B 1

Report 13 Downloads 0 Views
B

RE-GREEN ELMWOOD PROPOSAL

2

3

1

Tree lined bioswale, 12 feet wide

2

Tree lined bioswale, 7 feet wide

3

Parking lot with pervious pavers

4

Traffic circle at intersection

BEFORE 1

2

Pervious paving system absorbs rainfall and reduces heat

Crossing a rain garden in a lot

Bioswale between parking spaces

09.01.2013

46 acres

LA SAFE Investment

$1.5 - $6 million

Estimated Project Cost

Public Parking Retrofits - $2.4M Elmwood W. Green Street - $1.0M Private Parking Retrofits - $4.6M Traffic Improvements - $1.4M

Partners

Jefferson Parish; Tax Incentive Financing; Private Developer

building

Elmwood West Green Streets

1 3 2

1

2

4

MAIN ENTRANCE

MAIN ENTRANCE

Temporary infiltration in empty lots

Infiltration in parking lots

Wat er

ratio

JOSEPH S. YENNI BUILDING

Water lane Temporary infiltration in empty lots

n in

orar

y inf

stor

Tree lined bioswale

lane

Infilt Tem p

Water storage lots

Bioswale

Wat er

water lanewater in park zone tree lined lane park

ing l

iltra

age

tion

lots

ots

Pervious parking

water lane in parkspaces zone pervious parking

in em

pty

lots

Gutter across roadway

pervious parking spaces gutter across the street

Infiltration in parking lots Water storage lots

JOSEPH S. YENNI BUILDING

Infiltration in parking lots Water storage lots lots Infiltration in parking

Temporary Water lane infiltration in empty lots

Existing tree

gutter across excisting tree the street

N

Temporary infiltration in parking lots Water storage lots

Water storage lots

400’

N

1600’

4000’

Gre

8000’

Citrus Blvd

Green and water

N structure

Jefferson Elmwood, lines & fields N Green and water structure

Jefferson Elmwood, lines & fields

Green and water structure

N

4000’

1600’

rson

8000’

nd w

Elm

400’

400’

400’

1600’

1600’

1600’

4000’

8000’

4000’ May 2013

4000’

May 2013

8000’

Plan of Project Area May 2013

Green Street and Parking Retrofits

Parking Retrofits

ater

woo

Citrus Blvd

Future Vision for Elmwood District Jefferson Elmwood, lines & fields Green Streets, Parking Retrofits, and Water Storage Green and water structure

en a

Jeffe 400’

New tree

excisting new tree tree

Yenni Building site and Citrus Blvd.

Citrus Blvd

Water lane Temporary infiltration in empty lots Infiltration in parking lots Water storage lots Temporary infiltration in empty lots

d, lin

N

stru

es &

ctur

field

e

s

Pedestrian bridge

small pedestrian bridge new tree

Sidewalk

4small pedestrian bridge 00’ path 160 0’ 400 0’

path grass

picnic grass site M ay 2 013 building picnic site

8000’ building

800

0’

Metairie Elmwood

M is s

iver

Water lane

Yenni

tree lined water lane LEGEND

Kenner

iR

MAIN ENTRANCE

Infiltration in parking lots

LEGEND

Elmwood Business District

p ip

Water lane

JOSEPH S. YENNI BUILDING

3

Location

s is

Proposal: Design

1

Yenni Building parking lot - demonstration project

Tree lined bioswales, new sidewalks, and pervious parking

Project Site

TR AN

Project Area

Perspective

picnic site

grass

path

small pedestrian bridge

new tree

excisting tree

gutter across the street

pervious parking spaces

water lane in park zone

LEGEND

Bioswale, path, bridge, and parking

tree lined water lane

N

Key Info

& E N R O I U AT T L E R

STO MA R M NA W GE A

R TEENT M

1

3

Community Benefits

, S I ON B EDUCAT & JO ECONOMY

Once called Elmwood Park and now a heavily paved commercial district, Elmwood is the source of much of the flooding from runoff that occurs within its boundaries but also throughout the riverside portions of Jefferson Parish. Re-Green Elmwood is a long-term strategy that peels back pavement where possible and transforms street edges, rights of way, and parking lots into an interconnected network of water storage spaces. The set of proposed pilot project options kicks off this vision with smart retrofits in both public and private land that add value to retail and commercial developments, while limiting flooding within the district and beyond.

DEHOU VE SING LOP & M EN T

Green Street and Parking Retrofits

RECU C

Elmwood West Drive

SPORTATION

Pervious paving, green space, vegetation, and underground detention components drain and filter stormwater and reduce flooding. The tree canopy and greenspaces reduce heat island effect. Increases demand for private redevelopment in Elmwood, including adjacent mixed-use renovation of old Kmart site with 280 residential units. Sidewalks and green space increase pedestrian walkability, safety and connectivity. Signalized intersections and traffic calming improve circulation and decrease delays. Improvements will enhance neighboring businesses and promote new investment; signage will educate residents about the value of green infrastructure. Re-introduction of natural green features such as bioswales and tree canopy will promote walkability and begin the transition to a mixed use area with cultural and recreational amenities.