apollo house AWS

Report 6 Downloads 51 Views
APOLLO HOUSE 3,000 – 9,500 sq ft* GRADE A OFFICES Whitehills Business Park

Y

t n

1 r e Ar E

e

HIGH SPECIFICATION

EXCELLENT PARKING

*

r

*

p

£10 sq ft

PROMINENT LOCATION

APOLLO HOUSE, HALLAM WAY, WHITEHILLS BUSINESS PARK, BLACKPOOL FY4 5FS * See reverse for exact sizes **Whole building, subject to final terms and contract

LOCATION Situated in the geographic centre of the Fylde Coast, just 1/4 mile from Junction 4 of the M55, Apollo House is located on the prestigious Whitehills Business Park, Blackpool. The building is in a commanding and prominent position on the main thoroughfare through the business park, and clearly visible from the main arterial routes. Nearby occupiers include B&Q, NST, legal and professional practices, stockbrokers Hargreave Hale and James Brearley & Sons, Premier Inn and a number of car showrooms including BMW/Mini. Due to the proximity to J4 of the M55, Apollo House offers arguably the best business location in Fylde. F

A

B 4

B

A

C

A

B

B

1090

3590

1090

3590

A

1810

3590

B

1360

2690

64 0

RWP

68 5

1590

51 65

910

910 910 2015 680 330 1115 2710 1115 1565 2710 890

22 60

1585

60

Up

22

1585 890

665

60

56 0

2710

F-D7

5

& BUSINESS UNITS DEVELOPMENT AT This drawing is copyright.OFFICES No unauthorised copying of drawing Project HALLAM WAY, WHITEHILLS BUSINESS PARK without the express permission of the architect. Brew Shower 135° 60

Drawing SMALL OFFICE FLOOR LEASE PLANS Do not scale 63from prints. Use figure dimensions only. 5

RWP 1535

2710

This drawing is to be read in conjunction with all relevant Drg. No. 14-08-730 This drawing is copyright. No unauthorised copying of and drawing consultants' and / or specialists' drawings / documents any without the express permission ofbe thenotified architect. discrepancies or variations are to to the architect before affected A1 Drg. work Size commences. This drawing is to be read in conjunction with all relevant Do not scale from prints. Use figure dimensions only. consultants' and / or specialists' drawings / documents and any REV. AMENDMENTS DATE Date AUGUST 2016 discrepancies or variations are to be notified to the architect Contractors to check all dimensions on site prior to before affected work commences. commencement of works. AMENDMENTS

DATE

1585 665 890

1 2

BFD 30

SMALL OFFICE FLOOR LEASE PLANS

Client

F-D4

FD 30 SS

Male

M&E plant, doors to be kept locked accept for access

HENCO INTERNATIONAL LTDPlant NP

1 RWP

10800

15710

All works to be carried out in accordance with current statutory Health and Safety Regulations.

REV.

F-D5

OFFICES & BUSINESS AT SSUNITS DEVELOPMENT Cl. HALLAM WAY, WHITEHILLS Female F-D3 BUSINESS PARK Vertical riser for

Drawing

Dwn. By

665

ContractorsClient to check all dimensions on site prior to LTD HENCO INTERNATIONAL commencement of works. A Dwn. By NP All works to be carried out in accordance with current statutory Health and Safety Regulations. Scale 1:100 NOTES

FIRST FLOOR LAYOUT

Contractors to check all dimensions on site prior to commencement of works.

F-D6

Vertical riser for M&E plant, doors to be kept locked accept for access

RWP

Project

Disabled

22

Do not scale from prints. Use figure dimensions only.

Brew

F-D2

1

Cl. F-D4 FD 30 SS Plant

15710

RWP

B

66

5

This drawing is copyright. No unauthorised copying of drawing without the express permission of the architect.

