Air Plan Approval; Alabama

Report 0 Downloads 90 Views
This document is scheduled to be published in the Federal Register on 03/30/2018 and available online at https://federalregister.gov/d/2018-06367, and on FDsys.gov

6560-50-P ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [AL-2017; FRL-9975-72-Region 4] Air Plan Approval; Alabama; Update to Materials Incorporated by Reference

AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule; notification of administrative change. SUMMARY: The Environmental Protection Agency (EPA) is updating the materials that are incorporated by reference (IBR) into the Alabama state implementation plan (SIP). The regulations affected by this update have been previously submitted by Alabama and approved by EPA. This update affects the materials that are available for public inspection at the National Archives and Records Administration (NARA) and the EPA Regional Office. DATES: This action is effective [Insert date of publication in the Federal Register]. ADDRESSES: SIP materials which are incorporated by reference into 40 CFR part 52 are available for inspection at the following locations: Environmental Protection Agency, Region 4, 61 Forsyth Street, SW, Atlanta, GA 30303; and the National Archives and Records Administration. For information on the availability of this material at NARA, call 202-7416030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html. To view the materials at the Region 4 Office, EPA request that you email the contact listed in the FOR FURTHER INFORMATION CONTACT section. FOR FURTHER INFORMATION CONTACT: Sean Lakeman, Air Regulatory Management Section, Air Planning and Implementation Branch, Air, Pesticides and Toxics Management

Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street, SW, Atlanta, Georgia 30303-8960. Mr. Lakeman can be reached via telephone at (404) 562-9043 or via electronic mail at [email protected]. SUPPLEMENTARY INFORMATION: I.

Background Each state has a SIP containing the control measures and strategies used to attain and

maintain the national ambient air quality standards (NAAQS). The SIP is extensive, containing such elements as air pollution control regulations, emission inventories, monitoring networks, attainment demonstrations, and enforcement mechanisms. Each state must formally adopt the control measures and strategies in the SIP after the public has had an opportunity to comment on them and then submit the proposed SIP revisions to EPA. Once these control measures and strategies are approved by EPA, after notice and comment, they are incorporated into the federally-approved SIP and are identified in part 52 “Approval and Promulgation of Implementation Plans,” Title 40 of the Code of Federal Regulations (40 CFR part 52). The full text of the state regulation approved by EPA is not reproduced in its entirety in 40 CFR part 52, but is “incorporated by reference.” This means that EPA has approved a given state regulation with a specific effective date. The public is referred to the location of the full text version should they want to know which measures are contained in a given SIP. The information provided allows EPA and the public to monitor the extent to which a state implements a SIP to attain and maintain the NAAQS and to take enforcement action if necessary. The SIP is a living document which the state can revise as necessary to address the 2

unique air pollution problems in the state. Therefore, EPA from time to time must take action on proposed revisions containing new and/or revised state regulations. A submission from a state can revise one or more rules in their entirety or portions of rules, or even change a single word. The state indicates the changes in the submission (such as, by using redline/strikethrough) and EPA then takes action on the requested changes. EPA establishes a docket for its actions using a unique Docket Identification Number. which is listed in each action. These dockets and the complete submission are available for viewing on www.regulations.gov. On May 22, 1997, (62 FR 27968), EPA revised the procedures for incorporating by reference, into the Code of Federal Regulations, materials approved by EPA into each state SIP. These changes revised the format for the identification of the SIP in 40 CFR part 52, streamlined the mechanisms for announcing EPA approval of revisions to a SIP, and streamlined the mechanisms for EPA’s updating of the IBR information contained for each SIP in 40 CFR part 52. The revised procedures also called for EPA to maintain “SIP Compilations” that contain the federally-approved regulations and source specific permits submitted by each state agency. These SIP Compilations are contained in 3-ring binders and are updated primarily on an annual basis. Under the revised procedures, EPA must periodically publish an informational document in the rules section of the Federal Register notifying the public that updates have been made to a SIP Compilation for a particular state. EPA applied the 1997 revised procedures to Alabama on December 22, 1998 (63 FR 70669). II.

EPA Action This action represents EPA’s publication of the Alabama SIP Compilation update,

appearing in 40 CFR part 52: specifically, the materials of paragraphs (c) and (d) at 40 CFR 52. 3

In addition, notice is provided of the following corrections to paragraph (c) of section 52.50, as described below: A. Under the “State effective date” and “EPA approval date” changing the 2-digit year to reflect a 4-digit year (for consistency) and correcting numerous Federal Register citations to reflect the first page of the preamble as opposed to the regulatory text page. B. Section 335-3-1-.05: revising entry to read “Sampling and Testing Methods.” C. Section 335-3-3-.01: State effective date is revised to read “1/22/2008” and EPA approval date is revised to read “9/15/2008; 73 FR 53134.” D. Section 335-3-4-.01: State effective date is revised to read “9/30/2008” and EPA approval date is revised to read “10/15/2008; 73 FR 60957.” E. Section 335-3-4-.16: entry is removed from the table because the rule was reserved. F. Section 335-3-5-.10: revising entry to read “TR SO2 Trading Program – computation of Time. G. Section 335-3-5-.20: entry is removed from the table because the rule was reserved. H. Section 335-3-5-.30: entry is removed from the table because the rule was reserved. I. Section 335-3-6-.02: State effective date is revised to read “4/15/1987” and EPA approval date is revised to read “9/27/1993; 58 FR 50262.” J. Section 335-3-6-.03: State effective date is revised to read “4/15/1987” and EPA approval date is revised to read “9/27/1993; 58 FR 50262.” K. Section 335-3-6-.19: entry is removed from the table because the rule was reserved. L. Section 335-3-6-.26: State effective date is revised to read “4/15/1987” and EPA 4

