CITY OF PUYALLUP BID TAB 9th ST SW; 9th-12th ... AWS

CITY OF PUYALLUP BID TAB 9th ST SW; 9th-12th Traffic Calming

ITEM

UNIT

EST QTY

ENGINEER's ESTIMATE

DESCRIPTION BASE BID

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

L.S. ACRE S.Y. L.F. L.F. L.S. C.Y. C.Y. C.Y. TON TON L.S. C.Y. S.Y. EACH EST. EACH EACH EACH EACH EACH EACH EACH EACH EACH EACH S.Y. C.Y. L.F. L.F. L.F. L.F. L.F. HUND L.S. L.S. EACH EACH S.Y. EACH EACH EST. L.S. CALC. L.S.

1 0.03 26 146 100 1 71 6 1.5 64 11 4 32 84 7 1 4 24 6 12 56 24 10 20 87 21 11 11 118 80 32 145 98 0.2 1 1 4 2 51 3 3 1 1 1 1

MOBILIZATION CLEARING AND GRUBBING REMOVING CEMENT CONC. SIDEWALK REMOVING CEMENT CONC. CURB AND GUTTER REMOVING PAINT LINE REMOVING MISCELLANEOUS TRAFFIC ITEM ROADWAY EXCAVATION INCL. HAUL STREAMBED COBBLES 6 IN. CONC. CLASS 4000 FOR PEDESTAL CRUSHED SURFACING BASE COURSE HMA CL. 1/2 IN. PG 64-22 ESC LEAD TOPSOIL TYPE A MULCHING INLET PROTECTION EROSION/WATER POLLUTION CONTROL PSIPE TRIDENT MAPLE PSIPE SLOUGH SEDGE PSIPE CEANOTHUS JOYCE COULTER PSIPE KELSEYI DOGWOOD PSIPE NORTHERN LIGHTS HAIR GRASS PSIPE SPREADING RUSH PSIPE TEXAS NEEDLE GRASS PSIPE SUB-ALPINE SPIRAEA PSIPE KINNIKINNICK PSIPE BROADLEAF STONECROP SOD INSTALLATION CEMENT CONC. PAVEMENT CEMENT CONC. TRAFFIC CURB & GUTTER CEMENT CONC. PEDESTRIAN CURB CEMENT CONC. MONOLITH CURB EXTRUDED CURB TYPE 6 PRECAST SLOPED MOUNTABLE CURB RAISED PAVEMENT MARKER TYPE 2 PERMANENT SIGNING PROJECT TEMPORARY TRAFFIC CONTROL PLASTIC YIELD LINE SYMBOL ADJUST MANHOLE CEMENT CONC. SIDEWALK CEMENT CONC. CURB RAMP TYPE PERPENDICULAR A CEMENT CONC. CURB RAMP TYPE PARALLEL A ROADSIDE CLEANUP TRIMMING AND CLEANUP MINOR CHANGE ROADWAY SURVEYING

UNIT PRICE

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

RS UNDERGROUND, LLC

COST

7,100.00 8,700.00 13.00 13.00 0.50 500.00 23.00 50.00 570.00 26.00 85.00 1,000.00 48.00 2.50 100.00 1,000.00 85.00 12.00 15.00 15.00 12.00 12.00 12.00 15.00 4.00 4.00 30.00 270.00 43.00 43.00 55.00 40.00 50.00 1,600.00 3,500.00 2,500.00 81.00 590.00 45.00 2,700.00 2,700.00 1,000.00 500.00 1,000.00 4,000.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

7,100.00 261.00 338.00 1,898.00 50.00 500.00 1,633.00 300.00 855.00 1,664.00 935.00 4,000.00 1,536.00 210.00 700.00 1,000.00 340.00 288.00 90.00 180.00 672.00 288.00 120.00 300.00 348.00 84.00 330.00 2,970.00 5,074.00 3,440.00 1,760.00 5,800.00 4,900.00 320.00 3,500.00 2,500.00 324.00 1,180.00 2,295.00 8,100.00 8,100.00 1,000.00 500.00 1,000.00 4,000.00

SUBTOTAL

$

82,783.00

$ $ $ $ $ $ $ $ $ $

348.00 117.00 572.00 253.00 416.00 340.00 270.00 1,892.00 1,290.00 5,400.00

SUBTOTAL $

10,898.00

UNIT PRICE

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

7,500.00 35.00 35.00 35.00 3,500.00 62.00 75.00 400.00 70.00 429.00 550.00 55.00 55.00 100.00 1,000.00 250.00 25.00 25.00 50.00 25.00 25.00 25.00 25.00 25.00 25.00 68.00 240.00 65.00 65.00 65.00 60.00 110.00 2,000.00 6,500.00 10,000.00 250.00 500.00 80.00 4,000.00 4,000.00 1,000.00 2,500.00 1,000.00 10,000.00

COST

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

225.00 910.00 5,110.00 3,500.00 3,500.00 4,402.00 450.00 600.00 4,480.00 4,719.00 2,200.00 1,760.00 4,620.00 700.00 1,000.00 1,000.00 600.00 150.00 600.00 1,400.00 600.00 250.00 500.00 2,175.00 525.00 748.00 2,640.00 7,670.00 5,200.00 2,080.00 8,700.00 10,780.00 400.00 6,500.00 10,000.00 1,000.00 1,000.00 4,080.00 12,000.00 12,000.00 1,000.00 2,500.00 1,000.00 10,000.00

$

145,274.00

$ $ $ $ $ $ $ $ $ $

300.00 315.00 1,540.00 682.00 1,120.00 940.00 585.00 2,860.00 1,950.00 8,000.00

$

18,292.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

5,000.00 840.00 1,750.00 1,125.00 620.00 420.00 8,040.00 6,750.00 550.00 200.00 250.00 975.00 1,950.00 1,675.00 1,800.00 5,000.00 2,500.00 2,000.00 8,000.00 250.00 1,500.00 500.00 5,000.00 1,500.00

