Cane Creek Stream Restoration Site EEP Project #92325 Contract # D06002 USACE Action ID #SAW-200703012 DWQ 404 #08-0358

Monitoring Year 05/Closeout

Project Type: Stream Restoration

Submitted: January 2014

Table 1a. Project Setting and Classifications Cane Creek Stream Restoration Site County Person General Location Semora Basin Roanoke River Physiographic Region Piedmont USGS Hydro Unit 03010104061040 NCDWQ Sub-basin 03-02-05 Trout Water No Project Performers Source Agency Provider Designer Monitoring Firm Planting

NCEEP KCI Technologies KCI Technologies KCI Technologies Bruton Nurseries & Landscapes NCEEP

Property Interest Holder

Table 1b. Project Activity and Reporting History Cane Creek Stream Restoration Site Activity or Report Restoration Plan Final Design Construction Planting - Stream Mitigation Plan / As-Built (Year 0 Monitoring - Baseline) Monitoring Year 01 Maintenance on pools on T4-1, T4-2, & T-6 Installed rock and stabilized swale on T4-1, T4-2, & T7-3 Bank repair on T1-3 Monitoring Year 02 Supplemental Planting Monitoring Year 03 Monitoring Year 04 Supplemental Planting Maintenance was conducted to stabilize most of the areas of slope erosion Monitoring Year 05 Beaver dam removal

Data Collection Complete

Completion or Delivery

2007 2007 N/A N/A Jan 09 Dec 09

Dec 07 Dec 07 Dec 08 Dec 08 May 09 Dec 09 2009 2009 2009 Jan 11 2010/2011 Jan 12 Dec 12 Mar 12

Jan 11 Nov 11 Jul 12

2012 Sep 13

Dec 13 Jan 13

 

Cane Creek Stream Restoration Site

i

KCI Associates of North Carolina 2013 - MY05/Closeout

TABLE OF CONTENTS 1.0

PROJECT SETTING AND BACKGROUND SUMMARY ..........................1

2.0

PROJECT GOALS AND OBJECTIVES ........................................................1

3.0

SUCCESS CRITERIA ......................................................................................2 Cross Section Plots .......................................................................................................13 Longitudinal Profiles ....................................................................................................17

4.0

EEP RECOMMENDATIONS AND CONCLUSIONS .................................28 Pre-Construction Photos (2007) ....................................................................................29 Post Construction Photos MY-05 .................................................................................31 LIST OF TABLES

Table 1a. Table 1b. Table 2. Table 3. Table 4. Table 5. Table 6. Table 7.

Project Setting and Classifications................................................................................i Project Activity and Reporting History ........................................................................i Success Criteria .............................................................................................................2 Project Assets ................................................................................................................3 Morphology and Hydraulic Monitoring Summary .......................................................21 Hydrological (Bankfull) Verifications ..........................................................................25 Stem Counts arranged by Plots .....................................................................................26 Vegetation History: Stems/Acre Planted and Total with Volunteers ...........................27 LIST OF FIGURES

Figure 1. Figure 2. Figure 3. Figure 4. Figure 5.

Vicinity Map .................................................................................................................5 Project Watershed .........................................................................................................6 Current Condition Plan View........................................................................................7 Maintenance and Supplemental Planting ......................................................................9 Monitoring Features ......................................................................................................11 Appendix A – Watershed Planning Summary Appendix B – Land Ownership and Protection Appendix C – NCDWQ 401/USACE Section 404 Appendix D – Debit Ledger

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

1.0

PROJECT SETTING AND BACKGROUND SUMMARY

The Cane Creek Tributary Site (CCTS) is a full-delivery project that was developed for the North Carolina Ecosystem Enhancement Program (EEP). The project restored, enhanced, and preserved 19,059 linear feet on an Unnamed Tributary to Cane Creek and other associated tributaries, and included planting a functional Piedmont Alluvial Forest floodplain community along with Mesic Mixed Hardwood Forest to develop an effective riparian buffer. Prior to restoration, the project streams had been impacted by livestock and land clearing. These impacts resulted in bank erosion on all of the tributaries and severe incision on selected tributaries. There were also spoil piles remaining from land clearing, which disrupted overland flow paths. The streams had experienced bank erosion, which led to excessive sediment throughout the site. Overall the CCTS contained a series of tributaries in varying degrees of instability. Since construction, supplemental planting has occurred on portions of the site to address poor vigor and survivability in the buffer. Supplemental planting was conducted at the site during the 2010/2011, and 2012 dormant season. Stream maintenance was conducted at the site in 2009 and 2012. The maintenance involved, isolated terrace slope stabilization, bank stabilization, and other small areas of maintenance. These areas were generally isolated and caused by local issues associated with overland flow or concentrated runoff from outside of the easement. They were not indicative of any widespread instability at the site. Overall the site is stable and well vegetated.