approval date is revised to read “9/27/1993; 58 FR 50262.” M. Section 335-3-6-.31: State effective date is revised to read “4/15/1987” and EPA approval date is revised to read “9/27/1993; 58 FR 50262.” N. Section 335-3-6-.33: State effective date is revised to read “10/15/1996” and EPA approval date is revised to read “6/6/1997; 62 FR 30991.” O. Section 335-3-6-.35: State effective date is revised to read “4/15/1987” and EPA approval date is revised to read “9/27/1993; 58 FR 50262.” P. Section 335-3-6-.40: entry is removed from the table because the rule was reserved. Q. Section 335-3-6-.43: State effective date is revised to read “10/15/1996” and EPA approval date is revised to read “6/6/1997; 62 FR 30991.” R. Section 335-3-6-.49: State effective date is revised to read “10/15/1996” and EPA approval date is revised to read “6/6/1997; 62 FR 30991.” S. Section 335-3-6-.53: State effective date is revised to read “10/15/1996” and EPA approval date is revised to read “6/6/1997; 62 FR 30991.” T. Section 335-3-8-.04: Title/subject is changed to remove the word “(Reserved)”. U. Section 335-3-8-.15: entry is removed from the table because the rule was reserved. V. Section 335-3-8-.19: removing the explanation because EPA inadvertently inserted this explanation in its August 31, 2016 (81 FR 59869) approval of this section. There is only one section of 335-3-8-.19 in the approved SIP. W. Section 335-3-8-.22: entry is removed from the table because the rule was reserved. X. Section 335-3-8-.47: entry is removed from the table because the rule was reserved. Y. Section 335-3-8-.54: entry is removed from the table because the rule was reserved. 5

Z. Section 335-3-8-.64: entry is removed from the table because the rule was reserved. AA. Section 335-3-14-.04: revising entry to read “Air Permits Authorizing Construction in Clean Air Areas (Prevention of Significant Deterioration (PSD)) BB. Chapter 335-3-20 heading and Sections 335-3-20-.01 through 335-3-20-.03: entries are removed from the table because the rule was reserved. III.

Good Cause Exemption EPA has determined that this action falls under the “good cause” exemption in section

553(b)(3)(B) of the Administrative Procedure Act (APA) which, upon finding “good cause,” authorizes agencies to dispense with public participation and section 553(d)(3) which allows an agency to make an action effective immediately (thereby avoiding the 30-day delayed effective date otherwise provided for in the APA). This administrative action simply codifies provisions which are already in effect as a matter of law in Federal and approved state programs and corrects typographical errors appearing in the CFR. Under section 553(b)(3)(B) of the APA, an agency may find good cause where procedures are “impracticable, unnecessary, or contrary to the public interest.” Public comment for this administrative action is “unnecessary” and “contrary to the public interest” since the codification (and typographical corrections) only reflect existing law. Immediate notice of this action in the Federal Register benefits the public by providing the public notice of the updated Alabama SIP Compilation and notice of typographical corrections to the Alabama “Identification of Plan” portion of the Federal Register. Further, pursuant to section 553(d)(3), making this action immediately effective benefits the public by immediately updating both the SIP compilation and the CFR “Identification of plan” section (which includes table entry corrections). 6

IV.

Incorporation by Reference In this rule, EPA is finalizing regulatory text that includes incorporation by reference. In

accordance with requirements of 1 CFR 51.5, EPA is finalizing the incorporation by reference of previously EPA-approved regulations promulgated by Alabama and federally effective prior to October 1, 2017. EPA has made, and will continue to make, these materials generally available through www.regulations.gov and at the EPA Region 4 Office (please contact the person identified in the FOR FURTHER INFORMATION CONTACT section of this preamble for more information). V.

Statutory and Executive Order Reviews: Under the CAA, the Administrator is required to approve a SIP submission that complies

with the provisions of the Act and applicable federal regulations. See 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA’s role is to approve state choices, provided that they meet the criteria of the CAA. Accordingly, this notification of administrative change does not impose additional requirements beyond those imposed by state law. For that reason, this action:  is not a “significant regulatory action” subject to review by the Office of Management and Budget under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);  does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);  is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.); 7

 does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Public Law 104-4);  does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);  is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);  is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);  is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and  does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994). The SIP is not approved to apply on any Indian reservation land or in any other area where EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the rule does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), nor will it impose substantial direct costs on tribal governments or preempt tribal law. The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take 8

effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a “major rule” as defined by 5 U.S.C. 804(2). EPA also believes that the provisions of section 307(b)(1) of the CAA pertaining to petitions for judicial review are not applicable to this action. This is because prior EPA rulemaking actions for each individual component of the Alabama SIP compilations previously afforded interested parties the opportunity to file a petition for judicial review in the United States Court of Appeals for the appropriate circuit within 60 days of such rulemaking action. Thus, EPA believes judicial review of this action under section 307(b)(1) of the CAA is not available.

9

List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Carbon monoxide, Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds.

Dated: January 29, 2018.

Onis “Trey” Glenn, III Regional Administrator, Region 4.

10

40 CFR part 52 is amended as follows: PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS 1. The authority citation for part 52 continues to read as follows: Authority: 42 U.S.C. 7401 et seq. Subpart B–Alabama 2. In § 52.50, paragraphs (b), (c) and (d) are revised to read as follows: § 52.50 Identification of plan. ***** (b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to October 1, 2017, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after October 1, 2017, will be incorporated by reference in the next update to the SIP compilation. (2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1). (3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street, SW., Atlanta, GA 30303. To obtain the material, please call (404) 562-9022. You may inspect the material with an EPA approval date prior to October 1, 11

2017, for Alabama at the National Archives and Records Administration. For information on the availability of this material at NARA go to: http://www.archives.gov/federal-register/cfr/ibrlocations.html. (c) EPA Approved Alabama Regulations. EPA Approved Alabama Regulations

