WORLDWIDE PETROLEUM CONSULTING IN OVER 100 COUNTRIES
• Full Field Development Planning - SAGD - CSS
135
• Reservoir Studies
41
• Economic Forecasts • Sensitivity Analysis
DeGolyer and MacNaughton Canada Limited Suite 1430, 311 - 6 Avenue SW Calgary, Alberta, Canada T2P 3H2
[email protected] Calgary: 403.266.8680
CENTRE FOR OIL SANDS SUSTAINABILITY We work closely with business and industry
Canadian Natural Resources Limited
PROJECT
Horizon
82
Husky Energy Inc.
Sunrise
47
Imperial Oil Limited
Kearl
43 64
Shell Albian Sands Shell Albian Sands
Jackpine Muskeg River
4
Suncor Energy Inc.
Base Operations
PHASE
Phase 1 Phase 1 Reliability Tranche 2 Reliability Tranche 2 Phase 2A Phase 2A Phase 1A Phase 1B Phase 1 Phase 2 Phase 1A Commercial Millennium Mine U1 and U2 Millennium Vacuum Unit Steepbank Debottlenecking Phase 3 Millennium Debottlenecking Millennium Coker Unit North Steepbank Extension Nsolv BEST Pilot
33
Suncor Energy Inc.
Dover ESEIEH Pilot
to carry out applied research, pilot testing and technology development designed to meet the needs of Alberta’s oil sands industry.
21
Suncor Energy Inc.
Firebag
FOR MORE INFORMATION 780.471.8484 |
[email protected] nait.ca/oilsands
58
Suncor Energy Inc.
97
Sunshine Oilsands Ltd.
63
A LEADING POLYTECHNIC COMMITTED TO STUDENT SUCCESS
101 7 48
12
23
56 28
jwnenergy.com
83
Your resource for the latest oil and gas news, research reports, data and event information—updated daily. Sign up for your free daily energy e-news alert today.
West Ells
Phase A1
Mildred Lake/ Aurora
Base Mine Stage 1 & 2 Expansion Base Plant Stage 1 & 2 Debottlenecking Stage 3 Expansion Stage 3 Expansion (UE-1)
CAPACITY
PRODUCTION START
OPERATOR
Athabasca Oil Corporation BlackPearl Resources Inc. Canadian Natural Resources Limited
Cenovus Energy Inc.
Cenovus Energy Inc.
CNOOC Limited Connacher Oil and Gas Limited ConocoPhillips Canada Limited
PROJECT
135,000 110,000
2008 2009
Surface Mining
5,000
2014
12 23
Canadian Natural Resources Limited Cenovus Energy Inc. Cenovus Energy Inc.
Upgrader
5,000
2014
27
Cenovus Energy Inc.
SAGD SAGD
50,000 30,000
TBD 2017
SAP-SAGD
10,000
TBD
Narrows Lake
Phase G Phase H Pelican Upper Grand Rapids Phase A Phase A
SAP-SAGD
45,000
TBD
BlackGold
Phase 1
SAGD
10,000
TBD
Phase 2 Phase 3 Phase 4 Phase 1 Phase 2
SC-SAGD SC-SAGD SC-SAGD C-SAGD In Situ
30,000 60,000 60,000 10,700 30,000
TBD TBD TBD TBD TBD
Grand Rapids
OPERATOR
Surface Mining
4,000
2007
136
Grizzly Oil Sands Ulc
Thickwood
Surface Mining
23,000
2008
87
Ivanhoe Energy Inc.
Tamarack
Upgrader
97,000
2008 153
Koch Exploration Canada Corporation
Dunkirk
109
Marathon Oil Corporation
71
Shell Albian Sands
Surface Mining
180,000
2012
300
2014
Purified Condensing Solvent Enhanced Solvent Extraction Incorporating Electromagnetic Heating SAGD SAGD
35,000 35,000
2004 2006
SAGD
25,000
2007
SAGD SAGD
42,500 42,500
2011 2012
SAGD
23,000
2015
SAGD SAGD
33,000 5,000
2002 2014
SAGD
N/A
75
Laricina Energy Ltd. Laricina Energy Ltd.
Germain Saleski
PROJECT
Birchwood Pierre River
OPERATOR
CAPACITY
PROJECT ID
50
OPERATOR
Devon Canada Corporation
PROJECT
Pike
1C
Suncor Energy Inc.
12 23
OPERATOR
Cenovus Energy Inc. Cenovus Energy Inc. Japan Canada Oil Sands Limited
PROJECT ID
102
OPERATOR
Athabasca Oil Corporation
PROJECT
Dover West Carbonates (Leduc)
72 79
OPERATOR
E-T Energy Ltd. Southern Pacific Resource Corp.
