE STORED AT THE SITE OR ANY AREA OF THE BUILDING ARE TO BE STORED IN A LOCKED AREA. ACCESS TO THE AREA TO BE CONTROLLED BY THE OWNER, OR THE GENERAL CONTRACTOR. B. ALL MATERIALS TO BE STORED IN AN ORDERLY FASHION C. ALL FLAMMABLE MATERIALS TO BE KEPT TIGHTLY SEALED IN THEIR RESPECTIVE MANUFACTURERS' CONTAINERS. SUCH MATERIALS TO BE KEPT AWAY FROM HEAT. D. ALL FLAMMABLE MATERIALS TO BE USED AND STORED IN AN ADEQUATELY VENTED SPACE. E. ALL ELECTRICAL POWER TO BE SHUT OFF WHERE THERE ARE EXPOSED CONDUITS. F. ALL ELECTRICAL POWER IN THE CONSTRUCTION AREA TO BE SHUT OFF AFTER WORKING HOURS. G. CONTRACTOR, AT ALL TIMES, TO ENSURE THERE IS NO NATURAL GAS LEAKAGE IN THE BUILDINGS OR ANY FLAMMABLE GAS TO BE USED DURING CONSTRUCTION.

3.

5.

TABLE - PLOT PLAN-MAP

GENERAL: ALL WORK TO BE COMPLETED IN ACCORDANCE WITH THE NEW YORK CITY BUILDING CODE, ARTICLE 33, AND REGULATION OF ALL OTHER AGENCIES HAVING JURISDICTION. MEANS OF EGRESS: ALL EXISTING MEANS OF EGRESS FOR TENANTS OF THE BUILDING TO BE MAINTAINED CLEAR AND FREE OF ALL OBSTRUCTIONS, SUCH AS BUILDING MATERIALS, TOOLS, ETC.

5. N.

Co Pla Pla Pla Pla Pla Pla Ge Ge AD Sch Sch Inte Enl De De De Arc Arc Arc

12 12 12 HV HV HV HV

12 12 12 12 12 12

12 12

PLU 12 PLU

SPR 12 SPR

12th Floor Renovations

212.537.0351 527 Madison Avenue #12, New York, NY 10022 [email protected]

The information provided herein was obtained from sources believed reliable; however, Transwestern makes no guarantees, warranties or representations as to the completeness or accuracy thereof. The presentation of this property is submitted subject to errors, omissions, change of price or conditions, prior sale or lease, or withdrawal without notice. Copyright © 2014 Transwestern.

THIS PLAN IS APPROVED ONLY FOR WORK INDICATED

400 Park Ave, 16th Floor | New York, NY 10022 T 212.537.0370 F 212.537.0380 www.transwestern.com

MIDTOWN office space available FOR SUBlease

527 Madison Avenue BETWEEN 53RD Street & 54TH Street WP Stewart 12th Floor Reno. | 13008.00 SK-012 1/8" = 1'-0" 12/16/2013

21ST FLOOR

Plan - 21st Floor Revised

7,200 RSF

Leasing Information Lauren Davidson

Lindsay Ornstein

212.537.7685

212.537.0351

[email protected]

[email protected]

The information provided herein was obtained from sources believed reliable; however, Transwestern makes no guarantees, warranties or representations as to the completeness or accuracy thereof. The presentation of this property is submitted subject to errors, omissions, change of price or conditions, prior sale or lease, or withdrawal without notice. Copyright © 2014 Transwestern.

400 Park Ave, 16th Floor | New York, NY 10022 T 212.537.0370 F 212.537.0380 www.transwestern.com