APOLLO HOUSE 3,000 – 9,500 sq ft* GRADE A OFFICES Whitehills Business Park
Y
t n
1 r e Ar E
e
HIGH SPECIFICATION
EXCELLENT PARKING
*
r
*
p
£10 sq ft
PROMINENT LOCATION
APOLLO HOUSE, HALLAM WAY, WHITEHILLS BUSINESS PARK, BLACKPOOL FY4 5FS * See reverse for exact sizes **Whole building, subject to final terms and contract
LOCATION Situated in the geographic centre of the Fylde Coast, just 1/4 mile from Junction 4 of the M55, Apollo House is located on the prestigious Whitehills Business Park, Blackpool. The building is in a commanding and prominent position on the main thoroughfare through the business park, and clearly visible from the main arterial routes. Nearby occupiers include B&Q, NST, legal and professional practices, stockbrokers Hargreave Hale and James Brearley & Sons, Premier Inn and a number of car showrooms including BMW/Mini. Due to the proximity to J4 of the M55, Apollo House offers arguably the best business location in Fylde. F
A
B 4
B
A
C
A
B
B
1090
3590
1090
3590
A
1810
3590
B
1360
2690
64 0
RWP
68 5
1590
51 65
910
910 910 2015 680 330 1115 2710 1115 1565 2710 890
22 60
1585
60
Up
22
1585 890
665
60
56 0
2710
F-D7
5
& BUSINESS UNITS DEVELOPMENT AT This drawing is copyright.OFFICES No unauthorised copying of drawing Project HALLAM WAY, WHITEHILLS BUSINESS PARK without the express permission of the architect. Brew Shower 135° 60
Drawing SMALL OFFICE FLOOR LEASE PLANS Do not scale 63from prints. Use figure dimensions only. 5
RWP 1535
2710
This drawing is to be read in conjunction with all relevant Drg. No. 14-08-730 This drawing is copyright. No unauthorised copying of and drawing consultants' and / or specialists' drawings / documents any without the express permission ofbe thenotified architect. discrepancies or variations are to to the architect before affected A1 Drg. work Size commences. This drawing is to be read in conjunction with all relevant Do not scale from prints. Use figure dimensions only. consultants' and / or specialists' drawings / documents and any REV. AMENDMENTS DATE Date AUGUST 2016 discrepancies or variations are to be notified to the architect Contractors to check all dimensions on site prior to before affected work commences. commencement of works. AMENDMENTS
DATE
1585 665 890
1 2
BFD 30
SMALL OFFICE FLOOR LEASE PLANS
Client
F-D4
FD 30 SS
Male
M&E plant, doors to be kept locked accept for access
HENCO INTERNATIONAL LTDPlant NP
1 RWP
10800
15710
All works to be carried out in accordance with current statutory Health and Safety Regulations.
REV.
F-D5
OFFICES & BUSINESS AT SSUNITS DEVELOPMENT Cl. HALLAM WAY, WHITEHILLS Female F-D3 BUSINESS PARK Vertical riser for
Drawing
Dwn. By
665
ContractorsClient to check all dimensions on site prior to LTD HENCO INTERNATIONAL commencement of works. A Dwn. By NP All works to be carried out in accordance with current statutory Health and Safety Regulations. Scale 1:100 NOTES
FIRST FLOOR LAYOUT
Contractors to check all dimensions on site prior to commencement of works.
F-D6
Vertical riser for M&E plant, doors to be kept locked accept for access
RWP
Project
Disabled
22
Do not scale from prints. Use figure dimensions only.
Brew
F-D2
1
Cl. F-D4 FD 30 SS Plant
15710
RWP
B
66
5
This drawing is copyright. No unauthorised copying of drawing without the express permission of the architect.