B

OFFICES & BUSINESS UNITS DEVELOPMENT AT

Project HALLAM PARK - 2,981ft² Ground floorWAY, netWHITEHILLS area: BUSINESS 277m² NOTES Drawing SMALL OFFICE FLOOR LEASE PLANS First floor net area: 279m² - 3,003ft² This drawing is copyright. No unauthorised copying of drawing without the express permission of the architect. Ground floor net area: 277m² -Second 2,981ft² Client HENCO floorINTERNATIONAL net area:LTD 279m² - 3,003ft² Do not scale from prints. figure dimensions First floorUsenet area: only. 279m² -2nd 3,003ft² floor 36.4m² - 391ft² Dwn. By NP mezzanine: Contractors to check all dimensions on site area: prior to Second floor net 279m² - 3,003ft² Scale 1:100 commencement of works. 2nd floor mezzanine: 36.4m² -Total 391ft² net area: 871m² - 9,379ft² All works to be carried out in accordance with current statutory Drg. No. 14-08-730 Health and Safety Regulations. Ground floor net area: 277m² - 2,981ft² Plan @ 1:100 A1 Drg. Size This drawing is to benet read inarea: conjunction with all relevant Total 871m² -First 9,379ft² floor net area: 279m² - 3,003ft² consultants' and / or specialists' drawings / documents and any Date discrepancies or variations are to be notified to the architect SecondAUGUST floor2016 net area: 279m² - 3,003ft² before affected work commences. 2nd floor mezzanine:Tel: 01706218170 36.4m² - 391ft² REV. AMENDMENTS DATE

F-D8

10800 15710

NOTES

SS Female F-D3

Male

10800

Plant

665

A

FD 30 SS

665

A

FIRST FLOOR LAYOUT

RWP 1535

NOTES

RWP

15710

2710

60

1

Shower

Male

FD 30

F-D5

F-D6

Vertical riser for Shower M&E plant, doors to be kept locked accept for access

2035 4725

2

Disabled

22

4725

5

12

5

FIRST FLOOR LAYOUT

Plant

10800

135°

63

Brew

66

Vertical riser for M&E plant, doors to be kept locked accept for access

RWP 1535

2

665

2035

F-D7

Cl. Brew F-D4

3

4725

0 89

1585

90°

665

F-D8 Brew

FD 30 SS Female F-D3

F-D5

Disabled Brew Refuge

17765

2035

FD 30 SS&SC F-D1 F-D2

FIRST FLOOR LAYOUT Net Area: 3,003 sq ft (279 sq m)