PRODUCTION START
SAGD
35,000
2017
Phase 2B Phase 2B Phase 3 Phase 3 Phase 1
Surface Mining Upgrader Surface Mining Upgrader Surface Mining
45,000 45,000 80,000 80,000 160,000
2016 2016 2017 2017 2017
PRODUCTION START
Christina Lake Foster Creek
Phase F Phase G
SAGD SAGD
50,000 30,000
2016 2016
Hangingstone
Expansion
SAGD
20,000
2016
STP McKay
Phase 1
SAGD
12,000
PRODUCTION START
2012 2012
OILSANDS PROJECTS WITH OPERATIONS RECENTLY SUSPENDED – SOUTH ATHABASCA PROJECT ID
OPERATOR
27 1 26
Cenovus Energy Inc. Grizzly Oil Sands Ulc Laricina Energy Ltd.
Grand Rapids Algar Lake Germain
Pelican Lake Pilot Phase 1 Phase 1 CDP
75
Laricina Energy Ltd.
Saleski
Experimental Pilot
PROJECT
PHASE
TECHNOLOGY
SAGD SAGD SC-SAGD C-SAGD & SC-SAGD
CAPACITY
PRODUCTION START
600 6,000 5,000
2011 2014 2013
1,800
2011
BP p.l.c.
Brion Energy Corporation
Terre de Grace
Dover
OPERATOR
PROJECT
88 82
Brion Energy Corporation Cenovus Energy Inc. Husky Energy Inc.
47
Imperial Oil Limited
Kearl
58 104
Suncor Energy Inc. Total E&P Canada Ltd.
MacKay River Joslyn North Mine
17
Dover Telephone Lake Sunrise
PHASE
Dover North Phase 1 Phase A Phase 2A Phase 3 Phase 4 Debottlenecking MR2 Phase 1
TECHNOLOGY
SAGD
59
Brion Energy Corporation
Mackay River
88
Cenovus Energy Inc.
Telephone Lake
97 63
126 123 62
CAPACITY
50,000
PRODUCTION START
PROJECT ID
48
SAGD
50,000
TBD
45,000 35,000 80,000
TBD TBD TBD
Surface Mining
45,000
TBD
SAGD Surface Mining
20,000 100,000
TBD TBD
SAGD
50,000
SAGD
50,000
2023
SAGD
50,000
2025
SAGD SAGD SAGD SAGD SAGD SAGD SAGD Surface Mining Surface Mining
40,000 40,000 35,000 45,000 35,000 70,000 1,720 100,000 100,000
TBD 2020 2022 TBD TBD TBD TBD TBD TBD
Surface Mining
115,000
TBD
SAGD SAGD Surface Mining
62,500 62,500 20,000
TBD TBD TBD
OPERATOR
Canadian Natural Resources Limited Cavalier Energy Inc. Cenovus Energy Inc. Cenovus Energy Inc.
PROJECT
PHASE
TECHNOLOGY
CAPACITY
KN2 - Kirby North
SAGD
60,000
TBD
Hoole Christina Lake Foster Creek
SAGD SAGD SAGD
10,000 50,000 50,000
TBD TBD TBD
SAP-SAGD
32,000
TBD
SAGD
57,000
TBD
Algar Lake
Phase 1 Phase H Phase J Pelican Upper Grand Rapids Phase B Pelican Upper Grand Rapids Phase C Pelican Upper Grand Rapids Phase D Pelican Upper Grand Rapids Phase E Pelican Upper Grand Rapids Phase F Pelican Upper Grand Rapids Phase G Phase B Phase C Kinosis (K1B) Expansion 1A Expansion 1B Phase 2 Debottlenecking 1A 1B Phase 2
SAGD SAGD SAGD
35,000 35,000 6,000
2019 2020 TBD
BlackGold
Phase 2
SAGD
20,000
TBD
Muskwa
Pilot
SAGD
10,000
TBD
MEG Energy Corporation
Christina Lake
Phase 3A Phase 3B Phase 3C
50,000 50,000 50,000
TBD TBD TBD
154
Renergy Petroleum (Canada) Co., Ltd.
Muskwa
Muskwa Experimental Pilot
N/A
2015
46
Statoil
62
Suncor Energy Inc.
Leismer Meadow Creek East
Expansion Phase 1 Phase 2
SAGD SAGD SAGD Steam & CO2 Co-gen Co-injection SAGD SAGD SAGD
20,000 40,000 40,000
TBD 2020 2022
40 12 23
27
56 28 83 50 1 6 113 11
Cenovus Energy Inc.
Cenovus Energy Inc. CNOOC Limited Connacher Oil and Gas Limited ConocoPhillips Canada Limited Devon Canada Corporation Grizzly Oil Sands Ulc Harvest Operations Corp. Koch Exploration Canada Corporation
Grand Rapids
Narrows Lake Long Lake Great Divide Surmont Pike
SAP-SAGD
29,000
SAP-SAGD
29,000
SAP-SAGD
32,000
SAP-SAGD
29,000
91
OPERATOR
PROJECT
117
Athabasca Oil Corporation Husky Energy Inc.
