Building Location Permit Application - Bonner County

Report 8 Downloads 88 Views
BONNER COUNTY PLANNING DEPARTMENT 1500 HIGHWAY 2, SUITE 208, SANDPOINT, ID 83864 [email protected] (email)

(208) 265-1458 (208) 265-1463 (FAX) www.bonnercountyid.gov (web page)

BUILDING LOCATION PERMIT APPLICATION PROPERTY OWNER:

PERMIT#

MAILING ADDRESS:

PHONE: CELL:

CITY:

STATE:

LEGAL DESCRIPTION:

Tax #:

Section:

Subdivision Name: Block:

E-MAIL(optional):

Township:

Range:

Site Acreage:

If No provide Contractor Registration #:

Describe Use of Structure (see attached information sheet):

IS BUILDING SITE OR ACCESS ROAD:

YES

Homeowner Built:

Yes

No

Lot:

STRUCTURAL DETAIL

CLASS OF WORK

# of units_____________

New

# of stories____________

Addition

Sq footage____________ Deck

ZIP:

_______________

Remodel

NO

Change of use

Type of heating

Other

_______________________________

__________________

Attach a copy of the title OR Floor Plan of “New Model”(Current Year)

Within 300 feet of any surface water?

Year:

On or within 300 feet of a 15% or greater slope?

Make:

Within a subdivision requiring Stormwater plans?

ID#:

Is the use commercial or industrial?

Size:

If YES to any of the above, a stormwater and/or erosion control plan & fees are required

Attached garage sq. footage____________

Mobile/ Manufactured Home

Within a special flood hazard area? If YES a

AGENCY AUTHORIZATIONS Fire District:

development permit & fees are required

Local Road Jurisdiction: Does the site contain mapped wetlands?

APPLICANT/REPRESENTATIVE SIGNATURE: Address: Y / N _________________ I/We certify that I/We have read and examined this application and know the statements and depictions to be true and Address/Access Road Name: correct. I/We certify that the proposed construction will conform to the dimensions and uses shown above and that no changes will be made without first obtaining approval from Bonner County Planning Department. I/We understand that _______ additional information may be necessary for a complete review of this application by the Planning Department, and Parcel # submission of this application does not constitute approval. I/We further grant permission to Bonner County employees or officials to enter upon the subject land to make examinations or review the premises relative to this application.

Zoning District: SIGNATURE OF OWNER(S) OR AUTHORIZED REPRESENTATIVE

DATE

NOTICE: Nothing in the processing or granting of this permit shall be construed to relieve an applicant from compliance with any other requirements contained within Bonner County Revised Code, Idaho Code, state or federal regulations. EXPIRATION: This permit shall expire and become null and void if the building or work authorized by the permit is not commenced within (1) year from issuance or if the building or work is suspended or abandoned at any time after the work is commenced for a period of more than (1) year. A one-time extension of an unexpired permit, not to exceed (1) year, may be granted upon written request by the permitee, provided circumstances beyond the control of the permitee have prevented action from being taken. See 11-101 BCRC for definition of start of construction.

BLP:

$__________________

Flood Zone:

Development Permit #

$__________________ BV:

$__________________ Receipt #’s

EC/SW:

$__________________

DP:

$__________________

Commencement of construction or time extension to be received prior to:

TIME EXT:

$__________________

Date of:____________________ Extension granted to:______________

TOTAL FEES: $__________________

CONDITIONS OF APPROVAL: (For Planner Use Only)

Panel #

PERMIT APPROVAL:

(Permit is considered issued and approved when stamped, signed and initialed by a Planning Department official in this space.)

DATE RECEIVED:

Call:

or

Mail:

______________________ ______________________ J:\Planning\Administrative\Applications\BLP\Building Location Permit Application –August 8th, 2016

Page 1 of 2

BUILDING LOCATION PERMIT OWNER:

PAGE 2 - SITE PLAN PERMIT#:

COMPLETE THE SITE PLAN BELOW, DEPICTING THE FOLLOWING: Property lines of the property to be developed Location of front door & dimensions of proposed structure Locations and uses of all existing and proposed structures ________________________________________________ Septic tanks, leach fields and wells, if applicable Signature of Owner/Authorized Representative All bodies of water within 300 feet of the proposed building site and any wetlands on site. Distance from property lines to architectural projections for all proposed structures _______________________________________________ All public or private roads providing access to the site; indicate primary access. Date All easements of record (utility, road, etc) Direction to site:_____________________________________________________________________________________________________________________ ______________________________________________________________________________________________________________________________________ INDICATE NORTH IN CIRCLE

PARCEL HISTORY/COMMENTS: (For office use only)

DATE RECEIVED:

USE THIS SHEET FOR THE DRAWING OF THE DIAGRAMMATIC FLOOR PLAN SHOWING ALL LEVELS OF THE PROPOSED STRUCTURE OR ATTACH YOUR DRAWINGS (NO LARGER THAN 11 X 17)

Signature of Owner(s) or Authorized Representative Signature/Date____________________ \\7B-ADMIN1\common\Planning\Development Review\Application Forms\BLP\Diagramatic Floor Plan.doc

March 2009

USE THIS SHEET FOR THE DRAWING OF THE FRONT AND SIDE ELEVATIONS OF THE PROPOSED STRUCTURE OR ATTACH YOUR DRAWINGS (NO LARGER THAN 11 X 17)

Signature of Owner(s) or Authorized Representative Signature/Date____________________ \\7B-ADMIN1\common\Planning\Development Review\Application Forms\BLP\Elevation Drawings.doc

October 2010

BUILDING LOCATION PERMIT SITE INPSECTION REPORT RP# _________________________________________________________________ BLP#:_________________ BV#:__________________ FDP#:___________________ APPLICANT PLEASE COMPLETE NAME: SITE ADDRESS: ESTIMATED CONSTRUCTION START DATE: CONTRACTOR/CONTACT PERSON:

PHONE #

DIRECTIONS TO SITE:

OFFICIAL PLANNING USE ONLY INITIAL INSPECTION DATE: STATUS OF PROJECT: Structure staked

Footer/foundation excavated

Concrete footers placed

Poles set

Construction underway

Structure completed

How were property lines identified? Assisted by owner/contractor/neighbor

Survey pins/stakes

String line

Ample distance to property line

Fencing

Flagging

Are setbacks met as shown in site plan?

Yes

No

Does the site plan show existing structures?

Yes

No

N. A.

Is the age/model of manufacture home shown on permit?

Yes

No

N. A.

Does construction appear to conform to application?

Yes

No

Is the BLP posted?

Yes

No

Yes

No

Comments/status/visits/corrective action:

FINAL INSPECTION DATE: Does the structure conform to the permit?

INSPECTED BY: