ART House Facilities - Arlingtonva

Report 4 Downloads 139 Views
ART House Facilities

Agenda  Overview  Demolition of Green Building – North Site  Concept Plans for ART Facilities  Concept Plan for Street and Streetscape Improvements  Interim use of 31St St. Lot  Schedule

Vicinity Map ART Facilities Reconfiguration

E4.~~~J=~-..::= ==-=::~~- ~-

OVERALL SITE PLAN

NORTH SITE PLAN

SOUTH SITE PLAN

BUS WASH / LIGHT DUTY MAINTENANCE FACILITY

Bus Wash Bay Bus Wash Bay

Inspection & Light Duty Maintenance Bay

Parts Storage

Equipment Storage Equipment Storage

Site Security  Office

ENVIRONMENTAL CONSIDERATIONS BUS WASH / LIGHT DUTY MAINTENANCE FACILITY AND SITE PLAN : •Water Recycling for Wash Facility  W t R li f W h F ilit •Rainwater Storage – Collect water from roof drains to augment the recycled wash water •Rooftop Solar Water Heating System R ft S l W t H ti S t •Building Heating: Hydronic under floor radiant heating system •During the summer, the solar water heating system will augment the gas‐fired boiler for the    vehicle wash equipment •Maximize Natural Lighting •Design for Natural Ventilation (Temperature Control & CNG Ventilation) •Underground storm water management •Trash Recycling •Site lighting will be full cut‐off design and aimed downward and away from the property line

ELEVATION

ELEVATION

ELEVATION

ELEVATION

South Eads Street Elevation

Jefferson Davis Highway Elevation

ELEVATION

ART HOUSE STREET IMPROVEMENTS

ART HOUSE STREET IMPROVEMENTS

Vicinity Map ART Facilities Reconfiguration

E4.~~~J=~-..::= ==-=::~~- ~-

SCHEDULE

ART HOUSE FACILITIES SCHEDULE PROJECT REHAB OF 2900 S. EADS  DEMOLITION OF GREEN BUILDING – NORTH SITE  DESIGN DEVELOPMENT AND CONSTRUCTION: • INTERIM USE OF 31ST STREET LOT • SOUTH SITE & NORTH SITE: DESIGN PHASE  • SOUTH SITE & NORTH SITE: CONSTRUCTION PHASE

2012 July ‐ Sept Oct ‐ Dec

2013 Jan ‐ Mar  April  ‐ June  July ‐ Sept

Oct ‐ Dec

2014 Jan ‐ Mar  April  ‐ June  July ‐ Sept

Oct ‐ Dec

2015 Jan ‐ Mar  April  ‐ June