Dover West Carbonates (Leduc) Dover West Sands & Clastics Saleski
134
Imperial Oil Limited
Aspen
102 100
51 63
Athabasca Oil Corporation
Prosper Petroleum Ltd. Sunshine Oilsands Ltd. Syncrude Canada Ltd.
PHASE
135
45,000 40,000 37,500 12,000 12,000
TBD TBD TBD TBD TBD
Phase 2 Demonstration
TAGD
6,000
PRODUCTION START
134
137
42
101
7 31
OPERATOR
Athabasca Oil Corporation
76
85,000 85,000 90,000 12,000
2026 2027 2037 TBD
Surmont Sepiko Kesik Mariana - Thornbury Wildwood
Advanced TriStar
Value Creation Inc.
DOEx (Demonstration of Excellence)
Edmonton, AB: 220-9303 34 Avenue NW T6E 5W8 Phone: 780.944.9333 Fax: 780.944.9500 Toll Free: 1.800.563.2946
Dover West Sands & Clastics
PHASE
2
100
76
100
135 121 100
76
104
123
79 104
65
Fawcett Lake
TBD
Phase 2 Phase 3 Phase 4 Phase 5 Phase 1 Phase 2
SAGD SAGD SAGD SAGD SAGD SAGD
35,000 35,000 35,000 35,000 60,000 60,000
2019 2020 2022 2024 TBD TBD
Phase 1
SAGD
30,000
TBD
SAGD
30,000
TBD
72
E-T Energy Ltd.
Poplar Creek
Experimental Pilot
54
Suncor Energy Inc.
Lewis
Phase 1 Phase 2
95
Suncor Energy Inc.
Voyageur South
Phase 1
51
Sunshine Oilsands Ltd.
Legend Lake
90
Sunshine Oilsands Ltd.
Thickwood
97
Sunshine Oilsands Ltd.
West Ells
63
Syncrude Canada Ltd.
Mildred Lake/Aurora
2019 2021 TBD TBD TBD
Commercial
SAGD
40,000
2020
Phase 3 - Tranche 1 Phase 3 - Tranche 2 Phase 3 - Tranche 3 Phase 1 Phase 2
SAGD SAGD SAGD SAGD SAGD
45,000 45,000 45,000 6,000 6,000
2020 2021 2023 TBD TBD
Phase 1
SAGD
40,000
TBD
Phase 2 Phase 3 Phase 1 Phase 2
SAGD SAGD CSS & SAGD CSS & SAGD
40,000 40,000 30,000 30,000
TBD TBD 2018 2020
Phase 1
SAGD
20,000
2021
Phase 1
12,000
TBD
30,000
TBD
60,000
TBD
30,000
TBD
131
ATS-2 Pilot
SAGD CondensablesSteam In Situ Recovery ADC & COC CondensablesSteam In Situ Recovery ADC & COC SAGD
60,000 6,000
TBD 2018
130
Pilot
ADC USP
12,000
2018
CAPACITY
12,000
Phase 1
133
2 TECHNOLOGY
Phase A2 Phase B1 Phase B2 Phase A2 Phase B Phase A3 Phase B Phase C1 Phase C2 Stage 3 Debottlenecking
Cold Catalytic Cracking In Situ In Situ Surface Mining SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD Upgrader
N/A
813
128 154 154 135 128 113 135
OPERATOR
29
Canadian Natural Resources Limited
40
23
135
Cavalier Energy Inc.
Cenovus Energy Inc.
33
Cenovus Energy Inc. Cenovus Energy Inc. Devon Canada 658 Corporation
PROJECT
PHASE
109
19
ADC USP
Accelerated decontamination, ultra-selective pyrolysis (upgrading)
BEST
Bitumen extraction solvent technology
Production technology undisclosed; will use drilling and enhanced recovery
SURFACE MINING
Truck and shovel mining
ORCRUDE
Primary upgrading process
SAGD
Steam assisted gravity drainage
75,000
TBD
SC-SAGD
30,000
TBD
Winefred Lake
Phase 1
SAGD
30,000
TBD
Jackfish East
Expansion
SAGD
20,000
2018
Phase 3 Phase 4 Phase 5 Phase 6 Phase 1 Phase 2 Phase 3 Phase 1
In Situ In Situ In Situ In Situ SAGD SAGD SAGD In Situ
60,000 60,000 60,000 60,000 41,000 41,000 82,000 40,000
TBD 776 2023 2026 TBD TBD TBD TBD TBD
72 105
112
76 76
31
62
112
105
112
112
140
105
44
a sc
116
135
60
39
141
92
80
6 80
131 13
140
80 76
76
13
3
80
76
130 11
80 76,91
13
80
112
98 80
77
80
65
12
80,92 76,97
78
80
97
97
80
92
42 77
75
76 Winefred Lake
112 50
112
74
3
73
112
48
76 105
112
112
19
112
112
72
14
62
71
18
105
63
80
881
70
23
69 7
858
663 Lakeland Provincial Park
881
55 76 Missawawi
Thermal assisted gravity drainage
UPG
Bitumen upgrading
Lac La Biche
67
4
3
827
100
