Specify cobble size. Is fabric required under cobbles?
C100
WMH-ATT # 1
73.58
85.07
WMH-ATT # 1
Specify cobble size. Is fabric required under cobbles?
WMH-ATT # 1
Match C742 Hydroseed Mix
Are truncated domes to be placed in Transformer Enclosure?
Mask behind text for clarity.
WMH-ATT # 1
WMH-ATT # 1 "Kailua" Davis Color 10134 "Southern Blush"
"Sandstone"
Sheet L501 not included in review set
WMH-ATT # 1
Update line styles to further emphasize difference
WMH-ATT # 1
Check alignment of thickened edge dimensioning Structural Section not consistent with Sheet DR-C220
Detail 1/DR-C250?
WMH-ATT # 1
Structural Section not consistent with Sheet DR-C220
WMH-ATT # 1
Reference location where details of Case A through Case G may be found (Caltrans Std. Plan A88A?)
14" to 21" (22"?) and Varies
Note references the Special Provisions, but no specification is provided.
WMH-ATT # 1
Which direction does this sign face? Should it face approaching cyclist on the bike path (not towards the plaza?) R9-7 is a "No Bikes" sign, would a "Cyclists Must Dismount" sign be more appropriate at the end of the bike lane?
ATT @ 2 - (Final Comments)
Contract Limit Line has been Revised
P0728-C730-.9.1.09.A&B-FD.R0
RECEIVED PDCC APRIL 3, 2015 ADDRESS:
2665 North First Street, Suite 102, San Jose, CA 95134
PHONE: FAX:
(408) 908-7013 (408) 907-7700
SVBX Parking Structures at Milpitas and Berryessa Stations PROJECT: Contract No: C730 (DB 14062)
Date:
3/25/2015
Submittal #: Design Unit #: Rev No.: McCarthy Tracking #:
00048 N/A 0 N/A
SUBMITTAL TO
ADDRESS
CITY, STATE
Phone
Margaret Simmons-Cross
1436 California Circle
Milpitas, CA 95035
408-842-6167
SUBMITTED FOR
DATE NEEDED
DELIVERED VIA
For Review and Comment
4/7/2015
SharePoint
PROJECT LOCATION Berryessa
QTY
TYPE
DESCRIPTION
SPEC
PARAGRAPH
1
Drawings
Final Design Package 1 for Parking Structure at Berryessa Station
01 31 03 - 9
1.09.A&B
1
Design Quality Control
C730 Quality Control Binder Revision 2
01 45 00 - 8
1.1.A
Certification and Signatures
1
Reports
Revised Berryesssa BMP Sizing Calculations
01 31 03 - 28
1.22.B
Design Reports
1
Reports
Revised Berryesssa Drainage Report 01 31 03 - 28
1.22.B
Design Reports
1
Reports
Berryessa Traffic Index (TI)
01 31 03 - 28
1.22.B
Design Reports
1
Reports
Berryessa RAP Calculations
01 31 03 - 28
1.22.B
Design Reports
1
Reports
Revised Berryessa Geotech Investigation
01 31 03 - 28
1.22.B
Design Reports
NOTES Site and Grounds Improvements Drawings
MESSAGE The transmitted documents are the Final Design drawings package 1 for the Berryessa Parking Structure and the supporting documents
CC:
Contact Name
VTA
Hassan Basma
VTA
John Engstrom
Fax:
Sent By:
________________________________________________ Joseph Chung - Project Manager