B
OFFICES & BUSINESS UNITS DEVELOPMENT AT
Project HALLAM PARK - 2,981ft² Ground floorWAY, netWHITEHILLS area: BUSINESS 277m² NOTES Drawing SMALL OFFICE FLOOR LEASE PLANS First floor net area: 279m² - 3,003ft² This drawing is copyright. No unauthorised copying of drawing without the express permission of the architect. Ground floor net area: 277m² -Second 2,981ft² Client HENCO floorINTERNATIONAL net area:LTD 279m² - 3,003ft² Do not scale from prints. figure dimensions First floorUsenet area: only. 279m² -2nd 3,003ft² floor 36.4m² - 391ft² Dwn. By NP mezzanine: Contractors to check all dimensions on site area: prior to Second floor net 279m² - 3,003ft² Scale 1:100 commencement of works. 2nd floor mezzanine: 36.4m² -Total 391ft² net area: 871m² - 9,379ft² All works to be carried out in accordance with current statutory Drg. No. 14-08-730 Health and Safety Regulations. Ground floor net area: 277m² - 2,981ft² Plan @ 1:100 A1 Drg. Size This drawing is to benet read inarea: conjunction with all relevant Total 871m² -First 9,379ft² floor net area: 279m² - 3,003ft² consultants' and / or specialists' drawings / documents and any Date discrepancies or variations are to be notified to the architect SecondAUGUST floor2016 net area: 279m² - 3,003ft² before affected work commences. 2nd floor mezzanine:Tel: 01706218170 36.4m² - 391ft² REV. AMENDMENTS DATE
F-D8
10800 15710
NOTES
SS Female F-D3
Male
10800
Plant
665
A
FD 30 SS
665
A
FIRST FLOOR LAYOUT
RWP 1535
NOTES
RWP
15710
2710
60
1
Shower
Male
FD 30
F-D5
F-D6
Vertical riser for Shower M&E plant, doors to be kept locked accept for access
2035 4725
2
Disabled
22
4725
5
12
5
FIRST FLOOR LAYOUT
Plant
10800
135°
63
Brew
66
Vertical riser for M&E plant, doors to be kept locked accept for access
RWP 1535
2
665
2035
F-D7
Cl. Brew F-D4
3
4725
0 89
1585
90°
665
F-D8 Brew
FD 30 SS Female F-D3
F-D5
Disabled Brew Refuge
17765
2035
FD 30 SS&SC F-D1 F-D2
FIRST FLOOR LAYOUT Net Area: 3,003 sq ft (279 sq m)
2035
60
890
1600
890
22
60
Cl. F-D4 FD 30 SS
17765
1565 1585
Disabled Refuge
1800
1585
22 5
2605
Lift
890
890
FD 30 SS&SC F-D1
3
5
22
Shower
A
B
F-D6 Disabled 135° 5
FD 30 SS Female F-D3
3
12 56 0
66 5
90°
66
Disabled Refuge
66
5
F-D7
63
Male
4
1585
1565
1800
22 60 89 0
22 60
90°
RWP
Up 1800
22 60 66 5
22 60 66 5
1600
FD 30 SS&SC F-D1
60
F-D5
F-D6
O/a Cavity wall thickness
1565 2605
Up
22
brick face setting out 300mm off grid
2710
1600
F-D8
66
brick face setting out 300mm off grid
1340
330
1810
0
2035 4725
1560 2015 910
5000 665
Lift
66 5
2710 1565
0
890
1135
RWP
56
665
1565 680
2015 680 330
1790
5
F-D7
665
330mm O/a Cavity wall thickness
4
1115
22 60
2710
1135
60
4725
5000
2500 2500 66 5 22 60
12 56 0
66 5
665
F-D2
2
Brew
F-D2
Brew
1
1800
1565
5000 63 5
22 60 66 5 22 60 12 56 0
66 5
1810
RWP
Notional escape corridor to be kept clear at all times
890
1585 665