Fort McMurray NORTH ATHABASCA REGION
Peace River
Athabasca SOUTH ATHABASCA REGION
827
Pinehurst Lake
66
100
76
64 55
16
15
14
13
Marie Lake
Divided highway
68
63
133
881
114
12
11
10
9
62 8 660
Primary roads
Secondary roads
999
Cold Lake
Provincial park
Unpaved highway
Cold Lake 18 North
892 Township sections
Bo
w
867
17
Cold Lake Provincial 999 Park
Paved highway
866
79
65
62
Long Lake Provincial Park
855
City
Wolf Lake
Cold Lake
Edmonton
1
LEGEND
66
Siebert Lake
36
663
63
2
Primrose Lake
Beaver Lake
55
79 2
5
Lake
TAGD
663
6
Touchwood Lake
Lac La Biche
Athabasca Cross Lake Solvent aided process Flat Provincial Lake Solvent cyclic steam assisted gravity drainage Park STEAM & CO2 Steam and 812 CO2 cogeneration co-injection
ALBERTA OILSANDS 661 DEPOSITS
79
92 80
79
105
141
61
59 59 97 79 80 141 79 79
76
76 135
a
ab
h At
SAP
PRODUCTION START
SAGD
72
79
24
80
R
IN SITU
Phase 1
135 10
97
10
26
39
97 154
97
19
112
105 56
48
80
r ive
2 Heavy-to-light upgrading process
TBD TBD TBD TBD
76
24
11
79
105
81
83
129
112
76
Heart Lake
HTL
West Kirby
Calgary, AB: 2nd Flr-816 55 Avenue NE T2E 6Y4 Phone: 403.209.3500 Fax: 403.245.8666 Toll Free: 1.800.387.2446
20
TBD TBD TBD TBD 2021 TBD TBD TBD TBD
TBD
Chard
21
30,000 30,000 30,000 30,000 30,000 30,000 20,000 30,000 30,000
15,000
Suncor Energy Inc.
22
76
Cyclic steam stimulation
SAGD
10
23
76
82
104
112
79
97
133
30
129
112
160
112
104
30
112
19
112
19
17
79
129
83
112
83
102
141
141
76
119
135
107
112
145
79
104
27 25 46 109 47
112
84
28 141
84
149
Cyclic steam assisted gravity drainage
TBD
May River
24
155
113 157
120
112
105
CSS
35,000
160
25
76
24 107 24
105
139 100
129
86
72
154 76 135 76
154
76
120
24
33
Garson Lake
881
114 146
39
150
85
107
TECHNOLOGY LEGEND
TBD
SAGD
MEG Energy Corporation
26
1
76
135
78
130 78,100 130
66 154 100 72 128 118 100 72
C-SAGD
60,000 60,000 35,000 35,000
Saleski
70
128 74
2024
SAGD SAGD SAGD SAGD
Laricina Energy Ltd.
Calling Lake
76
72
250,000
Phase 1 Phase 2 Phase 2A Hoole Phase 2B Future Optimization (Phases F,G,H) Foster Creek Future 661 Optimization
75
66
100 126
76
TBD TBD
CAPACITY
769
126
126 76
76
77
79
86
40,000 40,000
TECHNOLOGY
Gregoire Lake
135
76 76 76
79
100
154
140
76
2A
ANNOUNCED OILSANDS PROJECTS – SOUTH ATHABASCA PROJECT ID
126
85
120
107
129 102
60
112
125
130
104
76 65 154 65 100
67 7
100
57
127
24
86
145 79
86
85
85
56
24
129
86
Gipsy Lake
79
49
39
102
39
144
62
39
87
129 46
Gordon Lake
76
51
144
24
120
120
79
145
85
79
120
112
39
119
85
112
112
PRODUCTION START
SAGD
Steepbank
132
32,000 30,000 20,000 30,000 30,000
*Note: Pink highlight indicates the project phase that is plotted on the map. Projects are plotted once, using the first operating phase or, if not operating, the location of the phase with the most active current status. The map is not to scale.
3
Phase 1
Birch Mountain East McMurray
SAGD SAGD SAGD SAGD SAGD
ATS-2
Athabasca Oil Corporation
PROJECT
Birch
Canadian Natural Resources Limited Cenovus Energy Inc. Cenovus Energy Inc.
5
HS-2A Debottlenecking (1 and 2) HS-2B Expansion HS-3 Phase 1 Phase 2 Phase 3
ATS-1
OPERATOR
Athabasca Oil Corporation
67
66 22
135
77
120 112
39
101
88
Willow 29 Lake
37
63
86
119
92
50 34
79 145 46 79
121 76 46 145 46 101 76,121 59 138 46 138 46 138 129
59
76
79
85 107 79 107 119
85
112
145
79 67
Slave Lake
Surface Mining Surface Mining Surface Mining SAGD
ATS-1
92
4
2023
May River
Value Creation Inc.
