BASIN CREEK HOUSE WORKING GROUP

This group will oversee activities at the house

 Bathroom

Facility for the Park

 Relocation  Highlands

of the House

College Repair Laboratory

 Rehabilitation

of House as Employee Residence

OPTIONS CONSIDERED

REHABILITATION OF HOUSE AS AN EMPLOYEE RESIDENCE

EMPLOYEE ONSITE WOULD HELP MONITOR THE PARK AND THE NEWLY OPENED RESERVOIR

REHABILITATION CONSIDERATIONS AND COSTS  Hazardous

Material Studies – Results Negative Except for small amount of asbestos on ductwork which can be removed at low cost – rehab can proceed without environmental constraints

 Insurance

Claim Filed  Markovich Construction prepared repair estimate of $139,461 Vandalism Repairs - $61,498 Update Costs $77,962

 MMIA

Revised Markovich Vandalism Estimate to - $56,167

 Reduced

due to no bathroom in structure at time of vandalism as well as ~20% Depreciation

 MMIA

 If

Agrees to pay $45,998 ACV for House less ~$10,000 deductible

BSB has the House Repaired per the Estimate, MMIA would pay $57,498 less ~$10,000 deductible

INSURANCE CLAIM DETERMINATION

Volunteer Assistance • • • • • •

Demo of add-on porches (Phase 1) Window & exterior door install (Phase 1) Lathe & plaster demo (Phase 2) Electrical (Phase 3) Plumbing (Phase 3) Lathe & plaster in living room (Phase 3)

Phase 1 Expenses

• Purchase new windows & exterior doors • Contractor for roof patching and exterior siding repair

Phase 2 Expenses •

Basement flooring repair

FUNDING

• Insurance Payment • Grants (SARTA; Montana History Foundation; National Trust for Historic Preservation) • Capital Campaign • Material Donations