ballston station - Arlingtonva

Report 2 Downloads 284 Views
4

3

2

1

Applicant

BALLSTON STATION HOUSING CORP. PO BOX 3315 Arlington, VA 22203 Attorney of Record

BALLSTON STATION

HOUSING CORPORATION

D

Architecture Interior Architecture Land Planning Sustainability

Developer

8614 Westwood Center Drive Suite 800 Tysons, VA 22182

BOZZUTO DEVELOPMENT COMPANY

T: 703.556.9275

6406 Ivy Lane, Suite 700, Greenbelt MD 20770 Office (301) 446 2282 Doris Gantos

4201 FAIRFAX DRIVE ARLINGTON VA, 22203 Multifamily Residential / Church / Preschool

www.dcsdesign.com

Zoning Attorney

McGuire Woods LLP 1750 Tysons Boulevard, Suite 1800 Tysons, VA 22102 Office (703) 919 4314 Tad Lunger: [email protected]

Architect

Davis Carter Scott, LTD 8614 Westwood Center Drive, Suite 800 Tysons, VA 22182 703-556-9275 (Phone) 703-821-6976 (Fax) Doug Carter: [email protected]

Civil Engineer

BohlerDC.

C

1301 Pennsylvania Ave, NW Suite 825 DC 20004 202-524-5700 (Phone) [email protected]

Structural Engineer

SK&A DC

PRINT DATE 7/15/16, 12:58 pm

1155 Connecticut Ave, NW Suite 800 Washington DC 20036 202-659-2520

ISSUE DATE

Matthew Herringa, PE; [email protected]

4.1 Submission

04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

ÌÌÌ

MEP Engineer

03.15.16

LTD

Interface Engineering 2000 M Street, NW Suite 270 Washington, DC 20036 202.370 9516 (Phone) Kevin Cahill: [email protected]

Landscape Architect

REVISION DATE

Land Design

B

PROJECT TITLE

200 South Peyton Street Alexandria, VA 22314 703-549-7784 (Phone)

BALLSTON STATION HOUSING CORP.

Gabriela Canamar Clark, PLA ASLA

Kitchen Consultant

4201 FAIRFAX DRIVE Arlington, VA 22203

Culinary Advisors 706 N Henry St Alexandria, VA 22314

4.1 SUBMISSION

703.299.5006 (Phone)

PROJECT NO.

Bonita P Zietlow:

3-15-358.00

DRAWING TITLE

FINAL 4.1 SUBMISSION

COVER SHEET

JULY 15, 2016 LTD

A M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-000.dwg Xrefs: 358_CD24X36V; dcslogo_v

DRAWN BY CHECKED BY QA REVIEWED BY DRAWING NUMBER

A-000 SHEET 358_A-000.dwg 4

3

2

1

OF

KPJ AS DNC

4

3

2

PROJECT: BALLSTON STATION HOUSING CORPORATION 4201 FAIRFAX DRIVE ARLINGTON, VIRGINIA 2203

1

DRAWING INDEX

6 STORY RESIDENTIAL BUILDING ON TOP OF CHURCH AND PRESCHOOL AT 1ST 2 LEVELS AND 2 BELOW GRADE GARAGE LEVEL PARKING. ZONE - C2

Architecture Interior Architecture Land Planning Sustainability

PROPOSED ZONE - RC

D

8614 Westwood Center Drive Suite 800 Tysons, VA 22182 T: 703.556.9275 www.dcsdesign.com

C

PRINT DATE 7/15/16, 12:59 pm ISSUE DATE 4.1 Submission

04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

REVISION DATE B

127 1,806

715 SF

980

124 SF

PROJECT TITLE 7,983 SF

166 73

1,130 SF

BALLSTON STATION

268 118

HOUSING CORP. 3,619 SF 863

1,305 SF

4201 FAIRFAX DRIVE Arlington, VA 22203

467

215

382

215

4433

4.1 SUBMISSION

220

PROJECT NO.