State citation

Title/subject

State effective date

EPA approval date

Chapter No. 335-3-1 General Provision Section Purpose 335-3-1.01

6/22/1989 3/19/1990; 55 FR 10062

Section Definitions 335-3-1.02

5/19/2017 10/13/2017, 82 FR 47631

Section Ambient Air Quality 335-3-1- Standards .03

10/13/1998 3/01/1999; 64 FR 9918

Section Monitoring, Records, 335-3-1- and Reporting .04

10/15/1996 6/06/1997; 62 FR 30991

Section Sampling and Testing 335-3-1- Methods .05

6/22/1989 3/19/1990; 55 FR 10062

Section Compliance Schedule 335-3-1.06

10/15/1996 6/06/1997; 62 FR 30991

Section Maintenance and 335-3-1- Malfunctioning of .07 Equipment; Reporting

10/15/1989 3/19/1990; 55 FR 10062

Section Prohibition of Air 335-3-1- Pollution .08

8/10/2000 12/8/2000; 65 FR 76938

12

Explanation

Section Variances 335-3-1.09

10/15/1996 6/6/1997; 62 FR 30991

Section Circumvention 335-3-1.10 Section Severability 335-3-1.11

6/22/1989 3/19/1990; 55 FR 10062 10/15/1996 6/6/1997; 62 FR 30991

Section Bubble Provision 335-3-1.12

6/22/1989 3/19/1990; 55 FR 10062

Section Credible Evidence 335-3-1.13

4/13/1999 11/3/1999; 64 FR 59633

Section Emissions Reporting 335-3-1- Requirements Relating .14 to Budgets for NOX Emissions

4/6/2001 7/16/2001; 66 FR 36921

Section Emissions Inventory 335-3-1- Reporting Requirements .15

4/3/2003 4/24/2003; 68 FR 20077

Chapter No. 335-3-2 Air Pollution Emergency Section Air Pollution 335-3-2- Emergency .01

6/22/1989 3/19/1990; 55 FR 10062

Section Episode Criteria 335-3-2.02

8/10/2000 12/8/2000; 65 FR 76940

Section Special Episode Criteria 335-3-2.03

6/22/1989 3/19/1990; 55 FR 10062

Section Emission Reduction 335-3-2- Plans .04

6/22/1989 3/19/1990; 55 FR 10062

Section Two Contaminant 335-3-2- Episode

6/22/1989 3/19/1990; 55 FR 10062 13

.05 Section General Episodes 335-3-2.06

6/22/1989 3/19/1990; 55 FR 10062

Section Local Episodes 335-3-2.07

6/22/1989 3/19/1990; 55 FR 10062

Section Other Sources 335-3-2.08 Section Other Authority Not 335-3-2- Affected .09

10/15/1996 6/6/1997; 62 FR 30991 6/22/1989 3/19/1990; 55 FR 10062

Chapter No. 335-3-3 Control of Open Burning and Incineration Section Open Burning 335-3-3.01

1/22/2008 9/15/2008; 73 FR 53134

Section Incinerators 335-3-3.02

6/22/1989 3/19/1990; 55 FR 10062

Section Incineration of Wood, 335-3-3- Peanut, and Cotton .03 Ginning Waste

8/10/2000 12/8/2000; 65 FR 76938

Chapter No. 335-3-4 Control of Particulate Emissions Section Visible Emissions 335-3-4.01 Section Fugitive Dust and 335-3-4- Fugitive Emissions .02

9/30/2008 10/15/2008; 73 FR 60957 10/15/1996 6/6/1997; 62 FR 30991

Section Fuel Burning Equipment 10/15/1996 6/6/1997; 62 335-3-4FR 30991 .03 Section Process Industries— 335-3-4- General .04

10/15/1996 6/6/1997; 62 FR 30991

14

Section Small Foundry Cupola 335-3-4.05

6/22/1989 3/19/1990; 55 FR 10062

Section Cotton Gins 335-3-4.06

6/22/1989 3/19/1990; 55 FR 10062

Section Kraft Pulp Mills 335-3-4.07 Section Wood Waste Boilers 335-3-4.08

10/15/1996 6/6/1997; 62 FR 30991 6/9/2017 10/13/2017; 82 FR 47631

Section Coke Ovens 335-3-4.09

8/10/2000 12/8/2000; 65 FR 76940

Section Primary Aluminum 335-3-4- Plants .10

6/22/1989 3/19/1990; 55 FR 10062

Section Cement Plants 335-3-4.11

10/15/1996 6/6/1997; 62 FR 30991

Section Xylene Oxidation 335-3-4- Process .12

6/22/1989 3/19/1990; 55 FR 10062

Section Sintering Plants 335-3-4.13

6/22/1989 3/19/1990; 55 FR 10062

Section Grain Elevators 335-3-4.14

10/15/1996 6/6/1997; 62 FR 30991

Section Secondary Lead 335-3-4- Smelters .15

10/15/1996 6/6/1997; 62 FR 30991

Section Steel Mills Located in 335-3-4- Etowah County .17

10/15/1996 6/6/1997; 62 FR 30991

Chapter No. 335-3-5 Control of Sulfur Compound Emissions 15

Section Fuel Combustions 335-3-5.01

10/15/1996 6/6/1997; 62 FR 30991

Section Sulfuric Acid Plants 335-3-5.02

10/15/1996 6/6/1997; 62 FR 30991

Section Petroleum Production 335-3-5.03

8/10/2000 12/8/2000; 65 FR 76938

Section Kraft Pulp Mills 335-3-5.04

8/10/2000 12/8/2000; 65 FR 76938

Section Process Industries— 335-3-5- General .05

6/22/1989 3/19/1990; 55 FR 10062

Section State Clean Air 335-3-5- Interstate Rule (CAIR) .06 SO2 Trading Program General Provisions Section TR SO2 Trading 335-3-5- Program—Purpose and .06 Definitions Section CAIR Designated 335-3-5- Representative for CAIR .07 SO2 Sources Section TR SO2 Trading 335-3-5- Program—Applicability .07 Section Permits 335-3-5.08

4/3/2007 10/1/2007; 72 FR 55659

11/24/2015 8/31/2016, Both sections of 335-3-5-.06 are 81 FR 59869 included in the approved SIP. 4/3/2007 10/1/2007; 72 FR 55659 11/24/2015 8/31/2016, Both sections of 335-3-5-.07 are 81 FR 59869 included in the approved SIP. 4/3/2007 10/1/2007; 72 FR 55659

Section TR SO2 Trading 335-3-5- Program—Retired Unit .08 Exemption

11/24/2015 8/31/2016, Both sections of 335-3-5-.08 are 81 FR 59869 included in the approved SIP.

