Apple Campus 2 Planned Development Permit April 2013

Report 1 Downloads 28 Views
Apple Campus 2 Planned Development Permit April 2013

!8

!,>">?

A 

!-

>!>"

A 

04 !,

!->"->" 05/25/12 A  Planning Revision

!?

!">"3>"

!"

!>6>"

A  A 

!

>!,>

A 

!!

!@>!3>

= $ 





  







) 

  "!!

 $   ">?



#

& ' (

EEF?!!E  

!8 04

S TIME

General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work. 4. Foster Partners shall be notified in writing of any discrepancies.

DGNSPEC

5. Any areas indicated on this sheet are approximate and indicative only.

East Homestead Road

North Wolfe Road

North Wolfe Road

North Tantau Avenue

East Homestead Road

06

04/12/13

Planning Revision

05

11/01/12

Planning Revision

04

05/25/12

Planning Revision

03

02/29/12

Planning Revision

02

01/17/12

Planning Revision

01

11/04/11

Planning Revision

00

08/09/11

Planned Development Permit

Rev.

Date

Reason For Issue

Chk

North Tantau Avenue

Key Plan

Pruneridge Avenue N

© Foster

Partners 2010

Arup North America Ltd. 560 Mission Street, Suite 700 San Francisco, CA 94105 USA Tel (415) 957 9445 Fax (415) 957 9096 www.arup.com

 !"#            

Int

Int

$% &'()**+++ ,,,-.  , %- /

er

er

sta

te

te

28

01&'()**+2 3   % 22

sta

28

0

0

www.altaplanning.com 2560 9th Street, Suite 212 Berkeley, CA 94710 p:510.540.5008 f:510.540.5039

Client

Apple Inc.

Project

Impermeable Area:

130.4 acres

Impermeable Area:

70.3 acres

Permeable Area:

42.6 acres

Permeable Area:

101.7 acres

Apple Campus 2

Title

01

Existing Absorbent Landscape NTS

02

Proposed Absorbent Landscape

Existing and Proposed Landscape

NTS Project No.

Date

1858

04/12/2013

Number

P1.22

Scale @ Arch E1

NTS Revision

04

$$$SYTIME$$$

General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work.

$$$DGNSPEC$$$

4. Foster + Partners shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only.

East Homestead Road

North Wolfe Road

North Wolfe Road

East Homestead Road

06

04/12/13

05

11/01/12

Planning Revision

04

05/25/12

Planning Revision

03

02/29/12

Planning Revision

02

01/17/12

Planning Revision

01

11/04/11

Planning Revision

00

08/09/11

Planned Development Permit

Rev.

Date

Planning Revision

Reason For Issue

Chk

Key Plan

Pruneridge Avenue N

North Tantau Avenue

North Tantau Avenue

© Foster

Partners 2010

Arup North America Ltd. 560 Mission Street, Suite 700 San Francisco, CA 94105 USA Tel (415) 957 9445 Fax (415) 957 9096 www.arup.com

KIER & WRIGHT Int

Int

3350 Scott Boulevard, Building 22 Santa Clara, California 95054

er

er

te

sta

te

Phone: (408) 727 6665 www.kierwright.com

sta

Fax: (408) 727 5641 © Kier & Wright, 2011

28

0

28

0

www.altaplanning.com 2560 9th Street, Suite 212 Berkeley, CA 94710 p:510.540.5008 f:510.540.5039

Client

Apple Inc.

Total Existing Trees:

4506

Existing Standard Trees:

4438

Existing Heritage Trees:

0

Existing Specimen Trees:

68

See P7.00 and P7.01

Proposed Trees:

6100

Standard Trees to Remain:

844

Standard Trees to Transplant:

76

Specimen Trees to Remain:

01

Specimen Trees to Transplant:

13

Total Trees:

7034

Total Trees to Transplant:

89

Project

Apple Campus 2

See P7.02 and P7.03 Proposed locations for Transplanted Trees Tree #1034 Memorial English Oak will be transplanted. If it does not survive it will be replaced by another specimen oak

All existing specimen trees to be removed will be replaced at a minimum rate of 1 to 1 with new specimen trees. Existing Tree to Remain

Existing Trees

Proposed Trees

NTS

NTS

Title

Existing and Proposed Trees Project No.

Date

1858

04/12/2013

Number

P1.23

Scale @ Arch E1

NTS Revision

06