248

4th thru 8th Floor: 1st Floor:

20,051 sf ( PRESCHOOL - 3,619 sf PLAY AREA - 1,254 sf TOTAL AREA EXEMPT = 4,873 sf )

2nd Floor:

19,823 sf

3-15-358.00

DRAWING TITLE

PROJECT INFORMATION

15,692 sf ( PRESCHOOL - 7,983 sf PLAY AREA - 715 sf TOTAL AREA EXEMPT = 8,698 sf )

D N. S T A F F O R LTD

A

ST RE ET

M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-001.dwg Xrefs: 358_CD24X36V; dcslogo_v; 358_Drawing-Index; 358_2ND_FLOOR; 358_Gridlines; 358_Property Lines; 358_FIRST_FLOOR; 358_2ndFL_Columns; 358_1stFL_Columns; 358_TYP_FLOOR; 358_THIRD_FLOOR; 358_3rd_FL_Columns; 358_P1_LEVEL; 358_ROOF; 358_P1_P2_Columns

ÓÓ

LTD

ÌÌÌ

03.15.16

SITE

IVE FAIRFAX DR

A FAIRF

DRAWN BY CHECKED BY QA REVIEWED BY

E X DRIV

DRAWING NUMBER

A-001 VICINITY MAP

3rd Floor:

SHEET

19,749 sf

358_A-001.dwg 4

3

2

1

OF

AS AS DNC

4

3

2

1

Architecture Interior Architecture Land Planning Sustainability

D

8614 Westwood Center Drive Suite 800 Tysons, VA 22182 T: 703.556.9275 www.dcsdesign.com

MAIN ELECTRICAL ROOM

UTILITY VAULT

GENERATOR ROOM 335 SF

C

SPEED RAMP 13.5%

PRINT DATE 7/15/16, 12:59 pm ISSUE DATE MECH. SHAFT

4.1 Submission

04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

LTD

ÌÌÌ

LOBBY

03.15.16

ELEV. 2

STAIR-B

B

ELEVATOR LOBBY

ELEVATOR LOBBY

ÓÓ

FIRE PUMPS

REVISION DATE PROJECT TITLE

ELEV. 1

BALLSTON STATION HOUSING CORP.

4201 FAIRFAX DRIVE Arlington, VA 22203

4.1 SUBMISSION PROJECT NO.

KEY PLAN

3-15-358.00

PLAN PARKING P1 LEVEL

A

1

GARAGE PLAN -P1 Level LTD

M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-201.dwg Xrefs: 358_CD24X36V; dcslogo_v; 358_KeyPlan; 358_P1_LEVEL_ANNO; 358_P1_LEVEL; 358_P1_P2_Columns; 358_Gridlines

DRAWING TITLE

DRAWN BY CHECKED BY QA REVIEWED BY DRAWING NUMBER

A-201

GRAPHIC SCALE

SHEET 358_A-201.dwg 4

3

2

1

OF

KPJ AS DNC

4

3

2

1

Architecture Interior Architecture Land Planning Sustainability

D

8614 Westwood Center Drive Suite 800 Tysons, VA 22182 T: 703.556.9275 www.dcsdesign.com

MAIN ELECTRICAL ROOM 1315 SF

C

UTILITY VAULT

RESIDENTIAL STORAGE 1070 SF

PRINT DATE 7/15/16, 12:59 pm ISSUE DATE 03.15.16

4.1 Submission

04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

ELEV. 2

STAIR-B

ELEV. 1

B

ÓÓ

ELEVATOR LOBBY

LTD

ÌÌÌ

LOBBY

PET SPA 298 SF

REVISION DATE

RESIDENTIAL STORAGE 171 SF

PROJECT TITLE

BALLSTON STATION HOUSING CORP.

4201 FAIRFAX DRIVE Arlington, VA 22203

4.1 SUBMISSION

WORKSHOP 578 SF

PROJECT NO.