Section TR SO2 Trading 335-3-5- Program—Standard .09 Requirements

11/24/2015 8/31/2016, 81 FR 59869

16

Section TR SO2 Trading 335-3-5- Program—computation .10 of Time Section CAIR SO2 Allowance 335-3-5- Tracking System .11 Section Administrative Appeal 335-3-5- Procedures .11 Section CAIR SO2 Allowance 335-3-5- Transfers .12 Section SO2 Trading Budgets 335-3-5- and Variability Limits .12 Section Monitoring and 335-3-5- Reporting .13 Section TR SO2 Allowance 335-3-5- Allocations .13 Section CAIR SO2 Opt-in Units 335-3-5.14

11/24/2015 8/31/2016, 81 FR 59869 4/3/2007 10/1/2007; 72 FR 55659 11/24/2015 8/31/2016, Both sections of 335-3-5-.11 are 81 FR 59869 included in the approved SIP. 4/3/2007 10/1/2007; 72 FR 55659 11/24/2015 8/31/2016, Both sections of 335-3-5-.12 are 81 FR 59869 included in the approved SIP. 4/3/2007 10/1/2007; 72 FR 55659 11/24/2015 8/31/2016, Both sections of 335-3-5-.13 are 81 FR 59869 included in the approved SIP. 4/3/2007 10/1/2007; 72 FR 55659

Section Authorization of 335-3-5- Designated .14 Representative and Alternate Designated Representative

11/24/2015 8/31/2016, Both sections of 335-3-5-.14 are 81 FR 59869 included in the approved SIP.

Section Responsibilities of 335-3-5- Designated .15 Representative and Alternate Designated Representative

11/24/2015 8/31/2016, 81 FR 59869

Section Changing Designated 11/24/2015 8/31/2016, 335-3-5- Representative and 81 FR 59869 .16 Alternate Designated Representative; Changes 17

in Owners and Operators; Changes in Units at the Source Section Certificate of 335-3-5- Representation .17

11/24/2015 8/31/2016, 81 FR 59869

Section Objections Concerning 335-3-5- Designated .18 Representative and Alternate Designated Representative

11/24/2015 8/31/2016, 81 FR 59869

Section Delegation by 335-3-5- Designated .19 Representative and Alternate Designated Representative

11/24/2015 8/31/2016, 81 FR 59869

Section Establishment of 335-3-5- Compliance Accounts, .21 Assurance Accounts, and General Accounts

11/24/2015 8/31/2016, 81 FR 59869

Section Recordation of TR SO2 335-3-5- Allowance Allocations .22 and Auction Results

11/24/2015 8/31/2016, 81 FR 59869

Section Submission of TR SO2 335-3-5- Allowance Transfers .23

11/24/2015 8/31/2016, 81 FR 59869

Section Recordation of TR SO2 335-3-5- Allowance Transfers .24

11/24/2015 8/31/2016, 81 FR 59869

Section Compliance with TR 335-3-5- SO2 Emissions .25 Limitation

11/24/2015 8/31/2016, 81 FR 59869

Section Compliance with TR 335-3-5- SO2 Assurance .26 Provisions

11/24/2015 8/31/2016, 81 FR 59869

Section Banking 335-3-5.27

11/24/2015 8/31/2016, 81 FR 59869

18

Section Account Error 335-3-5.28

11/24/2015 8/31/2016, 81 FR 59869

Section Administrator's Action 335-3-5- on Submissions .29

11/24/2015 8/31/2016, 81 FR 59869

Section General Monitoring, 335-3-5- Recordkeeping, and .31 Reporting Requirements

11/24/2015 8/31/2016, 81 FR 59869

Section Initial Monitoring 11/24/2015 8/31/2016, 335-3-5- System Certification and 81 FR 59869 .32 Recertification Procedures Section Monitoring System Out335-3-5- of-Control Periods .33

11/24/2015 8/31/2016, 81 FR 59869

Section Notifications 335-3-5- Concerning Monitoring .34

11/24/2015 8/31/2016, 81 FR 59869

Section Recordkeeping and 335-3-5- Reporting .35

11/24/2015 8/31/2016, 81 FR 59869

Section Petitions for 335-3-5- Alternatives to .36 Monitoring, Recordkeeping, or Reporting Requirements

11/24/2015 8/31/2016, 81 FR 59869

Chapter No. 335-3-6 Control of Organic Emissions Section Applicability 335-3-6.01

10/15/1996 6/6/1997; 62 FR 30991

Section VOC Water Separation 335-3-6.02

4/15/1987 9/27/1993; 58 FR 50262

Section Loading and Storage of 335-3-6- VOC .03

4/15/1987 9/27/1993; 58 FR 50262

19

Section Fixed-Roof Petroleum 335-3-6- Liquid Storage Vessels .04

10/15/1996 6/6/1997; 62 FR 30991

Section Bulk Gasoline Plants 335-3-6.05

10/15/1996 6/6/1997; 62 FR 30991

Section Bulk Gasoline 335-3-6- Terminals .06 Section Gasoline Dispensing 335-3-6- Facilities—Stage I .07

