8" x 8" Concrete Block Walls Metal Reinforcing To Code 1/2" ReeBar In Cavities 32" OC
8" x 8" Concrete Rim Beam 4 - 1/2" ReeBar 5'-10"
5" PVC Drain Tile Drain to Daylight
30" x 30" x 36" Concrete Footings 4 - 1/2" ReeBar
8" Concrete Walls 1/2" ReeBar 8" x 8" Coating for Cistern (TBD)
CISTERN
24" x 18" Concrete Footings 4 - 1/2" ReeBar 30" x 30" Pad Footings (Per Plan) Tie ReeBar Together from Pad to Trench Footings
General Notes: 1) Concrete strength - minimum 3750 psi at 28 days. 2) Concrete cover: a) Slab - Top cover at 1 1/2" Slab - Bottom cover 1 1/2" b) Columns - 2" Cover 3) All reinforcing steel are HT (High Tensile) bars. 4) 2" Cover on all Metal in Columns and Pillars
5" Concrete Roof 1/2" ReeBar 8" x 8" Coating for Cistren (TBD)
Adjust Footings to Grade
30" x 30" x 18" Concrete Footings 4 - 1/2" ReeBar
952-236-4427
10'-0"
8" x 12" Concrete Pillar W/ Beveled Top 4 - 5/8" ReeBar
Adjust all Footing Depths to Grade The Pad Footings for all posts are to be 30" X 30" X 18" Concete with ReeBar and the top of the Pad Footing should be 4' below grade
Mastering Chief Architect X5 Session 3 of 14 by: Dan Baumann
PROJECT DESCRIPTION:
952-236-4427
1. Introduction to Chief Architect 2D CAD tools 2. Learn to think in terms of CAD -- X, Y, Z 3. Everything you draw is based on CAD polylines 4. Review of common CAD tools 5. Edit behaviors - how things act on the screen 6. Other tools 7. Group CAD items 8. CAD tools used regularly 9. Point & snap tools 10. CAD - Defaults 11. Drawing in a CAD Detail Window 12. Point to Point Snaps 13. Shaping CAD polyline boxes 14. Trim and Extend Tools 15. Working with Angles in CAD 16. Miscellaneous CAD functions 17. Q&A
DATE:
What We'll be Covering In This Webinar
DATE: 3/13/2013 SCALE: No Scale: SHEET:
01-3
Introduction to Chief's CAD Tools DESCRIPTION:
7"
10'-0"
Open Saved Camera
ROOF LINES ABOVE
GLASS RAILING
16'-0" 8'-0"
8" x 8" Concrete Rim Beam 4 - 1/2" ReeBar
8'-0" METAL RAILING
11'-10"
15'-2"
1" 3'-11"
5'-7"
4'-1"
21070
2'-6 1/2"
21'-2"
2'-4"
3050DC
3070
3'-9"
8'-1"
12'-8"
BEDROOM
10'-4"
2670
2670
6070
8'-0"
30" x 30" x 36" Concrete Footings 4 - 1/2" ReeBar
8" Concrete Walls 1/2" ReeBar 8" x 8" Coating for Cistern (TBD)
24" x 18" Concrete Footings 4 - 1/2" ReeBar 30" x 30" Pad Footings (Per Plan) Tie ReeBar Together from Pad to Trench Footings
General Notes: 1) Concrete strength - minimum 3750 psi at 28 days. 2) Concrete cover: a) Slab - Top cover at 1 1/2" Slab - Bottom cover 1 1/2" b) Columns - 2" Cover 3) All reinforcing steel are HT (High Tensile) bars. 4) 2" Cover on all Metal in Columns and Pillars
5" Concrete Roof 1/2" ReeBar 8" x 8" Coating for Cistren (TBD)
Adjust Footings to Grade
30" x 30" x 18" Concrete Footings 4 - 1/2" ReeBar
The Pad Footings for all posts are to be 30" X 30" X 18" Concete with ReeBar and the top of the Pad Footing should be 4' below grade
4'-0"
3. Drawing in CAD Detail Windows
4. Drawing on The Layout Pages
952-236-4427
Adding CAD Details
5"
3'-0 15/16"
e) bars.
Rename to Organize
24'-1"
10'
2" COVER ON ALL METAL IN COLUMNS AND PILLARS
50'
Footing Sizes Floor Thicknesses Wall Finish Roof Slope - How is it done Drains To Cistern Cap on Parapet wall Stairs to Roof - How many treads