17765
Disabled Refuge
17765
FD 30 SS&SC F-D1
1 2
330mm O/a Cavity wall thickness F-D8 brick face setting out 300mm off grid
2710
O/a Cavity wall thickness
1565
F
66
665
910
2500 51 65
2500 88 0
5000
2015 680
330 1115
1085
Notional escape corridor to be kept clear at all times
89
1585
890
1585
3
2035
890
3 2
brick face setting out 300mm off grid
2710
E
135°
22
63
890 RWP
F
1340
A
D
C
Notional escape corridor to be kept clear at all times
60
RWP 1535
910
1590 1565
68 5
88 0
910 1565 910
gla zin g
fire n 30 mi 11 85
90 0
site
on
C
TB
1800
Up
1600
22
brick face setting out 300mm off grid
1810
RWP
RWP
Brickwork Dimensions
12
4725
2605
Lift
1800
60 22
890 0 89
2035 90°
90°
1560
68 5 51 65
1590
5000
36 20
gla zin g
res ista nt
1560
88 0
1800
fire n 30 mi
90 0
site
on
res ista nt
TB
C
36 20
5000
site
on
C
TB
brick face seeting out 300mm off grid
1585 2710 890
5 66
17765
1585
1565 1585
22 60
890
60 22
brick face seeting out 300mm off grid
1115 2710
1115 1565
22 60 66 5
22 60 66 5
12 56 0
1585
1800
90°
5 66
d
gri off
m
0m t 49 g
60 22
ttin se e fac ck
3
bri 0 89
E 665
O/a Cavity wall thickness
4 - 3,003ft² First floor net area: 279m²
60
17765
1135
F
RWP
1565
22
890
1790
5
2035
4
5
60
22
60
22
and Roof
1135
2710
15710
0
665
B
66
5
66
5
66
135°
5
DESCRIPTION
665
1340
Lift
Disabled
63
9000
FIRST FLOOR LAYOUT
Ground floor net area: 277m² - 2,981ft² First floor net area: 279m² - 3,003ft² Small Office Ground, First, Second Floor Plans Second floor net area: 279m² - 3,003ft² 2nd floor mezzanine: 36.4m²and - 391ft² First, Second Floor Plans Roof Plan @ 1:100
A
60
RWP
Plant
15710
GROUND FLOOR LAYOUT
135°
2605
B
FD 30 G-D3 SS Cl.
Shower
665
A
135°
22
60
22
60
2710
RWP
4
0
56
5
22
Female
890
Male
NOTE: Special bricks required, see detail drawing
1810
E
RWP
1810
0
5
12
66
63
0
56
G-D2
1
G-D6 G-D5 G-D4 330mm O/a Cavity wall thickness Disabled
A
D
15710 1085
665
56
60
5
12
66
RWP 1535
O/a Cavity wall thickness
1565
5
60
22
22
60
135°
2710
12
5
22
5
63
1
F
1340
66
5
66
66
5
60
GROUND FLOOR LAYOUT 330mm O/a Cavity wall thickness
brick face setting out 300mm off grid
1135
RWP
89
60
60
66
d
gri
15710
Brew
910
brick face setting out 300mm off grid
Brew
RWP
B
Second area: 279m² - 3,003ft² First floorfloor net net area: 279m² - 3,003ft²
60
22
22
off
22
890 RWP
B
RWP
22
0
m
5
G-D7 910
9000
15710
A
1790
1 2
Plant
RWP
685
5
56
0m
t 49
66
A
665
Plant
9000
Male Shower
2690
66
0
89
5
12
66
ou
60
2710
1135
Net Area: 3,003 sq ft (279 sq m)
1 RWP 1540
60
60
g
60
ttin
22
se
22
Shower
GROUND FLOOR LAYOUT
665
SECOND FLOOR LAYOUT
Cl. FD 30 SS S-D4
22
22
e
0
665
Brew
SS S-D3
Female
66
5
66
d
gri
ou
off
fac
56
4725
11 85
5000
36 20
gla zin g
res ista nt fire n 30 mi
2500
11 85
90 0
2500
2710
63 5
1115
brick face seeting out 300mm off grid
1565
1800
60 22 5 66 22 60 56 0 66
5
12
89 0
890
m
ck
bri
5
12
66
2710
FD 30 G-D3 SS Cl.