KEY PLAN

3-15-358.00

PLAN PARKING P2 LEVEL

A

1

GARAGE PLAN -P2 Level LTD

M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-202.dwg Xrefs: 358_CD24X36V; dcslogo_v; 358_PARK-LEGN; 358_KeyPlan; 358_P1_LEVEL_ANNO; 358_P1_LEVEL; 358_Gridlines; 358_P1_P2_Columns

DRAWING TITLE

DRAWN BY CHECKED BY QA REVIEWED BY DRAWING NUMBER

PARKING DIMENSIONS

A-202

GRAPHIC SCALE

SHEET 358_A-202.dwg 4

3

2

1

OF

KPJ AS DNC

4

3

2

1

Architecture Interior Architecture Land Planning Sustainability

D

8614 Westwood Center Drive Suite 800 Tysons, VA 22182 T: 703.556.9275 www.dcsdesign.com

PROPOSED PROPERTY LINE

TRANSFORMER VAULT LOCATION LINE OF BUILDING ABOVE

PROPERTY LINE

LOADING DOCK MAN DOOR

5'-0" WIDE SIDEWALK

BMP VAULT ALT

GARAGE EXIT

LOADING ENTRANCE

LOADING

ST ST Trash Compact. NURSERY 9

OUT DOOR PLAY AREA

2 YRS 15 550 SF

EXHAUST SHAFT

2 YRS 15 550 SF

Serv.

1125 SF PRESCHOOL ENTRANCE

ST.

TOILET

DINING 80

EGRESS DOOR PRE SCHOOL LOBBY

TOIL. T OFFICE

ST.

ST.

T MEN

WOMEN

MULTIPURPOSE

VESTIBULE

CORRIDOR

COVERED SIDEWALK

STAIR - B

OFFICE OFFICE

OFFICE

CHURCH 200 SEATS

CHANCEL

SACRISTY

ISSUE DATE 03.15.16

4.1 Submission

04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

MGR OFFICE

PKG ROOM VESTIBULE

PRINT DATE 7/15/16, 12:59 pm

FELLOWSHIP HALL ENTRANCE STAIR - A

ÓÓ

DROP OFF / PICK UP

NEW ALLEY

EXISTING ALLEY

RECEPT. DESK

RES. LOBBY

MAIL ORGAN ROOM

REVISION DATE

RESIDENTIAL ENTRANCE

CHURCH ENTRANCES

B

FELLOWSHIP HALL EXIT

ÌÌÌ

C

EXISTING BUILDING

Kitchen Exhaust

LTD

LINE OF BUILDING ABOVE

Grease Trap.

ST

N. STAFFORD STREET

GARAGE ENTRANCE

PROJECT TITLE

BALLSTON STATION HOUSING CORP.

CANOPY ABOVE

4201 FAIRFAX DRIVE Arlington, VA 22203

4.1 SUBMISSION N. FAIRFAX DRIVE

PROJECT NO.

KEY PLAN

3-15-358.00

GROUND FLOOR PLAN

A

LTD

M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-205.dwg Xrefs: 358_CD24X36V; dcslogo_v; 358_FIRST_FLOOR - ANNO-192 ; 358_Gridlines; 358_FIRST_FLOOR; 358_Property Lines; 358_KeyPlan; 358_1stFL_Columns

DRAWING TITLE

DRAWN BY CHECKED BY QA REVIEWED BY

1

GROUND FLOOR PLAN - FIRST FLOOR

DRAWING NUMBER

A-205

GRAPHIC SCALE

SHEET 358_A-205.dwg 4

3

2

1

OF

KPJ AS DNC

4

3

2

1

Architecture Interior Architecture Land Planning Sustainability

D

8614 Westwood Center Drive Suite 800 Tysons, VA 22182 T: 703.556.9275 www.dcsdesign.com

C PLAY AREA 690 SF

LINE OF BLDG ABOVE

4-5 YRS 20 700SF

4-5 YRS 20 700SF

SCHOOL STORE 230SF

MECH. 230SF

OPEN TO LOADING BELOW

3 YRS 16 610 SF

PRINT DATE 7/15/16, 12:59 pm ISSUE DATE

MECH.

