Addendum No. 5

Report 1 Downloads 99 Views
Addendum No. 5 The Transit Authority of the City of Omaha

Metro State of Good Repair – Phase II 2222 Cuming Street Omaha, Nebraska 68102 Architect / Coordinating Professional: Reinhardt & Associates, Architects, PC Date Issued: 12 April 2013 To: All Bidders of Record: This Addendum forms a part of the Contract Documents and modifies the original documents dated 1 March 2013. The Bidder must acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to acknowledge receipt may subject the Bidder to disqualification. This Addendum consists of four (4) 8½ x 11 pages, and includes as attachments, three (3) Request for Clarification forms, six (6) Request for Substitution forms, and eight (8) 8½ x 11 Sketch Sheets. The Contract Documents are hereby modified as follows:

NOTE - THIS ADDENDUM INCLUDES A CHANGE OF BID DATE. PREVIOUS ADDENDA AD5-1 Refer to Addendum 4 item AD4-30: Delete Flag Note 5 and substitute “5. Modify sprinkler layout to accommodate new air handling unit. See Sheets M-14, M-15 and M-16 for locations and equipment layouts. Typical of eighteen (18) penthouses.” GENERAL Request for Clarification (dated 10 April 2013): Reference to Section 23 0923. AD5-2 Requested Clarification: What is the existing Siemens front-end software/platform? Response: Siemens Insight Workstation with APOGEE System Software & Web Applications. AD5-3 Requested Clarification: Who will be responsible for integrating the new DDC with the existing system? Response: The successful bidder is required integrate the new controls with the existing software. All points in this project must be programmed into the existing software. AD5-4 Requested Clarification: What is the preferred method of integration with the Siemens system; ex. BACnet IP point server? Response: The existing system uses BACnet/IP. AD5-5 Requested Clarification: Are there any existing controls or systems that are to remain on the Siemens system? Response: All existing equipment not included in this project will remain on the existing Siemens system. All new equipment must interface with the existing Siemens system. AD5-6 Requested Clarification: Please clarify whether all new AHUs are to be provided with packaged digital controls (by MFG.) or with new digital controls by the selected temperature control contractor per Sections 230923 and 230993. 1 of 4 th

418 South 14 Street / Omaha, Nebraska 68102 / Phone (402) 861-0523 / Fax (402) 861-0530

Response: Air handling units AHU-1-18 as specified in Section 23 7313 Modular Central Station AirHandling Units will require controls per Sections 230923. Air handling units AHU-29 and AHU-30 will have factory mounted controls per the applicable specification sections. Sequence and points for all AHUs are per the appropriate portions of 23 0993. See also Addendum 3. Request for Clarification (dated 10 April 2013): Reference to Section 23 0993. AD5-7 Requested Clarification: Please specify which AHUs are to be controlled per sequence referenced in 230993-3.3 (AHU-1 thru AHU-14 are not mentioned). Response: This paragraph applies to all AHUs in general with specific differences identified as written. AD5-8 Requested Clarification: AHU sequence of operations call for OA economizer damper and min OA damper as well as monitoring of both the min and total OA flow. Please clarify if two (per unit) airflow stations are required and where these are to be located. Response: No airflow stations are required. These units are 100% OA AD5-9 Request for Substitution/Approved Equals (dated 8 April 2013): Reference to Section 23 2500 – HVAC Water Treatment. Requested Approved Equal: General Treatment Products. Response: Approved (form attached). Requested Approved Equal: General Treatment Products. Response: Approved (form attached). AD5-10 Request for Substitution/Approved Equals (dated 9 April 2013): Reference to Section 23 3300 – Air Duct Accessories. Requested Approved Equal: Air Balance Inc. Response: Not Approved (form attached). AD5-11 Request for Substitution/Approved Equals (dated 9 & 5 April 2013): Reference to Section 23 3516 – Engine Exhaust Systems. Requested Approved Equal: NSGV. Response: Approved (form attached). Requested Approved Equal: Ventaire, Inc. Response: Approved (form attached). AD5-12 Request for Substitution/Approved Equals (dated 9 April 2013): Reference to Section 23 3700 – Air Outlets and Inlets. Requested Approved Equal: Air Balance Inc. Response: Not Approved (form attached).

PROJECT MANUAL AD5-13 Information for Bidders, Item 4 Requests for Clarification, Paragraph C: change deadline for submitting th th Requests for Clarification from 5:00pm on Wednesday, April 10 , 2013 to 5:00pm Thursday, April 18 , 2013. Responses to all submitted Requests for Clarification will be provided by Addendum no later than nd Monday, April 22 , 2013. AD5-14 Information for Bidders, Item 5 Product Options and Substitutions, Paragraph C: change deadline for th submitting Requests for Substitutions/Approved Equals from 5:00pm on Wednesday, April 10 , 2013 to th 5:00pm Thursday, April 18 , 2013. Responses to all submitted Requests for Substitutions/Approved nd Equals will be provided by Addendum no later than Monday, April 22 , 2013. 2 of 4 th

418 South 14 Street / Omaha, Nebraska 68102 / Phone (402) 861-0523 / Fax (402) 861-0530

th

AD5-15 Information for Bidders, Item 7 Bid Date & Location, Change bid date from Wednesday, April 17 , th 2013 to Wednesday, April 24 , 2013. The time (1:00pm) and the location remain as noted. Metro intends to convene to hold a special Board meeting prior to the regular May Board meeting to review proposals. AD5-16 Section 23 2500 - HVAC Water Treatment

1.