2035

60

890

1600

890

22

60

Cl. F-D4 FD 30 SS

17765

1565 1585

Disabled Refuge

1800

1585

22 5

2605

Lift

890

890

FD 30 SS&SC F-D1

3

5

22

Shower

A

B

F-D6 Disabled 135° 5

FD 30 SS Female F-D3

3

12 56 0

66 5

90°

66

Disabled Refuge

66

5

F-D7

63

Male

4

1585

1565

1800

22 60 89 0

22 60

90°

RWP

Up 1800

22 60 66 5

22 60 66 5

1600

FD 30 SS&SC F-D1

60

F-D5

F-D6

O/a Cavity wall thickness

1565 2605

Up

22

brick face setting out 300mm off grid

2710

1600

F-D8

66

brick face setting out 300mm off grid

1340

330

1810

0

2035 4725

1560 2015 910

5000 665

Lift

66 5

2710 1565

0

890

1135

RWP

56

665

1565 680

2015 680 330

1790

5

F-D7

665

330mm O/a Cavity wall thickness

4

1115

22 60

2710

1135

60

4725

5000

2500 2500 66 5 22 60

12 56 0

66 5

665

F-D2

2

Brew

F-D2

Brew

1

1800

1565

5000 63 5

22 60 66 5 22 60 12 56 0

66 5

1810

RWP

Notional escape corridor to be kept clear at all times

890

1585 665

17765

Disabled Refuge

17765

FD 30 SS&SC F-D1

1 2

330mm O/a Cavity wall thickness F-D8 brick face setting out 300mm off grid

2710

O/a Cavity wall thickness

1565

F

66

665

910

2500 51 65

2500 88 0

5000

2015 680

330 1115

1085

Notional escape corridor to be kept clear at all times

89

1585

890

1585

3

2035

890

3 2

brick face setting out 300mm off grid

2710

E

135°

22

63

890 RWP

F

1340

A

D

C

Notional escape corridor to be kept clear at all times

60

RWP 1535

910

1590 1565

68 5

88 0

910 1565 910

gla zin g

fire n 30 mi 11 85

90 0

site

on

C

TB

1800

Up

1600

22

brick face setting out 300mm off grid

1810

RWP

RWP

Brickwork Dimensions

12

4725

2605

Lift

1800

60 22

890 0 89

2035 90°

90°

1560

68 5 51 65

1590

5000

36 20

gla zin g

res ista nt

1560

88 0

1800

fire n 30 mi

90 0

site

on

res ista nt

TB

C

36 20

5000

site

on

C

TB

brick face seeting out 300mm off grid

1585 2710 890

5 66

17765

1585

1565 1585

22 60

890

60 22

brick face seeting out 300mm off grid

1115 2710

1115 1565

22 60 66 5

22 60 66 5

12 56 0

1585

1800

90°

5 66

d

gri off

m

0m t 49 g

60 22

ttin se e fac ck

3

bri 0 89

E 665

O/a Cavity wall thickness

4 - 3,003ft² First floor net area: 279m²

60

17765

1135

F

RWP

1565

22

890

1790

5

2035

4

5

60

22

60

22

and Roof

1135

2710

15710

0

665

B

66

5

66

5

66

135°

5

DESCRIPTION

665

1340

Lift

Disabled

63

9000

FIRST FLOOR LAYOUT

Ground floor net area: 277m² - 2,981ft² First floor net area: 279m² - 3,003ft² Small Office Ground, First, Second Floor Plans Second floor net area: 279m² - 3,003ft² 2nd floor mezzanine: 36.4m²and - 391ft² First, Second Floor Plans Roof Plan @ 1:100

A

60

RWP

Plant

15710

GROUND FLOOR LAYOUT

135°

2605

B

FD 30 G-D3 SS Cl.

Shower

665

A

135°

22

60

22

60

2710

RWP

4

0

56

5

22

Female

890

Male

NOTE: Special bricks required, see detail drawing

1810

E

RWP

1810

0

5

12

66

63

0

56

G-D2

1

G-D6 G-D5 G-D4 330mm O/a Cavity wall thickness Disabled

A

D

15710 1085

665

56

60

5

12

66

RWP 1535

O/a Cavity wall thickness

1565

5

60

22

22

60

135°

2710

12

5

22

5

63

1

F

1340

66

5

66

66

5

60

GROUND FLOOR LAYOUT 330mm O/a Cavity wall thickness

brick face setting out 300mm off grid

1135

RWP

89

60

60

66

d

gri

15710

Brew

910

brick face setting out 300mm off grid

Brew

RWP

B

Second area: 279m² - 3,003ft² First floorfloor net net area: 279m² - 3,003ft²

60

22

22

off

22

890 RWP

B

RWP

22

0

m

5

G-D7 910

9000

15710

A

1790

1 2

Plant

RWP

685

5

56

0m

t 49

66

A

665

Plant

9000

Male Shower

2690

66

0

89

5

12

66

ou

60

2710

1135

Net Area: 3,003 sq ft (279 sq m)

1 RWP 1540

60

60

g

60

ttin

22

se

22

Shower

GROUND FLOOR LAYOUT

665

SECOND FLOOR LAYOUT

Cl. FD 30 SS S-D4

22

22

e

0

665

Brew

SS S-D3

Female

66

5

66

d

gri

ou

off

fac

56

4725

11 85

5000

36 20

gla zin g

res ista nt fire n 30 mi

2500

11 85

90 0

2500

2710

63 5

1115

brick face seeting out 300mm off grid

1565

1800

60 22 5 66 22 60 56 0 66

5

12

89 0

890

m

ck

bri

5

12

66

2710

FD 30 G-D3 SS Cl.