Male
3 2
BFD 30
S-D5
S-D6
15710 1810
60
0m
0
60
Male
RWP 1535
Female
G-D4
Shower
1
A
A Brickwork Dimensions D 1085
22
t 49
89
22
NOTE: Special bricks required, see detail drawing
2 G-D5
4
3
RWP Brew
S-D2 S-D7
RWP
B
First floor netB area: 279m² - C3,003ft²
C
Plant
Plant
A
0
ou
5
66
d
gri
G-D4 135°
Male
RWP
685
S-D8
89
g
60
ttin
22
se
off
Brew
Disabled
Female Brew FD 30 G-D3 SS Cl. NOTE: Special bricks required, see detail drawing Plant
G-D5 Disabled
1810
17765
60 22
5 66 22 60
56 0
5
12
66
60 22 5 66 d gri off m ou t 49 0m 60 22
se ttin g fac e ck bri
off m ou t 49 0m
1565
60 22
se ttin g e fac ck bri 0 89
1585
90°
e
m
G-D6
G-D7 Brew
G-D2 G-D6
G-D7
B Brickwork Dimensions
E 665
Notional escape corridor to be kept clear at all times
FD 30 SS&SC G-D1 G-D2
Notional escape corridor to be kept clear at all times
2690
Disabled Brew Refuge FD 30 SS Cl. S-D3 FD 30 Female SS S-D4
S-D5
S-D6
Second floor net area: 279m² - 3,003ft² Disabled
SECOND FLOOR LAYOUT
Net Area: 2,981 sq ft (277 sq m) 1600
Male
RWP 1540
Shower
Second floor net area: 279m² - 3,003ft²
SECOND FLOOR LAYOUT 1
0
Up
Lift
0m
t 49
1585
FD 30 SS&SC G-D1
to
2
Shower
RWP
GROUND FLOOR LAYOUT
3
d
lkh
Bu
A
89
FD 30 SS&SC G-D1
2500
68 5 51 65 88 0
5000
36 20
gla zin g
res ista nt fire n 30 mi 11 85 90 0
site on C TB
60 22 5 66 22 60 56 0 5
12
66
60 22
2710
1115
brick face seeting out 300mm off grid
5 66 d gri
1600
Notional escape corridor to be kept clear at all times
Cl. Brew FD 30 SS S-D4
Female
RWP
685
0 64
RWP
2690
S-D7
Disabled
FD 30 SS S-D3
S-D5
SECOND FLOOR LAYOUT
B
RWP
330mm O/a Cavity wall thickness
1565
135°
Up
ea
0 64
2710
Lift
1600
fac
ou
brick face setting out 300mm off grid
g ilin ce
1340
d de en sp su
1810
ce
su
65 51
665
RWP
65 51
1135
RWP 1540
15710 1135
Brew
5 68
1790
Up
5 68
1135
0
665
NOTE: Special bricks required, see detail drawing
A
1790
d
S-D6 Disabled
ilin
de
A
D
S-D8 Brew
Bulkhead to suspended ceiling
S-D7 g
A
1135
Disabled Refuge
FD 30 SS&SC S-D1S-D2
Notional escape corridor to be kept clear at all times
S-D8
Stairs from Ground to Mezzanine Floor to fabricated from steel
4
1810setting out 300mm 665off grid brick face
RWP
ce
en
FDplate, 30minimum 850mm between handrails, rise to be 175mm, going to be 250mm min, max. pitch 35 deg, min. headroom 2.0m, handrail to be min. 900mm above pitch line, balustrade to SSbe Cl. min., 1100mm above finished floor, balustrade to withstand S-D3 horizontal force of 0.36KN/ln.m. in compliance with Bs 6399 part FD 30 one 1996. Handrail to be a contrasting colour, min. 50mm diameter and must protrude 300mm beyond both the top and SS Total rise of stair 2800mm TBC on site. the bottom nosing. S-D4
RWP
685
d
su
88
1810
RWP
135°
F
1085
to
sp
330mm O/a Cavity wall thickness
C
d
lkh
Bu
S-D2 65
First floor net area: 279m² - 3,003ft²
E Brickwork Dimensions
to
0
1085
5
63
ce
brick face setting out 300mm off grid
1565
B
15710
d
su
0 64
2710
RWP
A
to
65 51
F
1340
5 68
1810