8/10/2000 12/8/2000; 65 FR 76938 10/15/1996 6/6/1997; 62 FR 30991

Section Petroleum Refinery 335-3-6- Sources .08

6/22/1989 3/19/1990; 55 FR 10062

Section Pumps and Compressors 335-3-6.09

6/22/1989 3/19/1990; 55 FR 10062

Section Ethylene Producing 335-3-6- Plants .10

6/22/1989 3/19/1990; 55 FR 10062

Section Surface Coating 335-3-6.11

10/15/1996 6/6/1997; 62 FR 30991

Section Solvent Metal Cleaning 335-3-6.12

10/15/1996 06/6/1997; 62 FR 30991

Section Cutback Asphalt 335-3-6.13

10/15/1996 6/6/1997; 62 FR 30991

Section Petition for Alternative 335-3-6- Controls .14

6/22/1989 3/19/1990; 55 FR 10062

Section Compliance Schedules 335-3-6.15

10/15/1996 6/6/1997; 62 FR 30991

Section Test Methods and

8/10/2000 12/8/2000; 20

335-3-6- Procedures .16 Section Manufacture of 335-3-6- Pneumatic Tires .17

65 FR 76938 10/15/1996 6/6/1997; 62 FR 30991

Section Manufacture of 10/15/1996 6/6/1997; 62 335-3-6- Synthesized FR 30991 .18 Pharmaceutical Products Section Leaks from Gasoline 335-3-6- Tank Trucks and Vapor .20 Collection Systems

10/15/1996 6/6/1997; 62 FR 30991

Section Leaks from Petroleum 335-3-6- Refinery Equipment .21

10/15/1996 6/6/1997; 62 FR 30991

Section Graphic Arts 335-3-6.22

10/15/1996 6/6/1997; 62 FR 30991

Section Petroleum Liquid 335-3-6- Storage in External .23 Floating Roof Tanks

10/15/1996 6/6/1997; 62 FR 30991

Section Applicability 335-3-6.24

10/15/1996 6/6/1997; 62 FR 30991

Section VOC Water Separation 335-3-6.25

6/22/1989 3/19/1990; 55 FR 10062

Section Loading and Storage of 335-3-6- VOC .26

4/15/1987 9/27/1993; 58 FR 50262

Section Fixed-Roof Petroleum 335-3-6- Liquid Storage Vessels .27

10/15/1996 6/6/1997; 62 FR 30991

Section Bulk Gasoline Plants 335-3-6.28

10/15/1996 6/6/1997; 62 FR 30991

Section Gasoline Terminals 335-3-6-

10/15/1996 6/6/1997; 62 FR 30991 21

.29 Section Gasoline Dispensing 335-3-6- Facilities Stage 1 .30 Section Petroleum Refinery 335-3-6- Sources .31

10/15/1996 6/6/1997; 62 FR 30991 4/15/1987 9/27/1993; 58 FR 50262

Section Surface Coating 335-3-6.32

10/15/1996 6/6/1997; 62 FR 30991

Section Solvent Metal Cleaning 335-3-6.33

10/15/1996 6/6/1997; 62 FR 30991

Section Cutback Asphalt 335-3-6.34

10/15/1996 6/6/1997; 62 FR 30991

Section Petition for Alternative 335-3-6- Controls .35

4/15/1987 9/27/1993; 58 FR 50262

Section Compliances Schedules 335-3-6.36

10/15/1996 6/6/1997; 62 FR 30991

Section Test Methods and 335-3-6- Procedures .37

10/15/1996 6/6/1997; 62 FR 30991

Section Manufacture of 335-3-6- Pneumatic Tires .38

6/22/1989 3/19/1990; 55 FR 10062

Section Manufacture of 10/15/1996 6/6/1997; 62 335-3-6- Synthesized FR 30991 .39 Pharmaceutical Products Section Leaks from Gasoline 335-3-6- Tank Trucks and Vapor .41 Collection Systems

10/15/1996 6/6/1997; 62 FR 30991

Section Leaks from Petroleum 335-3-6- Refinery Equipment .42

10/15/1996 6/6/1997; 62 FR 30991 22

Section Graphic Arts 335-3-6.43

10/15/1996 6/6/1997; 62 FR 30991

Section Petroleum Liquid 335-3-6- Storage in External .44 Floating Roof Tanks

10/15/1996 6/6/1997; 62 FR 30991

Section Large Petroleum Dry 335-3-6- Cleaners .45

10/15/1996 6/6/1997; 62 FR 30991

Section Aerospace Assembly 335-3-6- and Component and .46 Component Coatings Operation

6/22/1989 6/6/1997; 62 FR 30991

Section Leaks from Coke by335-3-6- Product Recovery Plant .47 Equipment

10/15/1996 6/6/1997; 62 FR 30991

Section Emissions from Coke 335-3-6- by-Product Recovery .48 Plant Coke Oven Gas Bleeder

10/15/1996 6/6/1997; 62 FR 30991

Section Manufacture of 335-3-6- Laminated Countertops .49

10/15/1996 6/6/1997; 62 FR 30991

Section Paint Manufacture 335-3-6.50

10/15/1996 6/6/1997; 62 FR 30991

Section List of EPA Approved 10/15/1996 6/6/1997; 62 335-3-6- and Equivalent Test FR 30991 .53 Methods and Procedures for the Purpose of Determining VOC Emissions Chapter No. 335-3-7 Carbon Monoxide Emissions Section Metals Productions 335-3-7.01

6/22/1989 3/19/1990; 55 FR 10062

Section Petroleum Processes 335-3-7-

6/22/1989 3/19/1990; 55 FR 10062 23

.02 Chapter No. 335-3-8 Control of Nitrogen Oxides Emissions Section Standards for Portland 335-3-8- Cement Kilns .01

4/6/2001 7/17/2001; 66 FR 36919

Section Nitric Acid 335-3-8- Manufacturing .02

10/15/1996 6/6/1997; 62 FR 30991

Section NOX Emissions from 335-3-8- Electric Utility .03 Generating Units

10/24/2000 11/7/2001; 66 FR 56223

Section Standards for Stationary 335-3-8- Reciprocating Internal .04 Combustion Engines

