Building Envelope 101 Roofing

Report 5 Downloads 149 Views
Building Envelope 101 Roofing Roofing Best Practice Design, Materials, Construction and Maintenance #iasboAC17

ILLINOIS ASBO

ILLINOIS ASBO ETHICS STATEMENT This information is for the presenters only, please remove this slide before your presentation.

• The Moderator will help ensure the Illinois ASBO Code of Ethics is adhered to throughout the presentation and ensuing audience discussion. • Moderators are given the authority to ask any attendee to leave if they become combative with presenters. • This presentation is to be informative and not to promote specific products, services, companies, etc. • If a vendor is a presenter and uses the presentation as a platform to “sell” their product or services, the Moderator has the authority to stop the presentation if the presenter refuses to modify their content. • Any vendor presenter who violates these regulations may be excluded from presenting at future presentations.

#iasboAC17

ILLINOIS ASBO

Introductions Brian Rominski, Moderator  Director of Buildings and Grounds Prospect Heights S.D. 23, Prospect Heights, IL

Brian McElmeel, Speaker  Director of Building Envelope Services, ARCON Associates, Inc., Lombard, IL Dave Noonan, Speaker  Service Department Manager Riddiford Roofing Co., Arlington Heights, IL Jeff Valentine, Speaker  District Sales Manager, SOPREMA, Inc., Wadsworth, OH #iasboAC17

ILLINOIS ASBO

Design Process (A/C) = Architect/Consultant (M) = Manufacturer (C) = Contractor INITIAL DISCUSSION WITH THE BUILDING OWNER RELATING TO A ROOF PROJECT  Roof Survey Report  Known Roof Areas of Concern  Building Owner Plan

#iasboAC17

ILLINOIS ASBO

Design Process IDENTIFY THE SPECIFIC ROOF AREAS TO BE INCLUDED IN THE PROJECT SCOPE AND PRIORITIZE  Condition  Location of Individual Roof Areas  Individual Building Use  Renovation Plans  Available Funds

A/C #iasboAC17

ILLINOIS ASBO

Design Process INITIAL ROOF SYSTEM / ROOF MEMBRANE DISCUSSION  Owner Preference Based Upon Experience  Continuity With Systems Already in Place (e.g. Warranty, Manufacturer)  Aesthetics / Samples (M)  Projected Use And Life Of Building  RTU Maintenance  Foot Traffic, Weather, Environmental Considerations  Anticipated Costs Of Different Systems

A/C #iasboAC17

ILLINOIS ASBO

Design Process ROOF MEMBRANE TYPES / THICKNESS / ATTACHMENT  Built-Up Roof Membranes: Asphalt , Coal Tar, Fiberglass Felts, Hot Applied, Cold Applied, Hybrid  Modified Bitumen (MB) Roof Membranes: Thickness Varies, Hot Applied, Cold Applied, Torch Applied / Hybrid

A/C #iasboAC17

ILLINOIS ASBO

Design Process ROOF MEMBRANE TYPES / THICKNESS / ATTACHMENT  EPDM (Ethylene Propylene Diene Monomer, Thermoset): 60 Mil - .060”, 90 Mil .090”, Unreinforced, Reinforced, Adhered, Ballasted

A/C #iasboAC17

ILLINOIS ASBO

Design Process ROOF MEMBRANE TYPES / THICKNESS / ATTACHMENT  PVC (Polyvinyl Chloride, Blends, Thermoplastic): 50 Mil - .050”, 60 Mil - .060” and 80 Mil - .080”, Reinforced, Fleece-backed, Adhered, Mechanically Attached  TPO ( Thermoplastic Polyolefin, Thermoplastic): 45 Mil - .045”, 60 Mil - .060” And 80 Mil - .080”, Reinforced, Fleece-backed, Adhered, Mechanically Attached

A/C #iasboAC17

ILLINOIS ASBO

Design Process ROOF MEMBRANE TYPES / THICKNESS / ATTACHMENT  Pre-Finished Metal Systems  Asphalt Shingles  Slate  Clay Tile  Miscellaneous

A/C #iasboAC17

ILLINOIS ASBO

Design Process  Updated Field Survey and Roof Construction Samples (C) (Existing Construction, Membrane Removal)  Initial Budgets for Construction Costs, Contingency Fees and A/E Fees  Roof System Design  Specific Construction Parameters  Approvals, Testing (M)  R-Value, Code, Insulation Types

A/C #iasboAC17

ILLINOIS ASBO

Construction Phase  Pre-Construction Meeting (C)  Site Visits During Construction (M) (C)  Pre-Final Walk Through (C)  Final Inspection (Team Process, End Result)

A/C #iasboAC17

ILLINOIS ASBO

Maintenance  Budget Maintenance Dollars $1,500 = One Man Per Day Or Two Men Per ½ Day (Elementary School) $3,000 – Two Men Per Day (Middle School, High Schools)  Bi-Annual Walk Throughs (October / April)  Clean Off Debris From Roof Membrane  Clean Out Roof Drains, Gutters And Conductor Heads  Trim Overhanging Trees  Address Identified Roofing Related Items  Maintenance Record Of Work Identified And Completed With Photos

A/C, M, C #iasboAC17

ILLINOIS ASBO

Questions and Answers We thank you for your time!

#iasboAC17

ILLINOIS ASBO

Presenters: MODERATOR INFO: Brian Rominski, Director of Buildings and Grounds Prospect Heights S.D. 23, Prospect Heights, IL c: (630) 277-1987; [email protected]

PANELISTS INFO: Brian McElmeel, Director of Building Envelope Services ARCON Associates, Inc., Lombard, IL c: (630) 881-1738; [email protected] Joe Riddiford, Vice-President Riddiford Roofing Co., Arlington Heights, IL c: (847) 514-9099; [email protected] Jeff Valentine, District Sales Manager SOPREMA, Inc., Wadsworth, OH c: (630) 743-3462; [email protected] #iasboAC17

ILLINOIS ASBO