Building Key ID Map

Report 2 Downloads 55 Views
Building form scenarios

Building Key ID Map SITE ID B8 A19 B4 B13‐14 D1 B23 A29 D18‐19 A21 B25‐31 B25‐31 B25‐31 B25‐31 A20 A25‐26‐27 A28 D3 D4 D5 D20 B15 B17 B22 B24 B5 B6‐7 B9 B10 B11‐12 B16 B18 B20 B21 D21 D22

PROPERTY NAME RCA Building (Rosslyn East) 1555 Wilson Blvd Holiday Inn Ames Center + ATUMC Architects Building (1400 Wilson) Pomponio Plaza East 1500 Wilson Blvd Key and Berkeley Bldgs 1515 Wilson Blvd (Art Associates) Rosslyn Plaza I Rosslyn Plaza II Rosslyn Plaza III Rosslyn Plaza IV 1525 Wilson Blvd 1550 Wilson Blvd 1530 Wilson Blvd Commonwealth Tower Noland Building (1300 17th St) Xerox Building (1616 Fort Myer Dr) Park Place Hyatt Hotel Rosslyn Center International Place 1101 Wilson Blvd Turnberry Tower Rosslyn Gateway Waterview Potomac Tower 1400 Wilson Blvd 1400 Key Blvd 1812 N Moore Central Place Residential Central Place Office 1801 N Lynn St 1100 Wilson Blvd 1000 Wilson Blvd

WRAPS

GOODY CLANCY WITH KITTELSON & ASSOCIATES | RHODESIDE & HARWELL FARR ASSOCIATES |  W‐ZHA

20

Noland Building

Xerox Building

Central Core International Place (along 18th St Corridor)

 Achieved development ( FAR ) 

Building height

Average site elevation

Mechnical floor height

Top of the building above MSL 

Proposed max. height above average  grade EXCLUDING PENTHOUSE

Proposed max. height above average  grade WITH 20' PENTHOUSE

Resulting height above sea level

WITH TDR SCENARIO: Proposed max.  height above average grade

WITH TDR SCENARIO: Resulting height  above sea level

Park Place

Total Building area

Tower ‐ Top (Res)

27,100 0 10,500

Sub‐total building area

Base

Floors

Gateway Buildings Rosslyn Building (East) aka RCA

Footprint SF

Floor type

Modified Major Peaks, Wider Valleys / Composite (Scenario D)

4 0 18 22

108,400 0 189,000 297,400

297,400

9.9

251

69.8

20

340.8

260

280

350

330

420

230

349

Base Tower ‐ Mid (Res)

12,800 11,700

4 14 18

51,200 163,800 215,000

215,000

9.4

207

99.4

20

326.4

210

230

329

Base 1 (Office) Base 2 (Office)

33,300 25,300 0 0

2.5 15 0 0 18

83,250 379,500 0 0 462,750

462,750

8.7

227.5

131

20

378.5

230

250

381

3 19 0 0 22

81,000 393,300 0 0 474,300

474,300

8.1

286

104

20

410

290

310

414

Base (Office) Tower  (Office)

27,000 20,700 0 0

Base 1

26,800

3

80,400

Tower (Office)

21,500

20 23

430,000 510,400

510,400

8.5 5.3 allowable

306

76.5

20

402.5

310

330

407

640,500

10.0

345

96.6

20

461.6

353

373

470

244

94.5

20

359

250

270

365

Rosslyn Center (along 18th St Corridor)

Base Tower ‐ Mid  (Office) Tower ‐ Top  (Office)

26,800 25,200 23,700 0

3 10 13 0 26

80,400 252,000 308,100 0 640,500

Key & Berkeley (combined)

Base Tower ‐ East (Res) Tower ‐ West (Office)

61,000 20,700 20,000

3 18 20 23

183,000 372,600 400,000 955,600

955,600

9.2

306

94.5

20

421

310

330

425

3 12 9 24

48,900 156,000 97,200 302,100

302,100

18.5

264

107.1 (assumed)