2.0

PROJECT GOALS AND OBJECTIVES The goals and objectives of the restoration project are as follows: Project Goals:  Restore the stream’s riparian buffer.  Create a stable network of headwater streams. Project Objectives:  Plant a functional Piedmont Alluvial Forest floodplain community along with a Mesic Mixed Hardwood Forest to create an effective riparian buffer.  Arrest bed elevation lowering and stabilize seep outlets.  Stop bank erosion by developing the appropriate channel dimension and stabilizing with vegetation.  Remove relic spoil piles that disrupt overland flow paths.  Exclude livestock from the riparian areas with fencing.

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

1

3.0

SUCCESS CRITERIA Table 2. Success Criteria Cane Creek Stream Restoration Site Feature Success Criteria Stream Minimal changes to the measured stream characteristics, demonstrating system stability. At least two bankfull events occurring in separate years over the course of the monitoring period. Vegetation Average of 260 stems/acre, as indicated by permanent vegetation plots after 5 years of monitoring.

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

2

Table 3. Project Assets Cane Creek Stream Restoration Site

Project Segment / Reach ID T1-1 and T1-2 T1-3, T1-4 and T1-5 T2-1 T2-2 T2-3 T2-4 T3-1 T3-2 T4-1 and T4-2 T5-1 T5-2 T6A T6B-1 T6B T6AB T6C-1 T6C-2 T6C-3 T6C and T6 T7A-1 T7A T7B T7C T7-1 T7-2 T7-3 T7-4 T7-5 T7-6 and T7-7 T8A-1 T8A T8B T8-1 T8 T9 T10-1 T10-2

PreRestoration (linear feet) 1,087 1,688 305 227 160 151 107 1,457 1,979 244 118 89 162 103 30 297 80 82 1,455 62 136 125 42 469 331 2,023 1,246 185 1,365 25 110 59 94 449 369 1,300 282

Mitigation Approach EI R EII R EI R EI R R EII R P EII R P P P R P EII P EII EII EI R R EI R EI P EII P P EI EI EII EI

Cane Creek Stream Restoration Site

As - Built Linear Fottage 1,150 1,617 305 195 150 200 85 1,612 2,281 264 132 90 162 104 31 297 80 82 1,425 62 136 125 42 525 332 2,129 1,242 147 1,438 25 123 59 94 438 368 1,300 294

Stream Mitigation Units 725 SMU* 1,617 SMU 122 SMU 195 SMU 100 SMU 180 SMU* 57 SMU 1,592 SMU* 2,261 SMU* 97 SMU* 132 SMU 36 SMU 32 SMU 42 SMU 31 SMU 59 SMU 16 SMU 16 SMU 1,405 SMU* 12 SMU 54 SMU 25 SMU 17 SMU 210 SMU 221 SMU 2,109 SMU* 828 SMU 147 SMU 945 SMU* 5 SMU 49 SMU 12 SMU 19 SMU 292 SMU 245 SMU 520 SMU 196 SMU

KCI Associates of North Carolina 2013 - MY05/Closeout

3

Table 3. Project Assets Continued Cane Creek Stream Restoration Site

Project Segment / Reach ID

Pre-Restoration (linear feet)

Mitigation As - Built Stream Mitigation Approach Linear Fottage Units

Preservation Total Enhancement II Total Enhancement I Total Restoration Total Total of All Reaches

986

196 SMU*

2,889 5,497 9,769 19,141

1,147 SMU* 3,609 SMU* 9,669 SMU* 14,621 SMU*

Mitigation Unit Summations Stream (lf) 14,621

Riparian Wetland Nonriparian Total Wetland Wetland (Ac) (Ac) (Ac) 0 0 0

Buffer (Ac) 0

R = Restoration EI = Enhancement I EII = Enhancement II P = Preservation * These SMUs have been calculated by excluding the easement exceptions, which include ford crossings for the landowner