KITCHEN 485 SF

GARAGE EXH.

4.1 Submission

04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

LTD

ÌÌÌ

3 YRS 16 560 SF

03.15.16

STAIR - A STAIR - B

ÓÓ

PLAY AREA 1305 SF

REVISION DATE B

COVERED WALK-WAY BELOW

PROJECT TITLE

BALLSTON STATION HOUSING CORP.

OPEN TO CHURCH BELOW

4201 FAIRFAX DRIVE Arlington, VA 22203

4.1 SUBMISSION PROJECT NO.

KEY PLAN

3-15-358.00

DRAWING TITLE

PLAN 2ND FLOOR

A

LTD

M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-206.dwg Xrefs: 358_CD24X36V; dcslogo_v; 358_2nd_FLOOR - ANNO-192 ; 358_Gridlines; 358_2ND_FLOOR; 358_KeyPlan; 358_2ndFL_Columns; 358_THIRD_FLOOR; 358_3rd_FL_Columns

OPEN TO LOBBY BELOW

DRAWN BY CHECKED BY QA REVIEWED BY

1

2nd FLOOR PLAN

DRAWING NUMBER

A-206

GRAPHIC SCALE

SHEET 358_A-206.dwg 4

AS /KPJ

3

2

1

OF

AS DNC

4

3

2

1

Architecture Interior Architecture Land Planning Sustainability

D

8614 Westwood Center Drive Suite 800 Tysons, VA 22182 T: 703.556.9275 www.dcsdesign.com

C

PRINT DATE 7/15/16, 12:59 pm ISSUE DATE 4.1 Submission

04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

ÓÓ

LTD

ÌÌÌ

03.15.16

REVISION DATE B

PROJECT TITLE

BALLSTON STATION HOUSING CORP.

4201 FAIRFAX DRIVE Arlington, VA 22203

4.1 SUBMISSION PROJECT NO.

KEY PLAN

3-15-358.00

DRAWING TITLE

A

LTD

M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-207.dwg Xrefs: 358_CD24X36V; dcslogo_v; 358_KeyPlan; 358_THIRD_FLOOR; 358_3rd_FL_Columns; 358_Gridlines

PLAN THIRD FLOOR

DRAWN BY CHECKED BY QA REVIEWED BY

1

THIRD FLOOR PLAN

DRAWING NUMBER

A-207

GRAPHIC SCALE

SHEET 358_A-207.dwg 4

3

2

1

OF

KPJ AS DNC

4

3

2

1

Architecture Interior Architecture Land Planning Sustainability

D

8614 Westwood Center Drive Suite 800 Tysons, VA 22182 T: 703.556.9275 www.dcsdesign.com

C

PRINT DATE 7/15/16, 1:00 pm ISSUE DATE 4.1 Submission

04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

ÓÓ

LTD

ÌÌÌ

03.15.16

REVISION DATE B

COURTYARD BELOW

PROJECT TITLE

BALLSTON STATION HOUSING CORP.

4201 FAIRFAX DRIVE Arlington, VA 22203

4.1 SUBMISSION PROJECT NO.

KEY PLAN

3-15-358.00

PLAN TYP FLOOR

A

LTD

M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-208.dwg Xrefs: 358_CD24X36V; dcslogo_v; 358_KeyPlan; 358_TYP_FLOOR - ANNO-192 ; 358_TYP_FLOOR; 358_Gridlines; 358_1stFL_Columns; 358_Property Lines