20

391

270

290

397

3.5 12 12 28

70,000 216,000 192,000 478,000

478,000

7.7

302.5

107.1

20

430

310

330

437

Wilson at Ft Myer

Arlington Temple UMC (along 18th St Corridor)

Ames Building (along 18th St Corridor)

Base Tower ‐ Mid (Res) Tower ‐ Top (Res)

Base Tower ‐ Mid (Res) Tower ‐ Top (Res)

16,300 13,000 10,800

20,000 18,000 16,000

Goody Clancy  Realize Rosslyn: Massing Studies

WORKING DRAFT | 12/03/2014

Gannett Buiding (along 18th St Corridor)

Neighborhood Transition Architects Building

Base Tower Mid (Res) Tower Tall (Res)

Base Tower (Office)

Base Tower ‐ Mid (Office) Tower ‐ Top (Office)

32,900 23,700 12,400

407

2.5 1 25 29

82,250 23,700 310000 415,950

9.9

322.5

20

419

374

394

470

317

230

250

319

415,950

76.48

20

132,600

31,500       14 17

441,000 573,600          573,600

9.4                  228

22,000 16,100 14,300

3.5 11 5 20

77,000 177,100 71,500 325,600          325,600

9.0

253.5

125

20

399

260

280

405

299

147.8

20

467

302

322

470

20                  409

230

250

418

89,100 450,000 0 539,100          539,100

9.2

1530 Wilson Blvd (new public corridor)

Base Tower ‐ Mid (Office) Tower ‐ Top

28,900 25,000 19,900

3 10 4 17

86,700 250,000 79,600 416,300          416,300

9.5                  221

3 12 4 10 7 20

216,600 195,600 48,400 260,000 168,700 889,300

1 2 22 10 6

49,500 90,400 283,800 102,000 48,600

72,200 16,300 12,100 26,000 24,100

49,500 45,200 12,900 10,200 8,100

889,300

9.3

374

470

see above

430

44,200         3

3 20 0 23

Base Base (office) Tower ‐west (Res) Tower‐south (Res) Tower‐east (Res)

Resulting height above sea level

300

see above 107.1 (assumed)

29,700 22,500 0

Art Associates (combined) (new public corridor)

Proposed max. height above average  grade WITH 20' PENTHOUSE

280

9.9

Base (Office) Tower ‐ Mid (Office)

Base Tower  ‐ Mid (Res) Tower  ‐ Top (Res) Tower  ‐ Mid (Office) Tower  ‐ Top (Office)

Proposed max. height above average  grade EXCLUDING PENTHOUSE

20                  406

Mechnical floor height

278.5                  107

Average site elevation

8.1

Building height

64,750 0 224,700 289,450          289,450

20

302.5 780,100

A‐M Building (combined) (new public corridor)

1550, 1560 Wilson, 1533 Clarendon (new public corridor)

Top of the building above MSL 

 Achieved development ( FAR ) 

3.5 0 21 25

264

WITH TDR SCENARIO: Resulting height  above sea level

Pomponio Plaza East (along 18th St Corridor)

18,500 0 10,700

48,900 156,000 97,200 70,000 216,000 192,000 780,100

WITH TDR SCENARIO: Proposed max.  height above average grade

Base Tower (Hotel)

3 12 9 3.5 12 12 28

Total Building area

16,300 13,000 10,800 20,000 18,000 16,000

Sub‐total building area

Footprint SF

North Base North Tower ‐ Mid North Tower ‐ Top South Base South Tower ‐ Mid South Tower ‐ Top

Floors

Hyatt Hotel

Floor type Ames Building & church (combines 2 sites above)

                    69                     20

                 168

222

174

                 396

230

250

424

267

174

20                  461

276

296

470

156 112

Goody Clancy  Realize Rosslyn: Massing Studies

WORKING DRAFT | 12/03/2014

Commonwealth Bldg

RP Phase 1 ‐ Office

RP Phase 2 ‐ Residential

RP Phase 3 ‐ Office

RP Phase 4 ‐ Residential

RP Phase 5 ‐ Office

Base (Office

Base Tower ‐ Mid (Office) Tower ‐ Upper (Office)

