AC Module

Report 5 Downloads 394 Views
AC Module Installation Guide Content for SLP250-240AC Solarland AC Modules

January 15, 2013 © 2011- 2013 SolarBridge Technologies, Inc. All Rights Reserved. No part of this publication may be reused in any manner nor in any form or format without prior written permission from SolarBridge Technologies, Inc. SolarBridge Technologies, Inc. 9229 Waterford Centre Blvd. Bldg C, Suite 110 Austin, TX 78758 Phone: 877-848-0708 • Fax: 512-637-6878

Trademarks SolarBridge Technologies, SolarBridge Pantheon, Roof-Ready, and SolarBridge PV-Dock are all trademarks of SolarBridge Technologies, Inc. All other products and services mentioned herein are trademarks or registered trademarks of their respective companies.

Disclaimer The information contained in this manual is based on SolarBridge Technologies, Inc. knowledge and experience, but such information and suggestions do not constitute a warranty expressed or implied. The methods of installation, use and maintenance of Power ManagerSolarBridge Pantheon Inverter are beyond the control of SolarBridge Technologies. SolarBridge Technologies assumes no responsibility and expressly disclaims liability for any loss, damage or expense associated with the use, installation or operation of the Power ManagerSolarBridge Pantheon Inverter. Any liability of SolarBridge Technologies is strictly limited to the Limited Warranty. SolarBridge Technologies reserves the right to make changes to product specifications or to this manual without notice. PN: SBT-00092 Rev. 00

Contents Read this First! ........................................................................................................ 5 IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS ............................. 5 Australian Certification ................................................................................................. 7 Chapter 1:

Introduction ..................................................................................... 2

Components of an AC Module ...................................................................................... 2 Earthing in the AC Cables ......................................................................................... 3 Module Layout Diagram ............................................................................................... 4 Connecting Latching Cables ......................................................................................... 6 Disconnecting Latching Cables ..................................................................................... 8 Chapter 2:

Module Preparation ........................................................................ 10

Preparing the Modules ............................................................................................... 11 Preparing the Last Module in the String ...................................................................... 11 Chapter 3:

Module Installation ........................................................................ 13

Installing the Modules ................................................................................................ 13 Appendix A:

Examples ..................................................................................... 17

Junction Box - Top Right ............................................................................................ 17 Junction Box - Top Left .............................................................................................. 18 Two Strings – Two rows each .................................................................................... 19 Two Strings – Single Rows ......................................................................................... 20 Landscape – Two Strings ........................................................................................... 22 Appendix B:

Three-line Diagram ..................................................................... 23

Appendix C:

AC Wiring Accessories ................................................................. 26

Appendix D:

Technical Specifications .............................................................. 29

Output Ratings .......................................................................................................... 29 Utility Interaction....................................................................................................... 30 Grid Connection Limits............................................................................................ 30 Grid Connection Time Limits ................................................................................... 30

i v

ACPV Module Installation Guide

Read this First! This document contains important information and instructions to safely install an array of alternating current photo-voltaic (ACPV) solar modules that have been pre-configured with SolarBridge P250LV-230-AU microinverters from the factory (referred to in this manual as "AC Modules"). Failure to follow these instructions can result in equipment damage or failure, or personal injury, and might void the system warranty. The following symbols are used throughout this document to alert you to important safety information that you will need during the installation: This symbol indicates that failure to follow instructions may result in serious hardware failure. Use caution when completing this task.

This symbol indicates that failure to follow instructions may result in serious personal injury. Use extreme caution when completing this task.

The following labels are used on the microinverter housing: CAUTION - Risk of Electric Shock!

Take note and follow instructions. Failure to follow instructions could result in equipment damage, injury or property damage.

Caution. Hot surface.

Refer to the operating instructions.

IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS 

Perform all electrical installations in accordance with any national and local codes, such as the Australian Standards AS/NZS 3000:2007, AS/NZS 5033 2012, AS 4777.1: 2005, and AS/NZS 1170.2 2011. Only qualified personnel who are accredited by the Clean Energy Council should install and/or replace the AC module.



The microinverter is rated for category III installations. However, in areas with risk of surge conditions due to lightning or grid quality, surge protective devices may be necessary to provide better protection to the microinverter electronics. Refer to AS/NZS 3000 and AS/NZS 1768.



The microinverter is rated IP67 enclosure protection and is suitable for outdoor installations in PV module installations attached directly to the PV module frame.

ACPV Module Installation Guide

v

6



This AC module is intended for operation in an environment having a maximum ambient temperature of
Recommend Documents