application for roofing permit - Ingleside AWS

Report 0 Downloads 71 Views
P.O. Drawer 400 2665 San Angelo Ingleside, TX 78362 Phone: 361-776-3815 Fax: 361-776-1027

APPLICATION FOR ROOFING PERMIT Permit #:__________________ Site Address: ______________________________________________________________________________________________ Legal Description: Subdivision: ________________ Lot: _________ Block: _____________

Valuation: $___________________ OWNER:

Name: ____________________________________

Phone #: ______________________________________

Address: ___________________________________________________________________________________ Number & Street) ( City) ( State) ( Zip)

CONTRACTOR: Name: ____________________________________

Phone #: ______________________________________

Address: ___________________________________________________________________________________ Number & Street) ( City) ( State) ( Zip)

ENGINEER:

Name: ____________________________________

Phone #: ______________________________________

Address: ___________________________________________________________________________________ Number & Street) ( City) ( State) ( Zip) Describe Work: ____________________________________________________________________________________________

You will be requested to furnish the following items to the Building Department in order for your application to be considered: WPI-1 from an appointed Windstorm Engineer. The City of Ingleside does not accept construction material waste. All construction material waste must be removed and properly disposed of at the expense of the owner/contractor. All contractors and subcontractors must have a trash trailer or dumpster on site for debris removal. All contractors and subcontractors must be registered by the City of Ingleside. Failure to be registered will result in no permits being issued and no inspections being made.

Applicant Signature: _______________________ Reviewed By: ____________________ Date: _________ Engineer Signed Inspection (WPI-2) required upon completion. You may email it to:mailto:building@ingle [email protected])

sidetx.gov