$

58,195.00

$ $ $ $ $

9,600.00 3,348.00 1,800.00 5,000.00 500.00

$

20,248.00

$ $ $ $ $

9,600.00 2,988.00 1,800.00 2,500.00 500.00

$

17,388.00

$ $ $ $ $ $ $ $

145,274.00 163,566.00 203,469.00 165,522.00 162,662.00 221,761.00 242,009.00 259,397.00

BID OPTION 1 1A 2A 3A 4A 5A 6A 7A 8A 9A 10A

ACRE S.Y. L.F. C.Y. TON TON S.Y. L.F. L.F. EACH

0.04 9 44 11 16 4 9 44 30 2

CLEARING AND GRUBBING REMOVING CEMENT CONC. SIDEWALK REMOVING CEMENT CONC. CURB AND GUTTER ROADWAY EXCAVATION INCL. HAUL

CRUSHED SURFACING BASE COURSE HMA CL. 1/2 IN. PG 64-22 SOD INSTALLATION CEMENT CONC. TRAFFIC CURB & GUTTER CEMENT CONC. PEDESTRIAN CURB CEMENT CONC. CURB RAMP TYPE PERPENDICULAR B

$ $ $ $ $ $ $ $ $

8,700.00 13.00 13.00 23.00 26.00 85.00 30.00 43.00 43.00 $2,700.00

$ $ $ $ $ $ $ $ $ $

7,500.00 35.00 35.00 62.00 70.00 235.00 65.00 65.00 65.00 4,000.00

BID OPTION 2 - 31ST & THORNHILL 1B 2B 3B 4B 5B 6B 7B 8B 9B 10B 11B 12B 13B 14B 15B 16B 17B 18B 18B 20B 21B 22B 23B 24B

L.S. S.Y. L.F. S.Y. C.Y. TON S.Y. TON L.S. EACH EST. S.Y. L.F. S.F. L.F. L.S. L.S. S.Y. EACH EST. L.S. CALC. L.S. EACH

1 24 50 25 10 6 67 30 1 2 1 15 30 67 72 1 1 25 2 1 1 1 1 2

MOBILIZATION REMOVING CEMENT CONC. SIDEWALK REMOVING CEMENT CONC. CURB AND GUTTER REMOVING ASPHALT CONC. PAVEMENT ROADWAY EXCAVATION INCL. HAUL CRUSHED SURFACING BASE COURSE

PLANING BITUMINOUS PAVEMENT HMA CL. 1/2 IN. PG 64-22 ESC LEAD INLET PROTECTION EROSION/WATER POLLUTION CONTROL SOD INSTALLATION CEMENT CONC. TRAFFIC CURB & GUTTER PLASTIC CROSSWALK LINE PLASTIC STOP LINE PERMANENT SIGNING PROJECT TEMPORARY TRAFFIC CONTROL CEMENT CONC. SIDEWALK CEMENT CONC. CURB RAMP TYPE PERPENDICULAR B ROADSIDE CLEANUP TRIMMING AND CLEANUP MINOR CHANGE ROADWAY SURVEYING PLASTIC CHEVRON

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

2,500.00 13.00 13.00 100.00 23.00 26.00 2.00 85.00 500.00 100.00 250.00 30.00 43.00 10.00 20.00 500.00 1,000.00 45.00 2,700.00 250.00 250.00 500.00 2,000.00 300.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

2,500.00 312.00 650.00 2,500.00 230.00 156.00 134.00 2,550.00 500.00 200.00 250.00 450.00 1,290.00 670.00 1,440.00 500.00 1,000.00 1,125.00 5,400.00 250.00 250.00 500.00 2,000.00 600.00

SUBTOTAL

$

25,457.00

2.00 85.00 20.00 500.00 300.00

$ $ $ $ $

160.00 1,020.00 1,440.00 500.00 600.00

SUBTOTAL $

3,720.00

2.00 85.00 20.00 500.00 300.00

160.00 1,020.00 1,440.00 500.00 600.00 3,720.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

5,000.00 35.00 35.00 45.00 62.00 70.00 120.00 225.00 550.00 100.00 250.00 65.00 65.00 25.00 25.00 5,000.00 2,500.00 80.00 4,000.00 250.00 1,500.00 500.00 5,000.00 750.00

BID OPTION 3 - LARKSPUR Dr. 1C 2C 3C 4C 5C

S.Y. TON L.F. L.S. EACH

80 12 72 1 2

PLANING BITUMINOUS PAVEMENT HMA CL. 1/2 IN. PG 64-22 PLASTIC STOP LINE PERMANENT SIGNING PLASTIC CHEVRON

$ $ $ $ $

$ $ $ $ $

120.00 279.00 25.00 5,000.00 250.00

BID OPTION 4 - 31st Ave SE LOCATION TBD 1D 2D 3D 4D 5D

S.Y. TON L.F. L.S. EACH

80 12 72 1 2

PLANING BITUMINOUS PAVEMENT HMA CL. 1/2 IN. PG 64-22 PLASTIC STOP LINE PERMANENT SIGNING PLASTIC CHEVRON

$ $ $ $ $

$ $ $ $ $ $ SUBTOTAL $

BASE BASE+ 1 BASE+ 2 BASE+ 3 BASE+ 4 BASE+1,2 BASE+1,2,3 BASE+1,2,3,4

$ $ $ $ $ $ $ $

82,783.00 93,681.00 108,240.00 86,503.00 86,503.00 119,138.00 122,858.00 126,578.00

$ $ $ $ $

120.00 249.00 25.00 2,500.00 250.00