Base Tower ‐ (Res)

Base Tower ‐ (Office)

Base Tower ‐ Mid (Res) Tower ‐ Upper (Res)

Base

3 3 2 11 17 12 16 31

38,400 84,900 44,600 96,800 153,000 151,200 158,400 727,300          727,300

31,500       21 27,000     ‐ 24,400     ‐       21

661,500 0 0 661,500          661,500

35,400 30,600 28,400

3.5 10 6 19.5

123,900 306,000 170,400 600,300

1 20 21

11,900 11,900

21,400 21,400

15,200 14,100 10,400

25,700

288

151

20

459

299

319

470

235

171.2

20

426

240

260

431

9.0

202

171.2

20

393

200

220

391

9.4

266.5

175.1

20

462

275

295

470

                 189 255

93 93

20 20

302 368

190 260

210 280

303 373

20

467

357

377

470

9.2                  354

8.1

                    93

273

119

20

412

280

300

419

600,300

253.5

70

20

343.5

260

280

350

11900 238000 249900

249,900

240

70

20

330

240

260

330

1 21 22

21400 449400 470800

470,800

293

70

20

383

300

320

390

3 15 13 31

45600 211500 135200 392300

392,300

341

70

20

431

340

360

430

13.5

346950

WITH TDR SCENARIO: Resulting height  above sea level

9.1

WITH TDR SCENARIO: Proposed max.  height above average grade

607,600

Resulting height above sea level

121,100 308,000 178,500 607,600

Proposed max. height above average  grade WITH 20' PENTHOUSE

3.5 10 7 20.5

Proposed max. height above average  grade EXCLUDING PENTHOUSE

668,100

Top of the building above MSL 

Total Building area

54,700 143,400 161,700 53,500 254,800 668,100

Mechnical floor height

Sub‐total building area

1 3 11 5 13 20

Average site elevation

12,800 28,300 22,300 8,800 9,000 12,600 9,900

574,300

Building height

Lee Street Base (Res)  Nash‐Ft Myer Base (Res) Nash Base Bridge (Res) Nash Tower North (Res) Nash Tower South (Res) Ft. Myer Tower ‐ Mid (Hotel) Ft. Myer Tower ‐ Top (Hotel)

34,600 30,800 25,500

574,300

 Achieved development ( FAR ) 

Holiday Inn Rosslyn Westpark

Base Tower (Office

54,700 47,800 14,700 10,700 19,600

Floors

1555 Wilson / Penzance (new public corridor)

Base Retail Base Office Tower East‐Mid (Res) Tower East‐Top (Res) Tower West (Res)

Footprint SF

Floor type 1525 Wilson (new public corridor)

25

Goody Clancy  Realize Rosslyn: Massing Studies

WORKING DRAFT | 12/03/2014

LONG TERM Likely commercial buildings Likely hotel buildings  Likely residential buildings

average FAR

Realize Rosslyn: Massing Studies Total Building area

15 29 309000 655950 655,950

RP ‐ all phases 2369250

8,505,000 599,050 4,289,350 13,393,400 9.17

Average site elevation

Mechnical floor height

Top of the building above MSL 

Proposed max. height above average  grade EXCLUDING PENTHOUSE

Proposed max. height above average  grade WITH 20' PENTHOUSE

Resulting height above sea level

370.5 70 20 460.5 380 400 470

WITH TDR SCENARIO: Resulting height  above sea level

WITH TDR SCENARIO: Proposed max.  height above average grade

Building height

 Achieved development ( FAR ) 

Sub‐total building area

Footprint SF

20,600

Floors

Floor type

Tower ‐ Upper (Office)

9.4

64% 4% 32%

WORKING DRAFT | 12/03/2014

Goody Clancy