DRAWING TITLE

DRAWN BY CHECKED BY QA REVIEWED BY

1

TYP FLOOR PLAN

DRAWING NUMBER

A-208

GRAPHIC SCALE

SHEET 358_A-208.dwg 4

3

2

1

OF

HE AS DNC

4

3

2

1

Architecture Interior Architecture Land Planning Sustainability

D

8614 Westwood Center Drive Suite 800 Tysons, VA 22182 T: 703.556.9275 www.dcsdesign.com

C GREEN ROOF AREA 12,000 SF

PRINT DATE 7/15/16, 1:00 pm ISSUE DATE 4.1 Submission

04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

ÓÓ

LTD

ÌÌÌ

03.15.16

REVISION DATE B

MECHANICAL AREA 5,400 SF

PROJECT TITLE

BALLSTON STATION HOUSING CORP.

4201 FAIRFAX DRIVE Arlington, VA 22203

4.1 SUBMISSION PROJECT NO.

KEY PLAN

ARCHITECTURAL EMBELISHMENT (SEE ELEVATIONS)

3-15-358.00

DRAWING TITLE

A

LTD

M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-210.dwg Xrefs: 358_CD24X36V; dcslogo_v; 358_KeyPlan; 358_ROOF-ANNO-192; 358_ROOF; 358_Gridlines

ROOF PLAN

DRAWN BY CHECKED BY QA REVIEWED BY

1

ROOF PLAN

DRAWING NUMBER

A-210

GRAPHIC SCALE

SHEET 358_A-210.dwg 4

3

2

1

OF

KPJ AS DNC

4

3

2

1

Architecture Interior Architecture Land Planning Sustainability

D

8614 Westwood Center Drive Suite 800 Tysons, VA 22182 T: 703.556.9275 www.dcsdesign.com

C

PRINT DATE 7/15/16, 1:00 pm ISSUE DATE 04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

LTD

ÌÌÌ

4.1 Submission

ÓÓ

2

EAST ELEVATION

03.15.16

EXTERIOR ELEVATION OPENING PERCENTAGES:

B

SOUTH WEST EAST NORTH

REVISION DATE PROJECT TITLE

33.4% 33.7% 36.3% 33.7%

BALLSTON STATION HOUSING CORP.

4201 FAIRFAX DRIVE Arlington, VA 22203

PROJECT NO.

3-15-358.00

KEY PLAN DRAWING TITLE

BUILDING ELEVATIONS

A

LTD

M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-301.dwg Xrefs: 358_CD24X36V; dcslogo_v; 4_1_SubmissionElevations_KeyPlan; 4_1_SubmissionElevations_MaterialSelection; Elevation_SOUTH; Submission_Elevation_Compilation_June132016

4.1 SUBMISSION

DRAWN BY CHECKED BY QA REVIEWED BY

JPG/JB

DRAWING NUMBER

1

WEST ELEVATION

A-301

GRAPHIC SCALE

SHEET 358_A-301.dwg 4

3

2

1

OF

AS DNC

4

3

2

1

Architecture Interior Architecture Land Planning Sustainability

D

8614 Westwood Center Drive Suite 800 Tysons, VA 22182 T: 703.556.9275 www.dcsdesign.com

C

2

SOUTH ELEVATION

PRINT DATE 7/15/16, 1:00 pm ISSUE DATE 4.1 Submission

04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

ÓÓ

LTD

ÌÌÌ

03.15.16

EXTERIOR ELEVATION OPENING PERCENTAGES:

B

SOUTH WEST EAST NORTH

REVISION DATE PROJECT TITLE

33.4% 33.7% 36.3% 33.7%

BALLSTON STATION HOUSING CORP.