5
184,000
Grizzly Oil Sands Ulc
115
6
Surface Mining
60
114
7
121
79
89
SOUTH ATHABASCA REGION
152
97
97
97
77
89 7 67
65
100
124
79
92
90
99
NORTH ATHABASCA REGION
59 145
79 59
69
91
79
97 115 152 79 132
97
1
102
79
63 55 107 104
92
152
95
107 107144 103
101
46
104
106
152
97
97
97
97
76
154 100 154
62 100
154
Mildred Lake Mine Extension (MLX) Phase 1a Phase 1b Phase 2 Pilot
Surmont
157
8
79
79,89
94 94 72
63
79
104
97
107 71 97 71
104
97
142
97
97
119
94 93
144
54
119
107
71 142 135 135
142
104 59
79
135
72
76
104
104
71
59
145
79
104
76
100
76
31
76
140
65
Mildred Lake/ Aurora
Grouse
57
120 77
75
140
104
142
154
154
104
9
88
22 65 154 100 23 65
Lesser Slave Lake Provincial Park
TBD
Canadian Natural Resources Limited
57
100
10,000
TBD
154 100
76
104
104
76
104 62
76
87
78 76
97
27
76, 89
22
100
SAGD
8,000
100
76, 89
Lake
100 76
121
76
104
79
117 154
Phase A1
Blackrod
OSUM Oil Sands Corp. PTT Exploration and Production Surmont Energy Ltd.
133
18
120
76, 100 76, 89
76, 77 76
76
76
76
93 88
40
90
92
Legend Lake
ConocoPhillips Canada Limited
142
76
76, 89
77 76,South 115 77 Wabasca 35
66
100
76
100
76
104
84
97
4
79
104
4
107
81
88
133
144
Fort McMurray
59
75
21
101
103
75
138
104 121
71
76, 77
76 79
754
90
76
Nipisi Lake
2017
SAGD
87
76
76
90
77
90 105
40
100
76
140
76
140
77
76
132
10,000
Hangingstone
123
155
132
126
SAGD
PRODUCTION START
76
76
111
Phase 1
CAPACITY
65
76, 89 79
123
North Wabasca Lake
156
124
84
Rigel
TECHNOLOGY
100
76, 89
135
36
10776, 76 76, 89
104
135
PROJECT ID
BlackPearl Resources Inc.
MEG Energy Corporation
135
ANNOUNCEAD OILSANDS PROJECTS – NORTH ATHABASCA
83
84
132
Muskwa Lake
TBD 2020 TBD
PHASE
126
154
77
83, 100
44 75
96 95
119
104
97
104
100
82
43,147
95
144
138 104
97 79
134
63 138 64
104
4
29,147
97
104 20
107
79
75
107
84 140
135
113
121
100
76
86
20
136
63
94
75
76
58 33
144, 4 147
59 64
84 79
98
118
101
147
97
104
90
145 54
100
100, 106
26
79
110
145 97
84
144
147
123
110
58
29,136 47
43
43
110 138
97
63
117
104
12
8 73
100
62 140
73
104
79
63, 121
6,63
153
77
100, 135
73,135 63, 100
143
108
TBD
PROJECT
63,120
140 21 76
TBD
OILSANDS PROJECTS WITH REGULATORY APPLICATION FILED – SOUTH ATHABASCA PROJECT ID
76
154
111
63, 100
99, 100
76
104
123 100, 123
100,106
120
1 1 21
6,63 145
71
6,63
136
76
33
104
140
136
21
100
63, 104 63, 104
111
120
3,000 75,000 75,000
Audet
135
97
6,63
145 97
84
100
100
6
20
97
43,147
147
76
15 79
15 2
104 123
99
147
144
97
32
45
152
52
29
43, 76
53
119
150
58
76,96
104 103
5
100
79
96
76,147
2
144
45
96
68,96 96, 136 76,96 22
41
15
6
43, 96
76
121 52
41
152
6
97
97
151
104
79
97
75
114
140
9
43
76
97
150
97
135
17
63
75 154
104
Graham Lake
12,000
Value Creation Inc.