330mm O/a Cavity wall thickness
d ea lkh Bu
88
0 90
665
brick face setting out 300mm off grid
RWP
A
B
Scale
1:100
Drg. No. Project
OFFICES & BUSINESS UNITS DEVELOPMENT AT 14-08-730 HALLAM WAY, WHITEHILLS BUSINESS PARK
Drg. Size Drawing
A1 SMALL OFFICE FLOOR LEASE PLANS
Date Client
AUGUST 2016 HENCO INTERNATIONAL LTD
Dwn. By
NP
Scale
1:100
Tel: 01706218170
Peel Partnership All works to be carried out in accordance with current statutory Drg.Design No. 14-08-730 Ltd Email: mail@peeldesigns .co.uk Hilpsford New Barn Lane Health and Safety Regulations. Web: www.peeldesigns.co.uk
B
Tel: 01706218170 Email: mail@peeldesigns .co.uk Web: www.peeldesigns.co.uk RIBA Chartered Practice 20001293
Rawtenstall
Lancashire
BB4 6HT
Offering Grade A, new build office accommodation, Apollo House provides unrivalled business space in terms of bothSmall location and Office Ground, First, Secondspecification. Floor Plans and Roof Plan @ 1:100
Small Office Ground,
@ 1:100
70
E
1135
F
RWP
1565
D
ck
g
60
ttin
22
se
890 RWP
g zin gla
1790
C
bri
e
fac
910
RWP 1535
nt ista res
1135
4 Ground floor net area: 277m² - 2,981ft²
Brew 135°
fire
A
D 665
NOTE: Special bricks 1340 2710 required, see detail drawing
135°
Lift
0
ck
bri
Plant
n
B
89
0
FD 30 G-D3 SS Cl.
mi 30
1810
E
RWP
1810
de
en
sp
2
Plant
FD 30 SS&SC S-D1 Lift
1000 1600
ilin
Bulkhead to suspended ceiling
ea
g
ilin
de
d
SECOND FLOOR MEZZANINE
15710 1085
5
63
665
Notional escape corridor to be kept clear at all times
2
Brew
0
1135
Brickwork Dimensions
3
88
Up
25 13
0 64
A
4
2690
Disabled Refuge
en
sp
ea
lkh
51
1 Second floor mezzanine A net area: 36.4 m² - 391ft² Second floor net area: 279m² - 3,003ft²
RWP 1540
Bulkhead to suspended ceiling Bulkhead to suspended ceiling
65
Bulkhead to suspended ceiling
Male
3
Notional escape corridor to be kept clear at all times FD 30 SS&SC S-D1
Notional escape corridor to be kept clear at all times
51
Bu
Female
Disabled
65 51
1790
NOTE: Special bricks required, see detail drawing
135°
0 90
25 13
5 68
1135
51 65
51 65
2690
g ilin ce
70
0
330mm O/a Cavity wall thickness
RWP
665
RWP
89
male
brick face setting out 300mm off grid
1565
25 13
88
F 2710
1810
RWP
5
65
Brew
Shower
Ground floor net area: 277m² - 2,981ft²
15710
63
18
SECOND FLOOR MEZZANINE
SECOND FLOOR MEZZANINE
SECOND FLOOR LAYOUT A B
A Brickwork Dimensions D 1085
S-D8
Brew
Ground floorBnet area: 277m² C - 2,981ft²
A C
1600
g
51
Stairs from Ground to Mezzanine Floor to fabricated from steel plate, minimum 850mm between handrails, rise to be 175mm, going to be 250mm min, max. pitch 35 deg, min. headroom 2.0m, handrail to be min. 900mm above pitch line, balustrade to be min., 1100mm above finished floor, balustrade to withstand horizontal force of 0.36KN/ln.m. in compliance with Bs 6399 part one 1996. Handrail to be a contrasting colour, min. 50mm diameter and must protrude 300mm beyond both the top and the bottom nosing. Total rise of stair 2800mm TBC on site.