4201 FAIRFAX DRIVE Arlington, VA 22203

4.1 SUBMISSION PROJECT NO.

3-15-358.00

KEY PLAN

BUILDING ELEVATIONS

A

LTD

M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-302.dwg Xrefs: 358_CD24X36V; dcslogo_v; 4_1_SubmissionElevations_KeyPlan; 4_1_SubmissionElevations_MaterialSelection; Submission_Elevation_Compilation_June132016

DRAWING TITLE

1

NORTH ELEVATION

DRAWN BY CHECKED BY QA REVIEWED BY DRAWING NUMBER

A-302

GRAPHIC SCALE

SHEET 358_A-302.dwg 4

3

2

1

OF

AC AS DNC

4

3

2

1

Architecture Interior Architecture Land Planning Sustainability

D

8614 Westwood Center Drive Suite 800 Tysons, VA 22182 T: 703.556.9275 www.dcsdesign.com

C

2

COURTYARD EAST ELEVATION

PRINT DATE 7/15/16, 1:01 pm ISSUE DATE 4.1 Submission

04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

ÓÓ

LTD

ÌÌÌ

03.15.16

REVISION DATE B

PROJECT TITLE

BALLSTON STATION HOUSING CORP.

4201 FAIRFAX DRIVE Arlington, VA 22203

4.1 SUBMISSION PROJECT NO.

3-15-358.00

KEY PLAN

BUILDING COURTYARD ELEVATIONS

A

LTD

M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-303.dwg Xrefs: 358_CD24X36V; dcslogo_v; 4_1_SubmissionElevations_KeyPlan; 4_1_SubmissionElevations_MaterialSelection; Submission_Elevation_Compilation_June132016

DRAWING TITLE

1

DRAWN BY CHECKED BY QA REVIEWED BY

COURTYARD WEST ELEVATION

DRAWING NUMBER

A-303

GRAPHIC SCALE

SHEET 358_A-303.dwg 4

3

2

1

OF

AC AS DNC

4

3

2

1

Architecture Interior Architecture Land Planning Sustainability

D

8614 Westwood Center Drive Suite 800 Tysons, VA 22182 T: 703.556.9275 www.dcsdesign.com

C

PRINT DATE 7/15/16, 1:01 pm ISSUE DATE 4.1 Submission

04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

ÓÓ

LTD

ÌÌÌ

2

SOUTH ELEVATION

03.15.16

REVISION DATE B

PROJECT TITLE

BALLSTON STATION HOUSING CORP.

4201 FAIRFAX DRIVE Arlington, VA 22203

4.1 SUBMISSION PROJECT NO.

3-15-358.00

KEY PLAN

ENLARGED BUILDING ELEVATIONS

A

LTD

M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-304.dwg Xrefs: 358_CD24X36V; dcslogo_v; 4_1_SubmissionElevations_KeyPlan; 4_1_SubmissionElevations_MaterialSelection; Submission_Elevation_Compilation_June132016

DRAWING TITLE

1

WEST ELEVATION

DRAWN BY CHECKED BY QA REVIEWED BY DRAWING NUMBER

A-304

GRAPHIC SCALE

SHEET 358_A-304.dwg 4

3

2

1

OF

JB AS DNC

4

3

2

1

Architecture Interior Architecture Land Planning Sustainability

D

8614 Westwood Center Drive Suite 800 Tysons, VA 22182 T: 703.556.9275 www.dcsdesign.com

C

PRINT DATE 7/15/16, 1:01 pm ISSUE DATE 4.1 Submission

04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

ÓÓ

LTD

ÌÌÌ

03.15.16

REVISION DATE B

PROJECT TITLE

BALLSTON STATION HOUSING CORP.

4201 FAIRFAX DRIVE Arlington, VA 22203

4.1 SUBMISSION PROJECT NO.

3-15-358.00

KEY PLAN

ENLARGED BUILDING ELEVATIONS

A

LTD

M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-305.dwg Xrefs: 358_CD24X36V; dcslogo_v; 4_1_SubmissionElevations_KeyPlan; 4_1_SubmissionElevations_MaterialSelection; Submission_Elevation_Compilation_June132016

