2015 Order form Communities in Bloom signage Community identification Municipality:
Order #:
Billing address: Name:
Telephone:
Title:
Fax:
Email: National Winner Number of Blooms :
National Finalist 2
3
Size 300 x 227 mm wall mounted 450 x 340 mm on 1 post 800 x 600 mm on 1 post 1200 x 900 mm on 2 posts
Delivery address:
PO box are not accepted
Name:
4
Award year: ________
5
Signage order
Number
Unit cost $ 45.00 $ 160.00 $ 300.00 $ 610.00
H.S.T. (%)
Shipping rate: Total cost of order:
Check if identical to billing address
Telephone:
Title:
Information and sending the order Telephone: 1(418)805-4414 Emaill:
[email protected] Fax: 1(866) 525-4319
Total
National finalist panel
Panel 1200 x 900 mm (4 x 3 ft)
Panel 800 x 600 mm (2.6 x 2 ft)
Town of Maple National Winner
Panel only (wall installation) 300 x 227 mm (12 x 9 in)
Town of Maple National Winner
Back view
Town of
Maple
Town of Maple National Winner
2008
Formats - 1200 x 900 mm (4 x 3 ft) - 800 x 600 mm (2.6 x 2 ft) - 450 x 340 mm (18 x 13 in) - 300 x 227 mm (12 x 9 in)
2008
2008 2700 mm (9 pi) posts
2200 mm
2000 mm
Panel specifications - 3.2 mm (1/8 in) aluminum sign - Point welded aluminum reinforced bar(s) on the back of the post signs - Electrostatic powder-coated textured Uptek (black) paint on the back - Colour laser printing on a top quality white 3M sheeting - Anti-vandal and anti-graffiti plastified semi-lustre Kalitec treatment - Installed on Delux bar brackets
Panel 450 x 340 mm (18 x 13 in) Town of Maple National Winner 2008
1200 to 1500 mm (4 to 5 feet) depending on frost line
1220, montee Masson, Laval (Quebec) Canada H7E 4P2 450.664.4414 1.888.788.4747 450.664.4420 1.866.525.4319
[email protected] www.kalitec.com
Delux post installation on the elliptical post
Post specifications - Delux 67 mm (2.6 in) aluminum fluted post - Electrostatic powder-coated textured Uptek (black) paint - 1500 mm hot-dipped galvanized internal elliptical post support cast 900 mm in concrete
1200 mm (4 ft) post
200 to 300 mm (8 to 12 inches) depending on ground’s firmness
Post profile
Communities in Bloom Drawn by :
Checked by :
Date :
Drawing # :
Edger
June 13th, 2013
*All information and drawings on this page are Kalitec property. Total or partial reproduction without the written consent of Kalitec is prohibited.
Revision time :
Communities in bloom-2013-05-21rev1
Project # :
Total time :
0.5 hour
Rev.
1
Page
1 of 1