AMBERLEY WATER SUPPLY STRATEGY Lead Designer – Stuart Sandy, AECOM Presented by – Bryn Larsen, AECOM

MARCH 26, 2014

AMBERLEY WATER STRATEGY

PROJECT OVERVIEW

PROJECT DRIVERS

- Already close to restrictions being imposed at peak times - Population growth and development - Decline in water quality with regard to Iron content - Over-reliance on the single source currently owned by Amberley – lack of supply resilience

AMBERLEY WATER STRATEGY

April 7, 2014

Page 3

WATER SOURCES RACECOURSE ROAD SOURCE

1956 – Reticulation network and Domain source established

AMBERLEY RESERVOIR

1966 – State Highway 1 source established

AMBERLEY TOWNSHIP

AMBERLEY DOMAIN SOURCE (ABANDONED) AMBERLEY BEACH

KOWAI RIVER ROAD SOURCE

STATE HIGHWAY 1 SOURCE

1972 – SH1 becomes primary source for Amberley

2009 - Domain source abandoned due to deepening of Kowai River bed

LEITHFIELD

Other current & potential sources

MAYS WELL SOURCE

LEITHFIELD BEACH SOURCE

Presentation Title

4/7/2014

Page 4

FORECAST WATER DEMAND (AMBERLEY)

AMBERLEY WATER STRATEGY

April 7, 2014

Page 5

WATER AVAILABLE

AMBERLEY WATER STRATEGY

April 7, 2014

Page 6

AMBERLEY WATER STRATEGY

PROPOSED OPTIONS

OPTION 1

BACKUP SUPPLY FROM RACECOURSE ROAD SOURCE MAX. 5.5 L/S

AMBERLEY RESERVOIR CLUSTER

CAPACITY 720 M 3

Do Nothing AMBERLEY TOWNSHIP DEMAND

Approximate cost of network investment - $0

-

Ongoing operation and maintenance costs

-

Lack of investment in the network will result in a failure to meet present and future needs as a statutory authority

17.8 L/S

EXISTING 150mm PVC RETICULATION AMBERLEY BEACH DEMAND 2.4 L/S

KOWAI RIVER ROAD SOURCE CURRENT 5.3 L/S CONSENT 15 L/S

NORTHERN ASHLEY RURAL WATER

STATE HIGHWAY 1 SOURCE CURRENT 13.8 L/S CONSENT 20 L/S LEITHFIELD TOWNSHIP

MAYS WELL SOURCE

LEITHFIELD BEACH DEMAND

4.5 L/S

April 7, 2014

Page 8

LEITHFIELD BEACH SOURCE CURRENT 9 L/S CONSENT 30 L/S

OPTION 2

AMBERLEY RESERVOIR CLUSTER

CAPACITY 720 M 3

Supply from Leithfield Beach, SH1 and Kowai including storage

-

3600m of new 200mm water main

-

Water mixing facility

-

New pumps at Leithfield Beach and upgrade at Kowai

-

New 5000m3 reservoir on Domain site

-

Purchase of the Kowai bore and 150mm PVC reticulation

AMBERLEY TOWNSHIP DEMAND

17.8 L/S M3

NEW 5000 RESERVOIR ON DOMAIN SITE

Approximate cost $3.57M + Kowai assets

EXISTING 150mm PVC RETICULATION AMBERLEY BEACH DEMAND 2.4 L/S

NEW WATER MIXING FACILITY & PUMPING STATION AT KOWAI RIVER ROAD

KOWAI RIVER ROAD SOURCE PROPOSED 5.3 L/S

NORTHERN ASHLEY RURAL WATER

STATE HIGHWAY 1 SOURCE PROPOSED 13.8 L/S LEITHFIELD TOWNSHIP

MAYS WELL SOURCE

LEITHFIELD BEACH DEMAND

4.5 L/S

4/7/2014

Page 9

LEITHFIELD BEACH SOURCE PROPOSED 21 L/S CONSENT 30 L/S

OPTION 3

BACKUP SUPPLY FROM RACECOURSE ROAD SOURCE MAX. 5.5 L/S

Increased supply from SH1 and Kowai including treatment

AMBERLEY RESERVOIR CLUSTER CAPACITY 720 M 3

-

600m of new 150mm water main at Kowai River Road

-

Purchase of the Kowai bore and 150mm PVC reticulation

-

New treatment facility at Kowai River

-

Pump upgrade at Kowai River

AMBERLEY TOWNSHIP DEMAND

17.8 L/S

Approximate cost $800k + cost of Kowai assets

EXISTING 150mm PVC RETICULATION AMBERLEY BEACH DEMAND 2.4 L/S

NEW TREATMENT FACILITY & PUMPING STATION AT KOWAI RIVER ROAD

KOWAI RIVER ROAD SOURCE CURRENT 5.3 L/S PROPOSED 15 L/S

NORTHERN ASHLEY RURAL WATER

STATE HIGHWAY 1 SOURCE CURRENT 13.8 L/S PROPOSED 20 L/S

LEITHFIELD TOWNSHIP

LEITHFIELD BEACH SOURCE MAYS WELL SOURCE

4/7/2014

CURRENT 9 L/S CONSENT 30 L/S

Page 10

AMBERLEY RESERVOIR CLUSTER

BACKUP SUPPLY FROM RACECOURSE ROAD SOURCE MAX. 5.5 L/S

OPTION 4 Increased supply from SH1 and Kowai including treatment – Leithfield Beach supply for Ashley

-

New treatment facility at Kowai River Road

-

New 200mm main from Kowai site to new connection on SH1 150mm main.

-

New 2000m x 200mm from Leithfield Beach to Leithfield Township

-

New 800m x 150mm Old Main North Rd

-

New 500m x 150mm Mays Rd

CAPACITY 720 M 3

AMBERLEY TOWNSHIP DEMAND

17.8 L/S

EXISTING 150mm PVC RETICULATION AMBERLEY BEACH DEMAND 2.4 L/S

Approximate cost $1.2M

NEW TREATMENT FACILITY & PUMPING STATION AT KOWAI RIVER ROAD

KOWAI RIVER ROAD SOURCE CURRENT 5.3 L/S PROPOSED 15 L/S

NORTHERN ASHLEY RURAL WATER

STATE HIGHWAY 1 SOURCE CURRENT 13.8 L/S PROPOSED 20 L/S

LEITHFIELD TOWNSHIP

LEITHFIELD BEACH SOURCE MAYS WELL SOURCE

CURRENT 9 L/S PROPOSED 24 L/S CONSENT 30 L/S

NEW 200mm WATER MAIN PROVIDING 15 L/S TO ASHLEY WATER SCHEME

SOURCE

4/7/2014

Page 11

CONCLUSIONS

OPTION 4 GIVES

• SECURITY OF SUPPLY/ NETWORK RESILIENCE • INCREASE IN WATER QUALITY

• CAPACITY FOR GROWTH • BENEFITS BOTH ARWS AND AMBERLEY NETWORKS

Presentation Title

4/7/2014

Page 12

Risks Operational Lack of above ground storage. Political Ongoing negotiation between Amberley and Ashley water systems could prevent any of the options proceeding (i.e. risk of doing nothing)

Presentation Title

4/7/2014

Page 13

Lessons learned

- Best engineering solution not always best for situation - Water schemes managed by committees - Differences in system and operation - UK predominately fed by gravity systems

- Question Is a committee led water scheme the best form of management, and if so how could this be improved?

Presentation Title

4/7/2014

Page 14

Thank You

QUESTIONS ?

[email protected]