DRAWING TITLE

1

EAST ELEVATION

DRAWN BY CHECKED BY QA REVIEWED BY DRAWING NUMBER

A-305

GRAPHIC SCALE

SHEET 358_A-305.dwg 4

3

2

1

OF

JB AS DNC

4

3

2

1

Architecture Interior Architecture Land Planning Sustainability

D

8614 Westwood Center Drive Suite 800 Tysons, VA 22182 T: 703.556.9275 www.dcsdesign.com

C

PRINT DATE 7/15/16, 1:01 pm ISSUE DATE 03.15.16

4.1 Submission

04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

ÓÓ

LTD

ÌÌÌ

2

EXTERIOR PERSPECTIVE

REVISION DATE B

PROJECT TITLE

BALLSTON STATION HOUSING CORP.

4201 FAIRFAX DRIVE Arlington, VA 22203

4.1 SUBMISSION PROJECT NO.

3-15-358.00

KEY PLAN DRAWING TITLE

A

LTD

M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-306.dwg Xrefs: 358_CD24X36V; dcslogo_v; 4_1_SubmissionElevations_KeyPlan; 4_1_SubmissionElevations_MaterialSelection

BUILDING MASSING

DRAWN BY CHECKED BY QA REVIEWED BY DRAWING NUMBER

1

A-306

GRAPHIC SCALE

EXTERIOR PERSPECTIVE

SHEET 358_A-306.dwg 4

3

2

1

OF

JPG AS DNC

4

3

2

1

Architecture Interior Architecture Land Planning Sustainability

D

8614 Westwood Center Drive Suite 800 Tysons, VA 22182 T: 703.556.9275 www.dcsdesign.com

C

3

AERIAL MASSING - WEST

2

AERIAL MASSING - NORTHWEST

PRINT DATE 7/15/16, 1:01 pm ISSUE DATE 4.1 Submission

04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

ÓÓ

LTD

ÌÌÌ

03.15.16

REVISION DATE B

PROJECT TITLE

BALLSTON STATION HOUSING CORP.

4201 FAIRFAX DRIVE Arlington, VA 22203

4.1 SUBMISSION PROJECT NO.

3-15-358.00

DRAWING TITLE

A

LTD

M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-307.dwg Xrefs: 358_CD24X36V; dcslogo_v; 4_1_SubmissionElevations_KeyPlan; 4_1_SubmissionElevations_MaterialSelection

MASSING CONTEXT

DRAWN BY CHECKED BY QA REVIEWED BY

4

AERIAL MASSING - EAST

1

DRAWING NUMBER

AERIAL MASSING - SOUTH

A-307 SHEET 358_A-307.dwg

4

3

2

1

OF

RC AS DNC

4

3

2

1

Architecture Interior Architecture Land Planning Sustainability

D

8614 Westwood Center Drive Suite 800 Tysons, VA 22182 T: 703.556.9275 www.dcsdesign.com

C

PRINT DATE 7/15/16, 1:01 pm ISSUE DATE 4.1 Submission

04.22.16

4.1 Full Preliminary

06.14.16

County Comments

07.15.16

Final 4.1 Submission

LTD

ÌÌÌ

A2

BUILDING SECTION B-B

03.15.16

C

D

E

F

G ÓÓ

B

REVISION DATE B

PROJECT TITLE

BALLSTON STATION HOUSING CORP.

4201 FAIRFAX DRIVE Arlington, VA 22203

4.1 SUBMISSION PROJECT NO.

3-15-358.00

KEY PLAN DRAWING TITLE

A

LTD

M:\JF\315358\DWGS\PLOT\4.1_Final Submission_June_14_2016\358_A-401.dwg Xrefs: 358_CD24X36V; dcslogo_v; 358_Sections_alt; 358_Gridlines; 4_1_SubmissionElevations_KeyPlan

BUILDING SECTIONS

DRAWN BY CHECKED BY QA REVIEWED BY

A1

DRAWING NUMBER

BUILDING SECTION A-A

GRAPHIC SCALE

A-401 SHEET 358_A-401.dwg

4

3

2

1

OF

KPJ AS DNC