154
104
CSS SA-SAGD SA-SAGD
118
135
102
104
145
120
SAGD
Frontier
104
122
Carbonate Pilot Phase 1 Phase 2
24
75
136
42
135
Peerless Lake
Lesser Slave Lake
5
20
101
121
20
136
2
150
150
135
126
SOUTH ATHABASCA REGION
Phase 1
Teck Resources Limited
126
97
NORTH ATHABASCA REGION
686
97
145 77
TBD
SAP-SAGD SAP-SAGD SAGD SAGD SAGD
CAPACITY
144
TBD
TBD
TECHNOLOGY
104
123
15
97
76
154
TBD
19,000
43
102
104
152
37
136
41 82 135 138
6 126
6
123
135 92
OILSANDS PROJECTS WITH REGULATORY APPLICATION FILED – NORTH ATHABASCA PROJECT ID
97
109 99 109
TBD
SAP-SAGD
24
135
152
51
145
109
126
131
121 104
104
109
92
PRODUCTION START
79
97
135
41
75
121
73
Namur Lake
5
142
106
100
135
2021
Kirby
TBD
SAGD SAGD Surface Mining
154
131
APPROVED OILSANDS PROJECTS – SOUTH ATHABASCA
152
OILSANDS PROJECTS ON HOLD – NORTH ATHABASCA PROJECT ID
2017
TBD TBD
17
65
1,000
2,000
100,000 100,000
Phase 1
ET-DSP
SAGD
Surface Mining Surface Mining
2008 2009 2013 2010 2011
Experimental Pilot
TBD TBD
Aurora SouthTrain 1 Aurora SouthTrain 2
3,000 22,000 35,000 10,000 10,000
Poplar Creek
10,000 8,400
Mildred Lake/ Aurora
SAGD SAGD SAGD SAGD SAGD
CAPACITY
SAGD ADC USP
TBD
Phase 1 Pilot Phase 2A Phase 2B Demonstration Commercial
TECHNOLOGY
TBD
5,000
1999
PHASE
6,000
SAGD
11,000
PROJECT
TAGD
Phase A2
89
145
135
154
76
76
79
38 110
107
76
PRODUCTION START
West Ells
SAGD
CAPACITY
CAPACITY
TBD
Pilot
TECHNOLOGY
Phase 1 Demonstration
TECHNOLOGY
10,000
2003
PHASE
PHASE
154
62
APPROVED OILSANDS PROJECTS – NORTH ATHABASCA
SAGD
2005 2007 2009 2009 2014 2008 2009 2014 2007 2010 1997 2007 2015 2007 2011 2014
62
TBD
Phase A1
6,000
PROJECT
35,000
Thickwood
10,000 20,000 30,000 30,000 30,000 72,000 58,500 20,000 10,000 10,000 1,200 30,000 118,000 35,000 35,000 35,000
142
123
100
88
135
148
148
110
97
135
PRODUCTION START
90
OILSANDS PROJECTS UNDER CONSTRUCTION – SOUTH ATHABASCA PROJECT ID
SAGD
CAPACITY
2001
SAGD
Fort Hills
TECHNOLOGY
Fort Hills
SAGD SAGD SAGD SAGD SAGD SAGD OrCrude SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD
CAPACITY
PHASE
Suncor Energy Inc. Sunshine Oilsands Ltd. Sunshine Oilsands Ltd. Syncrude Canada Ltd.
24,000
Horizon
TBD TBD
22
SAGD
Canadian Natural Resources Limited
100,000 100,000
2015
22,000
41
Surface Mining Surface Mining
Firebag
SAGD
Mackay River
Phase 1 Phase 2
Suncor Energy Inc.
2002 2008 2011 2012 2013
Brion Energy Corporation
TBD
21
10,000 8,800 40,000 40,000 40,000
59
12,000
Muskeg River
SAGD SAGD SAGD SAGD SAGD
TECHNOLOGY
SAGD
Shell Albian Sands
PRODUCTION START
Phase 1A Phase 1B Phase C Phase D Phase E Optimization (Phases C,D,E) Phase A Phase B Debottlenecking Phase C Stage 1 Phase C Stage 2 Phase D Phase E Phase F Phase 1 Phase 1 Kinosis (K1A) Pod One Algar Pilot Phase 1 Phase 2 Phase 1 Phase 2 Phase 3
PHASE
Demonstration
64
2006
2013
PROJECT
2018 TBD
Jackpine
100,000
40,000
Leismer
30,000 30,000
Shell Albian Sands
Upgrader
SAGD
Christina Lake
SAGD SAGD
43
2006
KS1 - Kirby South
MEG Energy Corporation
2017
Sunrise
116,300
Kirby
Surmont
2,000
Lewis
Surface Mining
2011
Great Divide
SAGD
Husky Energy Inc.
1978 1978
800
Long Lake
TBD TBD TBD TBD TBD
Oak Point Energy Ltd.
290,700 250,000
SAGD
Foster Creek
CAPACITY
6,000 6,000 20,000 34,784 20,000
82
Surface Mining
Pilot
Christina Lake
TECHNOLOGY
CSS & SAGD CSS & SAGD SAGD Heavy-to-Light SAGD
79
135
79 154
PRODUCTION START
107
2015
Upgrader
TECHNOLOGY
PHASE
Phase 1 Phase 2 Phase 1 Phase 1 Phase 2 Commercial Demonstration Phase 1 Phase 2
145 Gardiner Lakes
126
76
CANCELLED OILSANDS PROJECTS – NORTH ATHABASCA
Pilot Pilot Dover Experimental Pilot Dover North Phase 2 Dover South Phase 3 Dover South Phase 4 Dover South Phase 5 Phase 2 Phase 3 Phase 4 Phase B Phase 2B Future Phases Pilot Phase 1B Expansion Expansion & Debottlenecking Stage 5 Stage 6 Debottlenecking
Blackrod
11
Statoil
PHASE
76
111
135
61
CANCELLED OILSANDS PROJECTS SOUTH ATHABASCA
5,000
142
62
TBD
2015
Hangingstone Pilot
PROJECT ID
FABRICATION • MODULARIZATION • CONSTRUCTION • MAINTENANCE
Christina Lake Foster Creek
PROJECT ID
12,000
Japan Canada Oil Sands Limited
32
VISIBILITY • VALUE • ACCOUNTABILITY
TBD
2005
26
PRODUCTION START
40,000
35,000
6
CAPACITY
SAGD
Upgrader
OILSANDS PROJECTS WITH OPERATIONS RECENTLY SUSPENDED – NORTH ATHABASCA
ISO 9001 14001 18001
Cenovus Energy Inc. Harvest Operations Corp.
