Agenda Overview Demolition of Green Building – North Site Concept Plans for ART Facilities Concept Plan for Street and Streetscape Improvements Interim use of 31St St. Lot Schedule
Vicinity Map ART Facilities Reconfiguration
E4.~~~J=~-..::= ==-=::~~- ~-
OVERALL SITE PLAN
NORTH SITE PLAN
SOUTH SITE PLAN
BUS WASH / LIGHT DUTY MAINTENANCE FACILITY
Bus Wash Bay Bus Wash Bay
Inspection & Light Duty Maintenance Bay
Parts Storage
Equipment Storage Equipment Storage
Site Security Office
ENVIRONMENTAL CONSIDERATIONS BUS WASH / LIGHT DUTY MAINTENANCE FACILITY AND SITE PLAN : •Water Recycling for Wash Facility W t R li f W h F ilit •Rainwater Storage – Collect water from roof drains to augment the recycled wash water •Rooftop Solar Water Heating System R ft S l W t H ti S t •Building Heating: Hydronic under floor radiant heating system •During the summer, the solar water heating system will augment the gas‐fired boiler for the vehicle wash equipment •Maximize Natural Lighting •Design for Natural Ventilation (Temperature Control & CNG Ventilation) •Underground storm water management •Trash Recycling •Site lighting will be full cut‐off design and aimed downward and away from the property line
ELEVATION
ELEVATION
ELEVATION
ELEVATION
South Eads Street Elevation
Jefferson Davis Highway Elevation
ELEVATION
ART HOUSE STREET IMPROVEMENTS
ART HOUSE STREET IMPROVEMENTS
Vicinity Map ART Facilities Reconfiguration
E4.~~~J=~-..::= ==-=::~~- ~-
SCHEDULE
ART HOUSE FACILITIES SCHEDULE PROJECT REHAB OF 2900 S. EADS DEMOLITION OF GREEN BUILDING – NORTH SITE DESIGN DEVELOPMENT AND CONSTRUCTION: • INTERIM USE OF 31ST STREET LOT • SOUTH SITE & NORTH SITE: DESIGN PHASE • SOUTH SITE & NORTH SITE: CONSTRUCTION PHASE