3/22/2005 12/28/2005; 70 FR 76694

Section NOX Budget Trading 335-3-8- Program .05

4/3/2007 10/1/2007; 72 FR 55659

Section Authorized Account 335-3-8- Representative for NOX .06 Budget Sources

4/6/2001 7/16/2001; 66 FR 36919

Section Permits 335-3-8.07

4/6/2001 7/16/2001; 66 FR 36919

Section TR NOX Annual 335-3-8- Trading Program— .07 Purpose and Definitions Section Compliance 335-3-8- Certification .08 Section TR NOX Annual 335-3-8- Trading Program— .08 Applicability Section NOX Allowance 335-3-8- Allocations .09 Section TR NOX Annual 335-3-8- Trading Program—

11/24/2015 8/31/2016, Both sections of 335-3-8-.07 are 81 FR 59869 included in the approved SIP. 4/6/2001 7/16/2001; 66 FR 36919 11/24/2015 8/31/2016, Both sections of 335-3-8-.08 are 81 FR 59869 included in the approved SIP. 4/6/2001 7/16/2001; 66 FR 36919 11/24/2015 8/31/2016, Both sections of 335-3-8-.09 are 81 FR 59869 included in the approved SIP. 24

.09

Retired Unit Exemption

Section NOX Allowance 335-3-8- Tracking System .10 Section TR NOX Annual 335-3-8- Trading Program— .10 Standard Requirements Section NOX Allowance 335-3-8- Transfers .11 Section TR NOX Annual 335-3-8- Trading Program— .11 Computation of Time Section Monitoring and 335-3-8- Reporting .12 Section Administrative Appeal 335-3-8- Procedures .12 Section Individual Unit Opt-ins 335-3-8.13 Section NOX Annual Trading 335-3-8- Budgets and Variability .13 Limits Section New Combustion 335-3-8- Sources .14 Section TR NOX Annual 335-3-8- Allowance Allocations .14 Section CAIR NOX Annual 335-3-8- Budget Trading Program .16 Section Authorization of 335-3-8- Designated .16 Representative and

4/3/2007 10/1/2007; 72 FR 55659 11/24/2015 8/31/2016, Both sections of 335-3-8-.10 are 81 FR 59869 included in the approved SIP. 4/6/2001 7/16/2001; 66 FR 36919 11/24/2015 8/31/2016, Both sections of 335-3-8-.11 are 81 FR 59869 included in the approved SIP. 4/6/2001 7/16/2001; 66 FR 36919 11/24/2015 8/31/2016, Both sections of 335-3-8-.12 are 81 FR 59869 included in the approved SIP. 4/6/2001 7/16/2001; 66 FR 36919 11/24/2015 8/31/2016, Both sections of 335-3-8-.13 are 81 FR 59869 included in the approved SIP. 4/6/2001 7/16/2001; 66 FR 36919 11/24/2015 8/31/2016, Both sections of 335-3-8-.14 are 81 FR 59869 included in the approved SIP. 4/3/2007 10/1/2007; 72 FR 55659 11/24/2015 8/31/2016, Both sections of 335-3-8-.16 are 81 FR 59869 included in the approved SIP. 25

Alternate Designated Representative Section CAIR Designated 335-3-8- Representative for CAIR .17 NOX Sources Section Responsibilities of 335-3-8- Designated .17 Representative and Alternate Designated Representative Section CAIR Permits 335-3-8.18

4/3/2007 10/1/2007; 72 FR 55659 11/24/2015 8/31/2016, Both sections of 335-3-8-.17 are 81 FR 59869 included in the approved SIP.

4/3/2007 10/1/2007; 72 FR 55659

Section Changing Designated 11/24/2015 8/31/2016, Both sections of 335-3-8-.18 are 335-3-8- Representative and 81 FR 59869 included in the approved SIP. .18 Alternate Designated Representative; Changes in Owners and Operators; Changes in Units at the Source Section Certificate of 335-3-8- Representation .19 Section CAIR NOX Allowance 335-3-8- Allocations .20 Section Objections Concerning 335-3-8- Designated .20 Representative and Alternate Designated Representative Section CAIR NOX Allowance 335-3-8- Tracking System .21 Section Delegation by 335-3-8- Designated .21 Representative and Alternate Designated Representative

11/24/2015 8/31/2016, 81 FR 59869 4/3/2007 10/1/2007; 72 FR 55659 11/24/2015 8/31/2016, Both sections of 335-3-8-.20 are 81 FR 59869 included in the approved SIP.

4/3/2007 10/1/2007; 72 FR 55659 11/24/2015 8/31/2016, Both sections of 335-3-8-.21 are 81 FR 59869 included in the approved SIP.

26

Section CAIR Monitoring and 335-3-8- Reporting .23 Section Establishment of 335-3-8- Compliance Accounts, .23 Assurance Accounts, and General Accounts Section CAIR NOX Opt-in Units 335-3-8.24 Section Recordation of TR NOX 335-3-8- Annual Allowance .24 Allocations and Auction Results Section CAIR NOX Ozone 335-3-8- Season Trading Program .25 Section Submission of TR NOX 335-3-8- Annual Allowance .25 Transfers Section CAIR Designated 335-3-8- Representative for CAIR .26 NOX Ozone Season Sources Section Recordation of TR NOX 335-3-8- Annual Allowance .26 Transfers Section CAIR NOX Ozone 335-3-8- Season Permits .27

4/3/2007 10/1/2007; 72 FR 55659 11/24/2015 8/31/2016, Both sections of 335-3-8-.23 are 81 FR 59869 included in the approved SIP.

4/3/2007 10/1/2007; 72 FR 55659 11/24/2015 8/31/2016, Both sections of 335-3-8-.24 are 81 FR 59869 included in the approved SIP.

4/3/2007 10/1/2007; 72 FR 55659 11/24/2015 8/31/2016, Both sections of 335-3-8-.25 are 81 FR 59869 included in the approved SIP. 4/3/2007 10/1/2007; 72 FR 55659

11/24/2015 8/31/2016, Both sections of 335-3-8-.26 are 81 FR 59869 included in the approved SIP. 4/3/2007 10/1/2007; 72 FR 55659

Section Compliance with TR 335-3-8- NOX Annual Emissions .27 Limitation

11/24/2015 8/31/2016, Both sections of 335-3-8-.27 are 81 FR 59869 included in the approved SIP.