Male

3 2

BFD 30

S-D5

S-D6

15710 1810

60

0m

0

60

Male

RWP 1535

Female

G-D4

Shower

1

A

A Brickwork Dimensions D 1085

22

t 49

89

22

NOTE: Special bricks required, see detail drawing

2 G-D5

4

3

RWP Brew

S-D2 S-D7

RWP

B

First floor netB area: 279m² - C3,003ft²

C

Plant

Plant

A

0

ou

5

66

d

gri

G-D4 135°

Male

RWP

685

S-D8

89

g

60

ttin

22

se

off

Brew

Disabled

Female Brew FD 30 G-D3 SS Cl. NOTE: Special bricks required, see detail drawing Plant

G-D5 Disabled

1810

17765

60 22

5 66 22 60

56 0

5

12

66

60 22 5 66 d gri off m ou t 49 0m 60 22

se ttin g fac e ck bri

off m ou t 49 0m

1565

60 22

se ttin g e fac ck bri 0 89

1585

90°

e

m

G-D6

G-D7 Brew

G-D2 G-D6

G-D7

B Brickwork Dimensions

E 665

Notional escape corridor to be kept clear at all times

FD 30 SS&SC G-D1 G-D2

Notional escape corridor to be kept clear at all times

2690

Disabled Brew Refuge FD 30 SS Cl. S-D3 FD 30 Female SS S-D4

S-D5

S-D6

Second floor net area: 279m² - 3,003ft² Disabled

SECOND FLOOR LAYOUT

Net Area: 2,981 sq ft (277 sq m) 1600

Male

RWP 1540

Shower

Second floor net area: 279m² - 3,003ft²

SECOND FLOOR LAYOUT 1

0

Up

Lift

0m

t 49

1585

FD 30 SS&SC G-D1

to

2

Shower

RWP

GROUND FLOOR LAYOUT

3

d

lkh

Bu

A

89

FD 30 SS&SC G-D1

2500

68 5 51 65 88 0

5000

36 20

gla zin g

res ista nt fire n 30 mi 11 85 90 0

site on C TB

60 22 5 66 22 60 56 0 5

12

66

60 22

2710

1115

brick face seeting out 300mm off grid

5 66 d gri

1600

Notional escape corridor to be kept clear at all times

Cl. Brew FD 30 SS S-D4

Female

RWP

685

0 64

RWP

2690

S-D7

Disabled

FD 30 SS S-D3

S-D5

SECOND FLOOR LAYOUT

B

RWP

330mm O/a Cavity wall thickness

1565

135°

Up

ea

0 64

2710

Lift

1600

fac

ou

brick face setting out 300mm off grid

g ilin ce

1340

d de en sp su

1810

ce

su

65 51

665

RWP

65 51

1135

RWP 1540

15710 1135

Brew

5 68

1790

Up

5 68

1135

0

665

NOTE: Special bricks required, see detail drawing

A

1790

d

S-D6 Disabled

ilin

de

A

D

S-D8 Brew

Bulkhead to suspended ceiling

S-D7 g

A

1135

Disabled Refuge

FD 30 SS&SC S-D1S-D2

Notional escape corridor to be kept clear at all times

S-D8

Stairs from Ground to Mezzanine Floor to fabricated from steel

4

1810setting out 300mm 665off grid brick face

RWP

ce

en

FDplate, 30minimum 850mm between handrails, rise to be 175mm, going to be 250mm min, max. pitch 35 deg, min. headroom 2.0m, handrail to be min. 900mm above pitch line, balustrade to SSbe Cl. min., 1100mm above finished floor, balustrade to withstand S-D3 horizontal force of 0.36KN/ln.m. in compliance with Bs 6399 part FD 30 one 1996. Handrail to be a contrasting colour, min. 50mm diameter and must protrude 300mm beyond both the top and SS Total rise of stair 2800mm TBC on site. the bottom nosing. S-D4