TECHNOLOGY
KN1 - Kirby North
2014 2014 2015 2015 2013 2015 2010 2002 1967 1967
SAGD
37
22
www.phoenixindustrial.ca
65
PHASE
Kirby
12,000 12,000 30,000 30,000 110,000 110,000 100,000 155,000 294,000 225,000
HS-1
Jackfish
PROJECT ID
1-866-778-3130
48
PROJECT
Surface Mining Upgrader SAGD SAGD Surface Mining Surface Mining Surface Mining Surface Mining Surface Mining Upgrader
OILSANDS PROJECTS UNDER CONSTRUCTION – NORTH ATHABASCA
FROM PLANNING TO PROGRESSIVE TURNOVER
OPERATOR
Surface Mining Upgrader
Hangingstone
Devon Canada Corporation
42
46
BUILT TO DELIVER
PROJECT ID
OPERATING OILSANDS PROJECTS – SOUTH ATHABASCA PROJECT ID
Inform. Connect. Grow.
Syncrude Canada Ltd.
MacKay River
Stage 1 Stage 2 Cogeneration and Expansion Stage 3 Stage 4 Stage 3-6 Debottlenecking Phase 1 Debottlenecking
TECHNOLOGY
er
• Geological Studies
OPERATOR
Riv
PROJECT ID
• Geophysical Studies
135
sca
• Petrophysical Studies
OILSANDS PROJECTS ON HOLD – SOUTH ATHABASCA
aba
OPERATING OILSANDS PROJECTS – NORTH ATHABASCA
142
136
148
77
79
103
16
58
69 63
136
135
135
• Reservoir Modelling - SAGD - CSS • Engineering Analysis
135
79
69
104
Athabas ca River
• Probabilistic and Deterministic Reserves / Resource Assessment
SEPTEMBER 2016
Ath
ATHABASCA OILSANDS LEASE MAP – SEPTEMBER 2016
ATHABASCA OILSANDS LEASE MAP
COMPLETE EVALUATION OF ALBERTA BITUMEN & OILSANDS DEPOSITS
Alberta government Athabasca Oilsands Region boundary
28
Moose Lake Surface mineable boundary
Bonnyville Region boundary
Project*
River
Major river
Cold Lake Provincial Cold Park Lake SouthLloyd Perennial lake Lake
55
Lake Magog
897
Intermittent lake
659 Blue Lake
Major lake
SHARED LEASE OWNERSHIP 1
50% BOUNTY, 50% GRIZZLY OIL SANDS ULC
2
40% BOUNTY, 40% GRIZZLY, 20% SOUTHERN PACIFIC
3
50% BP CANADA , 50% DEVON
4
50% BP CANADA, 50% HUSKY
5
75% BP CANADA, 25% VALUE
6
60% BRION , 40% 1487648 ALBERTA .