FD 30 SS&SC S-D9
S-D2 Second floor mezzanine net area: m²S-D5 - 391ft² S-D7 36.4 S-D6
1 2
Second floor mezzanine B net area: 36.4 m² - 391ft²
1
A
net area: 36.4 m² - 391ft²
B
Disabled Refuge
0
su
lkh
Bu
B
SECOND FLOOR MEZZANINE ROOF PLAN
Brickwork Dimensions
g zin gla
0 90
ce
20
0
18
Timber Joists fixed within the web of the steel, covered with 38mm thick Flooring grade T&G chipboard. floor construction is to be under drawn with "fireline" plasterbaord and skim all to achieve 1 fire resistance.
3
Bulkhead to suspended ceiling
12
70
25 13
d
de
en
PLAN Second floor mezzanine
A
nt ista res
0 90
20
g zin gla
12
nt ista res
FD 30 SS&SC S-D9 Office-Meeting Room
sp
A
1555
Lift
g ilin ce
d de en sp su
fire
70
fire
g
1ROOF
Bulkhead to suspended ceiling
0
18
Bulkhead to suspended ceiling Stairs from Ground to Mezzanine Floor to fabricated from steel plate, minimum 850mm between handrails, rise to be 175mm, going to be 250mm min, max. pitch 35 deg, min. headroom 2.0m, handrail to be min. 900mm above pitch line, balustrade to be min., 1100mm above finished floor, balustrade to withstand horizontal force of 0.36KN/ln.m. in compliance with Bs 6399 part one 1996. Handrail to be a contrasting colour, min. 50mm diameter and must protrude 300mm beyond both the top and the bottom nosing. Total rise of stair 2800mm TBC on site.
65
ROOF PLAN
2690
d de en sp su
to
n
20
g zin gla
12
n
3
to
2690
to
d ea lkh Bu
mi 30
nt ista res
1600
2
ilin
B
20
fire
g ilin ce
Lift
FD 30 FD 30 SS&SC floor construction: Steel supporting SS&SC S-D9 Notional escape corridor to be kept clear atMezzanine all ontimes beams steel columns with Engineered Bulkhead to suspended ceiling S-D1
d ea
F
1360
1000
n
d de en sp su
Mezzanine floor construction: Steel supporting beams on steel columns with Engineered Timber Joists fixed within the web of the steel, covered with 38mm thick Flooring grade T&G chipboard. floor construction is to be under drawn with "fireline" plasterbaord and skim all to achieve 1 fire resistance. 1000
Net Area: 391 sq ft (36.4 sq m)
Bulkhead to suspended ceiling
E 3590
RWP
Bulkhead to suspended ceiling
to
Bulkhead to suspended ceiling
51
Stairs from Ground to Mezzanine Floor to fabricated from steel plate, minimum 850mm between handrails, rise to be 175mm, going to be 250mm min, max. pitch 35 deg, min. headroom 2.0m, handrail to be min. 900mm above pitch line, balustrade to be min., 1100mm above finished floor, balustrade to withstand horizontal force of 0.36KN/ln.m. in compliance with Bs 6399 part one 1996. Handrail to be a contrasting colour, min. 50mm diameter and must protrude 300mm beyond both the top and the bottom nosing. Total rise of stair 2800mm TBC on site.
1810
Thermally broken PPC Aluminium window frames with matching insulated infill panels where indicated. dimensions are indicative and site measurements are required prior to any fabrication. Bulkhead to suspended ceiling Lift 1600
mi 30
d ea lkh Bu
Office-Meeting Room
Mezzanine floor construction: Steel supporting beams on steel columns with Engineered Timber Joists fixed within the web of the steel, covered with 38mm thick Flooring grade T&G chipboard. floor construction is to be under drawn with "fireline" plasterbaord and skim all to achieve 1 fire resistance.
