AgXcel

Report 1 Downloads 102 Views
JOHN DEERE XP MODELS SSTUBE INSTALL INSTALLATION GUIDE – PART #54084 - FOR XP MODELS WITH CCS USING A SINGLE OUT THE BACK SS TUBE (Read Instructions Completely before Beginning Installation)

Installation Steps: Before you begin, verify the “package contents” to ensure all items are included.

Step #1: LOCATE PRE-EXISTING SLOTS ON THE TAIL SECTION OF YOUR PLANTER & GATHER NECCESARY TOOLS, HARDWARE AND STAINLESS STEEL TUBES FOR EACH ROW

PRE-EXISTING SLOTS

WWW.AGXCEL.COM

877-218-1981 [email protected]

Step #2: FIND YOUR PREFERRED INSTALLATION POINT AND INSTALL THE STAINLESS STEEL TUBE

Step #3: COMPLETED INSTALLATION SHOULD BE SIMILAR TO THE ILLUSTRATION BELOW

Step #4: YOU CAN ADD 3/8” ANHYDROUS TUBE WITH A #6 STAINLESS CLAMP TO EXTEND DISPENSING POINT.



WWW.AGXCEL.COM

877-218-1981 [email protected]