RWP

685

d

su

88

1810

RWP

135°

F

1085

to

sp

330mm O/a Cavity wall thickness

C

d

lkh

Bu

S-D2 65

First floor net area: 279m² - 3,003ft²

E Brickwork Dimensions

to

0

1085

5

63

ce

brick face setting out 300mm off grid

1565

B

15710

d

su

0 64

2710

RWP

A

to

65 51

F

1340

5 68

1810

330mm O/a Cavity wall thickness

d ea lkh Bu

88

0 90

665

brick face setting out 300mm off grid

RWP

A

B

Scale

1:100

Drg. No. Project

OFFICES & BUSINESS UNITS DEVELOPMENT AT 14-08-730 HALLAM WAY, WHITEHILLS BUSINESS PARK

Drg. Size Drawing

A1 SMALL OFFICE FLOOR LEASE PLANS

Date Client

AUGUST 2016 HENCO INTERNATIONAL LTD

Dwn. By

NP

Scale

1:100

Tel: 01706218170

Peel Partnership All works to be carried out in accordance with current statutory Drg.Design No. 14-08-730 Ltd Email: mail@peeldesigns .co.uk Hilpsford New Barn Lane Health and Safety Regulations. Web: www.peeldesigns.co.uk

B

Tel: 01706218170 Email: mail@peeldesigns .co.uk Web: www.peeldesigns.co.uk RIBA Chartered Practice 20001293

Rawtenstall

Lancashire

BB4 6HT

Offering Grade A, new build office accommodation, Apollo House provides unrivalled business space in terms of bothSmall location and Office Ground, First, Secondspecification. Floor Plans and Roof Plan @ 1:100

Small Office Ground,

@ 1:100

70

E

1135

F

RWP

1565

D

ck

g

60

ttin

22

se

890 RWP

g zin gla

1790

C

bri

e

fac

910

RWP 1535

nt ista res

1135

4 Ground floor net area: 277m² - 2,981ft²

Brew 135°

fire

A

D 665

NOTE: Special bricks 1340 2710 required, see detail drawing

135°

Lift

0

ck

bri

Plant

n

B

89

0

FD 30 G-D3 SS Cl.

mi 30

1810

E

RWP

1810

de

en

sp

2

Plant

FD 30 SS&SC S-D1 Lift

1000 1600

ilin

Bulkhead to suspended ceiling

ea

g

ilin

de

d

SECOND FLOOR MEZZANINE

15710 1085

5

63

665

Notional escape corridor to be kept clear at all times

2

Brew

0

1135

Brickwork Dimensions

3

88

Up

25 13

0 64

A

4

2690

Disabled Refuge

en

sp

ea

lkh

51

1 Second floor mezzanine A net area: 36.4 m² - 391ft² Second floor net area: 279m² - 3,003ft²

RWP 1540

Bulkhead to suspended ceiling Bulkhead to suspended ceiling

65

Bulkhead to suspended ceiling

Male

3

Notional escape corridor to be kept clear at all times FD 30 SS&SC S-D1

Notional escape corridor to be kept clear at all times

51

Bu

Female

Disabled

65 51

1790

NOTE: Special bricks required, see detail drawing

135°

0 90

25 13

5 68

1135

51 65

51 65

2690

g ilin ce

70

0

330mm O/a Cavity wall thickness

RWP

665

RWP

89

male

brick face setting out 300mm off grid

1565

25 13

88

F 2710

1810

RWP

5

65

Brew

Shower

Ground floor net area: 277m² - 2,981ft²

15710

63

18

SECOND FLOOR MEZZANINE

SECOND FLOOR MEZZANINE

SECOND FLOOR LAYOUT A B

A Brickwork Dimensions D 1085

S-D8

Brew

Ground floorBnet area: 277m² C - 2,981ft²

A C

1600

g

51

Stairs from Ground to Mezzanine Floor to fabricated from steel plate, minimum 850mm between handrails, rise to be 175mm, going to be 250mm min, max. pitch 35 deg, min. headroom 2.0m, handrail to be min. 900mm above pitch line, balustrade to be min., 1100mm above finished floor, balustrade to withstand horizontal force of 0.36KN/ln.m. in compliance with Bs 6399 part one 1996. Handrail to be a contrasting colour, min. 50mm diameter and must protrude 300mm beyond both the top and the bottom nosing. Total rise of stair 2800mm TBC on site.