7
67.6% CANADIAN NATURAL , 26.68% SPYGLASS , 5.72% QUATTRO
8
50% CANADIAN NATURAL, 50% CAVALIER
9
50% CANADIAN NATURAL, 50% CENOVUS
10
50% CANADIAN NATURAL , 50% DEVON
11
50% CANADIAN NATURAL , 50% HUSKY OIL
12
55% CANADIAN NATURAL, 45% DEVON
13
66.67% CANADIAN NATURAL , 33.33% SUNCOR
14
60% CENOVUS, 30% CANADIAN NATURAL , 10% SUNCOR
15
60% CHEVRON , 20% MARATHON, 20% SHELL
16
50% CHEVRON, 50% SHELL
17
50% CONOCOPHILLIPS, 50% TOTAL
18
73.5% EXALL, 18% CHAIR, 6% CANDEN, 2.5% LMP
19
72.5% EXXONMOBIL, 27.5% IMPERIAL
20
50% EXXONMOBIL, 50% IMPERIAL
21
50% GRIZZLY, 50% BOUNTY
22
50% HUSKY, 50% PETROLEO
23
50% HUSKY, 50% VALERO
24
25% IMPERIAL OIL, 25% JAPAN, 25% NEXEN, 25% SUNCOR
25
37.33% IMPERIAL, 33.33% NEXEN, 29.34% STATOIL
26
50% IMPERIAL, 25% JAPAN, 25% NEXEN
27
50% IMPERIAL, 50% NEXEN
28
63% IMPERIAL, 25% NEXEN, 12% JAPAN
29
70.96% IMPERIAL, 29.04% EXXONMOBIL
30
75% IMPERIAL, 25% NEXEN
31
95% IMPERIAL, 5% WILLISCHILD
32
50% IMPERIAL, 50% TECK
33
75% IMPERIAL, 25% NEXEN
34
75% JAPAN, 25% NEXEN
35
80% KEPPOCH, 20% PAN PACIFIC
36
60% LARICINA , 40% OSUM
37
60% MARATHON, 20% CHEVRON, 20% SHELL
38
66.67% MARATHON, 33.33% SHELL
39
65% NEXEN, 35% CNOOC
40
50% PERPETUAL, 50% NAL
41
66.7% PROSPER, 33.3% PETROLAMA
42
50% RENERGY, 50% SUNSHINE
43
60% SHELL, 20% CHEVRON, 20% MARATHON
44
33.34% SHELL, 33.33% CHEVRON , 33.33% MARATHON
45
50% SINOCANADA, 50% TOTAL
46
80% SOUTHERN PACIFIC, 20% BOUNTY
47
88% STATOIL, 12% IMPERIAL
48
50% SUNCOR, 25% JAPAN, 25% NEXEN
49
66.67% SUNCOR, 33.33% NEXEN
50
75% SUNCOR, 25% NEXEN
51
75% SUNCOR, 25% NEXEN
52
50% TECK, 25% EXXONMOBIL, 25% IMPERIAL
53
38.25% TOTAL , 36.75% SUNCOR, 15% OCCIDENTAL, 10% INPEX
54
80% WHITECAP, 20% PERPETUAL
100% LEASE OWNERSHIP 55
100% 1731856 ALBERTA
108 100% LONE PINE
56
100% 366337 ALBERTA
109 100% MADISON
57
100% 658903 ALBERTA
110 100% MARATHON
58
100% 9416471 CANADA
111 100% MAVERICK
59
100% ALBERTA OILSANDS
112 100% MEG
60
100% ALPINE
113 100% MERIDIAN
61
100% ALTERREN
114 100% MINERAL
62
100% ANTELOPE
115 100% MSL
63
100% ATHABASCA
116 100% NORDIC
64
100% BANCROFT
117 100% NORTHPINE E
65
100% BASM LAND
118 100% O & G
66
100% BAYTEX
119 100% OAK POINT
67
100% BLACKPEARL
120 100% OSUM
68
100% BLACKROCK
121 100% PAN PACIFIC
69
100% BOUNTY
122 100% PENN WEST
70
100% BRIO
123 100% PERPETUAL
71
100% BRION
124 100% PETROLAND
72
100% BRISTOL
125 100% PETROLEO
73
100% BRITT
126 100% PLUNKETT
74
100% CAITERRA
127 100% PROSPER
75
100% CANADA WEST
128 100% PROTERRA
76
100% CANADIAN NATURAL
129 100% PTTEP
77
100% CAVALIER ENERGY
130 100% QUATTRO
78
100% CAVALIER LAND
131 100% RANGER
79
100% CENOVUS ENERGY
132 100% ROLAND
80
100% CENOVUS FCCL
133 100% SANDSTONE
81
100% CENOVUS TL
134 100% SCCC
82
100% CENTENNIAL
135 100% SCOTT
83
100% CHARTER
136 100% SHELL
84
100% CNPC
137 100% SINO-WESTERN
85
100% CONNACHER
138 100% SOUTHERN PACIFIC
86
100% CONOCOPHILLIPS
139 100% SRIVASTAVA
87
100% CONTIGUOUS
140 100% STANDARD
88
100% COTE
141 100% STATOIL
89
100% CRESCENT POINT
142 100% STOMP
90
100% DEERGARDEN
143 100% STONE
91
100% DEVON CANADA
144 100% SUNCOR
92
100% DEVON NEC
145 100% SUNSHINE
93
100% DG-MARTEN
146 100% SURMONT
94
100% E-T ENERGY
147 100% SYNCRUDE
95
100% EXXONMOBIL
148 100% TECK
96
100% FORT HILLS
149 100% THE SOO LINE
97
100% GRIZZLY
150 100% TOTAL
98
100% HARVEST
151 100% TOWNSHIP
99
100% HERITAGE
152 100% VALUE
100 100% HUSKY OIL
153 100% WHITECAP
101 100% IMPERIAL
154 100% WINDFALL
102 100% JAPAN
155 100% WOOD RIVER
103 100% JOSLYN
156 100% ZONEDA
104 100% KOCH 105 100% LANDSOLUTIONS GP 106 100% LANDSOLUTIONS 107 100% LARICINA
Calgary
If you would like additional copies of this chart or have questions/comments, please call 1.800.563.2946 or email
[email protected]. Every precaution has been taken to prevent errors or omissions and the publisher assumes no responsibility for damages caused by any errors or omissions.