2
2
3590
RWP
1000
SECOND FLOOR MEZZANINE
0
18
FD 30 SS&SC S-D9
12
Office-Meeting Room
Bulkhead to suspended ceiling
3
mi 30
Mezzanine floor construction: Steel supporting beams on steel columns with Engineered Timber Joists fixed within the web of the steel, covered with 38mm thick Flooring grade T&G chipboard. floor construction is to be under drawn with "fireline" plasterbaord and skim all to achieve 1 fire resistance.
A
D
C 1090
d ea lkh Bu
1105
4
Bulkhead to suspended ceiling
3
1105
Thermally broken PPC Aluminium window frames with matching insulated infill panels where indicated. A Bdimensions are indicative and site measurements are required prior to any fabrication.
4
Thermally broken PPC Aluminium window frames with matching insulated infill panels where indicated. dimensions are indicative and site measurements are required prior to any fabrication.
3
4
Thermally broken PPC Aluminium window frames with matching insulated infill panels where indicated. dimensions are indicative 4 and site measurements are required prior to any fabrication.
51 65
C
1555
RWP
Bulkhead to suspended ceiling
RWP
1105 1590
3590
F
4
Office-Meeting Room
1555
2690
1090
2690
910
F
F
1360
1800
E
3590
1555
64 0
D
C
E
63 5
B
A
D
C
22 60
A
B
2690
RWP
63 5
A A
C
E
1810
F
1360
64 0
B
51 65
4 A
3590
E
RWP
1810
RWP
F
A
D
C
A
D
C
1105
C
2690
A
1560
E
F
17765
E
4725
A
D
C
A
D
1800
B
C
2500
B
64 0
A
A
Total net area:
871m² - 9,379ft²
Total net area: Peel Design Partnership Ltd Hilpsford
New Barn Lane
Email: mail@peeldesigns .co.uk Web: www.peeldesigns.co.uk RIBA Chartered Practice 20001293
Rawtenstall
871m² - 9,379ft² Lancashire
RIBA Chartered Practice 20001293 Drg. Size
This drawing is Design to be read in conjunction Peel Partnership Ltd with all relevant consultants' and / or specialists' drawings / documents and any Hilpsford New Barn Lane Rawtenstall discrepancies or variations are to be notified to the architect before affected work commences.
REV.
AMENDMENTS
BB4 6HT
A1
Lancashire DateBB4 6HT AUGUST 2016
DATE
Peel Design Partnership Ltd Hilpsford New Barn Lane
Tel: 01706218170 Email: mail@peeldesigns .co.uk Web: www.peeldesigns.co.uk RIBA Chartered Practice 20001293
Rawtenstall
Lancashire
BB4 6HT
The three-storey building is available as a whole, comprising a net internal area of 9,379 sq ft (871.3 sq m) or per floor with self-contained suites from 2,981 sq ft (277 sq m) • Fully air-conditioned via ducted VRF system for heating & cooling
• Tiled toilet facilities and showers independent to each floor
• Raised access flooring for flexibility in data and power supply to desks
• Feature mezzanine “green room” on 2nd floor with vaulted ceiling & high level views over the estate
• Full LED lighting with daylight dimming and presence detection
• 24-hour access
• Up to 50 car spaces available on a secure, self-contained car park (parking ratio 1:190 sq ft) • Fully DDA compliant with passenger lift • Full suite of billed warranties available
Terms Bespoke leasing packages are available to meet the needs of a prospective occupier. The developer is ‘hands-on’, based on Whitehills and always happy to meet with occupiers at an early stage on a no obligation basis to discuss requirements further. The developer will also consider a sale option.
Enquiries Developer
Joint Agents
MISREPRESENTATION ACT: All Agents and for the vendors or lessors of this property whose agents they are, give notice that (i) these particulars are produced in good faith, are set out as a general guide only and do not constitute any part of an offer or contract. They are believed to be correct but any intending purchasers or tenants should not rely on them as statements or representations of fact but must satisfy themselves as to the correctness of each of them. (ii) no person in the employment of all agents has any authority to make or give any representation or warranty in relation to this property.