FD 30 SS&SC S-D9

S-D2 Second floor mezzanine net area: m²S-D5 - 391ft² S-D7 36.4 S-D6

1 2

Second floor mezzanine B net area: 36.4 m² - 391ft²

1

A

net area: 36.4 m² - 391ft²

B

Disabled Refuge

0

su

lkh

Bu

B

SECOND FLOOR MEZZANINE ROOF PLAN

Brickwork Dimensions

g zin gla

0 90

ce

20

0

18

Timber Joists fixed within the web of the steel, covered with 38mm thick Flooring grade T&G chipboard. floor construction is to be under drawn with "fireline" plasterbaord and skim all to achieve 1 fire resistance.

3

Bulkhead to suspended ceiling

12

70

25 13

d

de

en

PLAN Second floor mezzanine

A

nt ista res

0 90

20

g zin gla

12

nt ista res

FD 30 SS&SC S-D9 Office-Meeting Room

sp

A

1555

Lift

g ilin ce

d de en sp su

fire

70

fire

g

1ROOF

Bulkhead to suspended ceiling

0

18

Bulkhead to suspended ceiling Stairs from Ground to Mezzanine Floor to fabricated from steel plate, minimum 850mm between handrails, rise to be 175mm, going to be 250mm min, max. pitch 35 deg, min. headroom 2.0m, handrail to be min. 900mm above pitch line, balustrade to be min., 1100mm above finished floor, balustrade to withstand horizontal force of 0.36KN/ln.m. in compliance with Bs 6399 part one 1996. Handrail to be a contrasting colour, min. 50mm diameter and must protrude 300mm beyond both the top and the bottom nosing. Total rise of stair 2800mm TBC on site.

65

ROOF PLAN

2690

d de en sp su

to

n

20

g zin gla

12

n

3

to

2690

to

d ea lkh Bu

mi 30

nt ista res

1600

2

ilin

B

20

fire

g ilin ce

Lift

FD 30 FD 30 SS&SC floor construction: Steel supporting SS&SC S-D9 Notional escape corridor to be kept clear atMezzanine all ontimes beams steel columns with Engineered Bulkhead to suspended ceiling S-D1

d ea

F

1360

1000

n

d de en sp su

Mezzanine floor construction: Steel supporting beams on steel columns with Engineered Timber Joists fixed within the web of the steel, covered with 38mm thick Flooring grade T&G chipboard. floor construction is to be under drawn with "fireline" plasterbaord and skim all to achieve 1 fire resistance. 1000

Net Area: 391 sq ft (36.4 sq m)

Bulkhead to suspended ceiling

E 3590

RWP

Bulkhead to suspended ceiling

to

Bulkhead to suspended ceiling

51

Stairs from Ground to Mezzanine Floor to fabricated from steel plate, minimum 850mm between handrails, rise to be 175mm, going to be 250mm min, max. pitch 35 deg, min. headroom 2.0m, handrail to be min. 900mm above pitch line, balustrade to be min., 1100mm above finished floor, balustrade to withstand horizontal force of 0.36KN/ln.m. in compliance with Bs 6399 part one 1996. Handrail to be a contrasting colour, min. 50mm diameter and must protrude 300mm beyond both the top and the bottom nosing. Total rise of stair 2800mm TBC on site.

1810

Thermally broken PPC Aluminium window frames with matching insulated infill panels where indicated. dimensions are indicative and site measurements are required prior to any fabrication. Bulkhead to suspended ceiling Lift 1600

mi 30

d ea lkh Bu

Office-Meeting Room

Mezzanine floor construction: Steel supporting beams on steel columns with Engineered Timber Joists fixed within the web of the steel, covered with 38mm thick Flooring grade T&G chipboard. floor construction is to be under drawn with "fireline" plasterbaord and skim all to achieve 1 fire resistance.