Section Compliance with TR 335-3-8- NOX Annual Assurance .28 Provisions

11/24/2015 8/31/2016, 81 FR 59869

Section CAIR NOX Ozone 335-3-8- Season Allowance

4/3/2007 10/1/2007; 72 FR 55659 27

.29

Allocations

Section Banking 335-3-8.29 Section CAIR NOX Ozone 335-3-8- Season Allowance .30 Tracking System

11/24/2015 8/31/2016, Both sections of 335-3-8-.29 are 81 FR 59869 included in the approved SIP. 4/3/2007 10/1/2007; 72 FR 55659

Section Account Error 335-3-8.30

11/24/2015 8/31/2016, Both sections of 335-3-8-.30 are 81 FR 59869 included in the approved SIP.

Section Administrator's Action 335-3-8- on Submissions .31

11/24/2015 8/31/2016, 81 FR 59869

Section CAIR NOX Ozone 335-3-8- Season Monitoring and .32 Reporting

4/3/2007 10/1/2007; 72 FR 55659

Section CAIR NOX Ozone 335-3-8- Season Opt-in Units .33

4/3/2007 10/1/2007; 72 FR 55659

Section General Monitoring, 335-3-8- Recordkeeping, and .33 Reporting Requirements

11/24/2015 8/31/2016, Both sections of 335-3-8-.33 are 81 FR 59869 included in the approved SIP.

Section Initial Monitoring 11/24/2015 8/31/2016, 335-3-8- System Certification and 81 FR 59869 .34 Recertification Procedures Section Monitoring System Out335-3-8- of-Control Periods .35

11/24/2015 8/31/2016, 81 FR 59869

Section Notifications 335-3-8- Concerning Monitoring .36

11/24/2015 8/31/2016, 81 FR 59869

Section Recordkeeping and 335-3-8- Reporting .37

11/24/2015 8/31/2016, 81 FR 59869

Section Petitions for 335-3-8- Alternatives to

11/24/2015 8/31/2016, 81 FR 59869 28

.38

Monitoring, Recordkeeping, or Reporting Requirements

Section TR NOX Ozone Season 335-3-8- Group 2 Trading .39 Program—Purpose and Definitions Section TR NOX Ozone Season 335-3-8- Group 2 Trading .40 Program—Applicability

6/9/2017 10/6/2017, 82 FR 46674

11/24/2015 10/6/2017, 82 FR 46674

Section TR NOX Ozone Season 335-3-8- Group 2 Trading .41 Program—Retired Unit Exemption

6/9/2017 10/6/2017, 82 FR 46674

Section TR NOX Ozone Season 335-3-8- Group 2 Trading .42 Program—Standard Requirements

6/9/2017 10/6/2017, 82 FR 46674

Section TR NOX Ozone Season 335-3-8- Group 2 Trading .43 Program—Computation of Time

6/9/2017 10/6/2017, 82 FR 46674

Section Administrative Appeal 335-3-8- Procedures .44

11/24/2015 10/6/2017, 82 FR 46674

Section NOX Ozone Season 335-3-8- Group 2 Trading .45 Budgets and Variability Limits

6/9/2017 10/6/2017, 82 FR 46674

Section TR NOX Ozone Season 335-3-8- Group 2 Allowance .46 Allocations

6/9/2017 10/6/2017, 82 FR 46674

Section Authorization of 335-3-8- Designated .48 Representative and Alternate Designated Representative

6/9/2017 10/6/2017, 82 FR 46674

Section Responsibilities of

6/9/2017 10/6/2017, 29

335-3-8- Designated .49 Representative and Alternate Designated Representative

82 FR 46674

Section Changing Designated 335-3-8- Representative and .50 Alternate Designated Representative; Changes in Owners and Operators; Changes in Units at the Source

6/9/2017 10/6/2017, 82 FR 46674

Section Certificate of 335-3-8- Representation .51

6/9/2017 10/6/2017, 82 FR 46674

Section Objections Concerning 335-3-8- Designated .52 Representative and Alternate Designated Representative

6/9/2017 10/6/2017, 82 FR 46674

Section Delegation by 335-3-8- Designated .53 Representative and Alternate Designated Representative

6/9/2017 10/6/2017, 82 FR 46674

Section Establishment of 335-3-8- Compliance Accounts, .55 Assurance Accounts, and General Accounts

6/9/2017 10/6/2017, 82 FR 46674

Section Recordation of TR NOX 335-3-8- Ozone Season Group 2 .56 Allowance Allocations and Auction Results

6/9/2017 10/6/2017, 82 FR 46674

Section Submission of TR NOX 335-3-8- Ozone Season Group 2 .57 Allowance Transfers

6/9/2017 10/6/2017, 82 FR 46674

Section Recordation of TR NOX 335-3-8- Ozone Season Group 2 .58 Allowance Transfers

6/9/2017 10/6/2017, 82 FR 46674

Section Compliance with TR

6/9/2017 10/6/2017, 30

335-3-8- NOX Ozone Season .59 Group 2 Emissions Limitation

82 FR 46674

Section Compliance with TR 335-3-8- NOX Ozone Season .60 Group 2 Assurance Provisions

6/9/2017 10/6/2017, 82 FR 46674

Section Banking 335-3-8.61

6/9/2017 10/6/2017, 82 FR 46674

Section TR NOX Ozone Season 335-3-8- Group 2 Trading .62 Program—Account Error

6/9/2017 10/6/2017, 82 FR 46674

Section TR NOX Ozone Season 335-3-8- Group 2 Trading .63 Program— Administrator's Action on Submissions

6/9/2017 10/6/2017, 82 FR 46674

Section General Monitoring, 335-3-8- Recordkeeping, and .65 Reporting Requirements