Page 23 2500-2, Paragraph 2.1, Add as follows: “I. General Treatment Products.” Page 23 2500-2, Subparagraph 2.2.A, Add as follows: “4. General Treatment Products.” Page 23 2500-3, Paragraph 3.4, Add as follows: “D. Glycol will fill entire existing heating system. System volume is approximately 7,500 gallons. Provide adequate amount of glycol to achieve percentage glycol as specified.”

2. 3.

AD5-17 Section 23 3516 - Engine Exhaust Systems

1.

Page 23 2516-2, Paragraph 2.1, Add as follows: “H. Ventaire. I. National Systems of Garage Ventilation.”

AD5-18 Section 23 7313 - Modular Central-Station Air-Handling Units 1.

Page 23 7313-2, Paragraph 2.2, Add as follows: “G.

Xetex.”

AD5-19 Section 26 0534 – Conduit

1.

Page 26 0534-3, Paragraph 2.5, Add as follows: “C. Colored EMT 1. Manufacturer: Allied Tube and Conduit. 2. Color Code: a. Fire alarm: Red. b. HVAC Controls: Blue.”

DRAWINGS AD5-20 Sheet C-1 Removals Plan: Add the following note: “EXISTING BUS WASH EQUIPMENT WILL REMAIN (NO REPLACEMENT). THE CONTRACTOR WILL NOT BE REQUIRED TO REMOVE ANY EQUIPMENT, BUT WILL COORDINATE WITH METRO REGARDING WORK IN THE BUS WASH AREA.” AD5-21 Sheet M-23 Floor Plans – Plumbing Demolition 1.

Flag Note 1: Delete in its entirety and substitute “Demolition of underground tanks by others as part of this project. See Sheet C-1 for coordination.”

AD5-22 Sheet E-0 – Electrical Symbols and Abbreviations 1.

Fire alarm Note 3: Delete “Provide wiring to BAS system as required.” Replace “BAS” with “security” (two locations).

AD5-23 Sheet E-2 – Floor Plans – Demolition: See attached Sketch Sheet ES-001. AD5-24 Sheet E-3 – Floor Plans – Demolition: See attached Sketch Sheet ES-002. 3 of 4 th

418 South 14 Street / Omaha, Nebraska 68102 / Phone (402) 861-0523 / Fax (402) 861-0530

AD5-25 Sheet E-4 - Floor Plans – Demolition: See attached Sketch Sheet ES-003. AD5-26 Sheet E-12 – Floor Plans – Electrical: See attached Sketch Sheet ES-004. AD5-27 Sheet E-13 – Floor Plans – Electrical: See attached Sketch Sheet ES-005. AD5-28 Sheet E-14 – Floor Plans – Electrical: See attached Sketch Sheet ES-006. AD5-29 Sheet E-16 – Lower Level Floor Plan – Electrical:

1.

Bus service S-100: Delete fuel pumps noted by Flag Note 15 (three locations).

2.

Delete Flag Note 15 and substitute “Not Used.”

AD5-30 Sheet E-19 – Upper Floor Plan – Electrical: See attached Sketch Sheet ES-007. AD5-31 Sheet E-26 – Schedules:

1.

Lighting Fixture Schedule: Add fixture Type 19 as follows: “Manufacturer: Lithonia Catalog Number: VRC LED1 50K MVOLT Lamp Quantity and Size: Furn W/ Fixture Lamp Type: LED Volts: 277 Mounting: Surface ceiling Description: Utility”

2.

Equipment Connection Schedule: A. AHU-22: 1) In “disconnect” column, delete “60/3” and substitute “(2) 30/3.” In “remarks” column add “12.” B. AHU-23: 1) In “disconnect” column, delete “60/3” and substitute “(2) 30/3.” In “remarks” column add “12.” C. Add Note 12: “Provide 3-#10, #10G, 3/4″C to each fan.

AD5-32 Sheet T-6 – Lower Floor Plan – Telecom: Refer to clouded revision on attached Sketch TS-003.

END of ADDENDUM

4 of 4 th

418 South 14 Street / Omaha, Nebraska 68102 / Phone (402) 861-0523 / Fax (402) 861-0530

Alvine Engineering MATCHLINE - E-5

MATCHLINE - E-2

Alvine Engineering

MATCHLINE - E-4

Alvine Engineering

Alvine Engineering MATCHLINE - E-15

MATCHLINE - E-12

Alvine Engineering

Alvine Engineering

Alvine Engineering MATCHLINE - E-14

MATCHLINE - E-13

Alvine Engineering