2

2

3590

RWP

1000

SECOND FLOOR MEZZANINE

0

18

FD 30 SS&SC S-D9

12

Office-Meeting Room

Bulkhead to suspended ceiling

3

mi 30

Mezzanine floor construction: Steel supporting beams on steel columns with Engineered Timber Joists fixed within the web of the steel, covered with 38mm thick Flooring grade T&G chipboard. floor construction is to be under drawn with "fireline" plasterbaord and skim all to achieve 1 fire resistance.

A

D

C 1090

d ea lkh Bu

1105

4

Bulkhead to suspended ceiling

3

1105

Thermally broken PPC Aluminium window frames with matching insulated infill panels where indicated. A Bdimensions are indicative and site measurements are required prior to any fabrication.

4

Thermally broken PPC Aluminium window frames with matching insulated infill panels where indicated. dimensions are indicative and site measurements are required prior to any fabrication.

3

4

Thermally broken PPC Aluminium window frames with matching insulated infill panels where indicated. dimensions are indicative 4 and site measurements are required prior to any fabrication.

51 65

C

1555

RWP

Bulkhead to suspended ceiling

RWP

1105 1590

3590

F

4

Office-Meeting Room

1555

2690

1090

2690

910

F

F

1360

1800

E

3590

1555

64 0

D

C

E

63 5

B

A

D

C

22 60

A

B

2690

RWP

63 5

A A

C

E

1810

F

1360

64 0

B

51 65

4 A

3590

E

RWP

1810

RWP

F

A

D

C

A

D

C

1105

C

2690

A

1560

E

F

17765

E

4725

A

D

C

A

D

1800

B

C

2500

B

64 0

A

A

Total net area:

871m² - 9,379ft²

Total net area: Peel Design Partnership Ltd Hilpsford

New Barn Lane

Email: mail@peeldesigns .co.uk Web: www.peeldesigns.co.uk RIBA Chartered Practice 20001293

Rawtenstall

871m² - 9,379ft² Lancashire

RIBA Chartered Practice 20001293 Drg. Size

This drawing is Design to be read in conjunction Peel Partnership Ltd with all relevant consultants' and / or specialists' drawings / documents and any Hilpsford New Barn Lane Rawtenstall discrepancies or variations are to be notified to the architect before affected work commences.

REV.

AMENDMENTS

BB4 6HT

A1

Lancashire DateBB4 6HT AUGUST 2016

DATE

Peel Design Partnership Ltd Hilpsford New Barn Lane

Tel: 01706218170 Email: mail@peeldesigns .co.uk Web: www.peeldesigns.co.uk RIBA Chartered Practice 20001293

Rawtenstall

Lancashire

BB4 6HT

The three-storey building is available as a whole, comprising a net internal area of 9,379 sq ft (871.3 sq m) or per floor with self-contained suites from 2,981 sq ft (277 sq m) • Fully air-conditioned via ducted VRF system for heating & cooling

• Tiled toilet facilities and showers independent to each floor

• Raised access flooring for flexibility in data and power supply to desks

• Feature mezzanine “green room” on 2nd floor with vaulted ceiling & high level views over the estate

• Full LED lighting with daylight dimming and presence detection

• 24-hour access

• Up to 50 car spaces available on a secure, self-contained car park (parking ratio 1:190 sq ft) • Fully DDA compliant with passenger lift • Full suite of billed warranties available

Terms Bespoke leasing packages are available to meet the needs of a prospective occupier. The developer is ‘hands-on’, based on Whitehills and always happy to meet with occupiers at an early stage on a no obligation basis to discuss requirements further. The developer will also consider a sale option.

Enquiries Developer

Joint Agents

MISREPRESENTATION ACT: All Agents and for the vendors or lessors of this property whose agents they are, give notice that (i) these particulars are produced in good faith, are set out as a general guide only and do not constitute any part of an offer or contract. They are believed to be correct but any intending purchasers or tenants should not rely on them as statements or representations of fact but must satisfy themselves as to the correctness of each of them. (ii) no person in the employment of all agents has any authority to make or give any representation or warranty in relation to this property.