6/9/2017 10/6/2017, 82 FR 46674

Section Initial Monitoring 335-3-8- System Certification and .66 Recertification Procedures

6/9/2017 10/6/2017, 82 FR 46674

Section Monitoring System Out335-3-8- of-Control Periods .67

6/9/2017 10/6/2017, 82 FR 46674

Section Notifications 335-3-8- Concerning Monitoring .68

6/9/2017 10/6/2017, 82 FR 46674

Section Recordkeeping and 335-3-8- Reporting .69

6/9/2017 10/6/2017, 82 FR 46674

Section Petitions for 335-3-8- Alternatives to .70 Monitoring,

6/9/2017 10/6/2017, 82 FR 46674

31

Recordkeeping, or Reporting Requirements Chapter No. 335-3-9 Control of Emissions from Motor Vehicles Section Visible Emission 335-3-9- Restriction for Motor .01 Vehicles

10/15/1996 6/6/1997; 62 FR 30991

Section Ignition System and 335-3-9- Engine Speed .02

8/10/2000 12/8/2000; 65 FR 76938

Section Crankcase Ventilation 335-3-9- Systems .03

8/10/2000 12/8/2000; 65 FR 76938

Section Exhaust Emission 335-3-9- Control Systems .04

6/22/1989 3/19/1990; 55 FR 10062

Section Evaporative Loss 335-3-9- Control Systems .05

6/22/1989 3/19/1990; 55 FR 10062

Section Other Prohibited Acts 335-3-9.06

8/10/2000 12/8/2000; 65 FR 76938

Section Effective Date 335-3-9.07

10/15/1996 6/6/1997; 62 FR 30991

Chapter No. 335-3-12 Continuous Monitoring Requirements for Existing Sources Section General 335-312-.01

6/22/1989 3/19/1990; 55 FR 10062

Section Emission Monitoring 335-3- and Reporting 12-.02 Requirements

2/17/1998 9/14/1998; 63 FR 49005

Section Monitoring System 335-3- Malfunction 12-.03

6/22/1989 3/19/1990; 55 FR 10062

Section Alternate Monitoring 335-3- and Reporting 12-.04 Requirements

6/22/1989 3/19/1990; 55 FR 10062 32

Section Exemptions and 335-3- Extensions 12-.05

6/22/1989 3/19/1990; 55 FR 10062

Chapter No. 335-3-13 Control of Fluoride Emissions Section General 335-313-.01

10/15/1996 6/6/1997; 62 FR 30991

Section Superphosphoric Acid 335-3- Plants 13-.02

10/15/1996 06/6/1997; 62 FR 30991

Section Diammonium Phosphate 10/15/1996 6/6/1997; 62 335-3- Plants FR 30991 13-.03 Section Triple Superphosphoric 335-3- Plants 13-.04

10/15/1996 6/6/1997; 62 FR 30991

Section Granular Triple 335-3- Superphosphoric 13-.05 Storage Facilities

10/15/1996 6/6/1997; 62 FR 30991

Section Wet Process Phosphoric 335-3- Acid Plants 13-.06

10/15/1996 6/6/1997; 62 FR 30991

Chapter No. 335-3-14 Air Permits Section General Provisions 335-314-.01

2/17/1998 9/14/1998; 63 FR 49005

Section Permit Procedures 335-314-.02

10/15/1996 6/6/1997; 62 FR 30991

Section Standards for Granting 335-3- Permits 14-.03

5/23/2011 9/26/2012; 77 FR 59100.

Section Air Permits Authorizing 11/25/20147 10/10/2017; 335-3- Construction in Clean 82 FR 14-.04 Air Areas (Prevention of 469214 Significant Deterioration (PSD)) 33

Section Air Permits Authorizing 335-3- Construction in or Near 14-.05 Nonattainment Areas

5/23/2011 1/11/2016; With the exception of: The portion 81 FR 1124 of 335-3-14-.05(1)(k) stating “excluding ethanol production facilities that produce ethanol by natural fermentation”; and 335-314-.05(2)(c)3 (addressing fugitive emission increases and decreases). Also with the exception of the state-withdrawn elements: 335-314-.05(1)(h) (the actual-to-potential test for projects that only involve existing emissions units); the last sentence at 335-3-14-.05(3)(g), stating “Interpollutant offsets shall be determined based upon the following ratios”; and the NNSR interpollutant ratios at 335-3-14.05(3)(g)1-4.

Chapter No. 335-3-15 Synthetic Minor Operating Permits Section Definitions 335-315-.01 Section General Provisions 335-315-.02

10/15/1996 6/6/1997; 62 FR 30991 8/10/2000 12/8/2000; 65 FR 76938

Section Applicability 335-315-.03

11/23/1993 10/20/1994; 59 FR 52916

Section Synthetic Minor 335-3- Operating Permit 15-.04 Requirements

10/15/1996 6/6/1997; 62 FR 30991

Section Public Participation 335-315-.05

10/15/1996 6/6/1997; 62 FR 30991

Chapter No. 335-3-17 Conformity of Federal Actions to State Implementation Plans Section Transportation 335-3- Conformity 17.01

5/28/2013 10/12/2017; 82 FR 47383

Section General Conformity

5/23/2011 9/26/2012; 34

335-317-.02

77 FR 59100

(d) EPA approved Alabama source specific requirements. EPA APPROVED ALABAMA SOURCE-SPECIFIC REQUIREMENTS

Name of source

Permit No.

State effective date

EPA approval date

Explanation

Lafarge Cement AB70004_1_01 Kiln

2/6/2008 7/30/2009; 74 FR 37945

Certain provisions of the permit.

Lehigh Cement Kiln *****

2/6/2008 7/30/2009, 74 FR 37945

Certain provisions of the permit.

4-07-0290-03

[FR Doc. 2018-06367 Filed: 3/29/2018 8:45 am; Publication Date: 3/30/2018]

35