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

4

VIRGINIA

Person County, North Carolina W in

ee k

119

CASWELL COUNTY

Bran don Cre

ek

ns

Cr

R n Cun ing ha m

Semora

PERSON COUNTY

d

_ ^

Ca n e

Cre e k

r e Cr ee k l go Ki

57 Hyco Lake

VIRGINIA

_ ^ CASWELL

PERSON Lit t

le Du

GRANVILLE

k

DURHAM

r ee

ORANGE

ck C

ALAMANCE

Figure 1. Vicinity Map

_ ^

Project Site Location

²

Major Roads Other Roads

Major Streams and Rivers

Major Lakes and Reservoirs County Boundaries

1:63,360 1 inch equals 1 miles

1

0.5

5

0

1

Miles

Milton Quad

Alton Quad

HUC 03010104040040

HUC 03010104032030

HUC 03010104061040

Leasburg Quad

Olive Hill Quad

Figure 2. Project Watershed Project Streams

USGS Quadrangle Boundaries

Other Streams

²

Project Watershed (1.32 sq. miles) 14-digit HUC Boundaries Source: USGS Topographic Quadrangles Alton (1968), Leasburg (1968), Milton (1983), and Olive Hill (1968)

2,000 6

1:24,000 1 inch equals 2,000 feet 1,000 0

2,000 Feet

7

8

9

10

11

12

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

13

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

14

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

15

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

16

Cane Creek Tributary Site Longitudinal Profile 1 Tributary 1, MY-05 Stations 11+70 - 19+10

512 511 510 509

Elevation (ft)

508 507 506 505 504 503 502 501 500

1150

1200

1250

1300

1350

Bankfull

1400

1450

1500

Water Surface

1550

Station (ft)

1600

MY-01

1650

1700

MY-02

1750

MY-03

1800

MY-04

1850

1900

1950

MY-05

Cane Creek Stream Restoration Site Longitudinal Profile 2 Tributary 1, MY-05 Stations 23+18 - 28+66 500 499

Elevation (ft)

498 497 496 495 494 493 492 2300

2350

2400

2450

2500

2550

2600

2650

2700

2750

2800

2850

2900

Station (ft) Bankfull

Water Surface

As-Built

MY-01

Cane Creek Stream Restoration Site

MY-02

MY-03

MY-04

MY-05

KCI Associates of North Carolina 2013 - MY05/Closeout

17

Elevation (ft)

Cane Creek Tributary Site Longitudinal Profile Tributary 3, MY-05 Stations 71+15 - 76+44

517 516 515 514 513 512 511 510 509 508 507 506 505 7100

7150

7200

7250 Bankfull

7300 Water Surface

7350 Station (ft) 7400 As-Built

MY-01

7450 MY-02

7500

7550

MY-03

MY-04

7600

7650

7700

MY-05

Cane Creek Tributary Site Longitudinal Profile Tributary 4, MY-05 Stations 93+75 - 102+33

512 510 508 Elevation (ft)

506 504

Localized Scour

502 500 498 496 494 9350

9450

9550

9650 Bankfull

9750 As-Built

Station (ft) MY-01

Cane Creek Stream Restoration Site

9850 MY-02

9950 MY-03

MY-04

10050 MY-05

10150

10250

WS

KCI Associates of North Carolina 2013 - MY05/Closeout

18

Cane Creek Tributary Site Longitudinal Profile Tributary 6, MY-05 Stations 125+75 - 131+28

514 512 510

Elevation (ft)

508 506 504 502 500 498 496 494 12550

12650

12750 Bankfull

Station (ft) 12850

Water Surface

As-Built

MY-01

12950 MY-02

MY-03

13050 My-04

13150

MY-05

Cane Creek Stream Restoration Site Longitudinal Profile 1 Tributary 7, MY-05 Stations 152+25 - 160+25 524 522

Elevation (ft)

520 518 516 514 512 15200

15300

15400 Bankfull

15500 Water Surface

15600 Station (ft) As-Built

MY-01

Cane Creek Stream Restoration Site

MY-02

15700

15800 MY-03

MY-04

15900

16000

MY-05

KCI Associates of North Carolina 2013 - MY05/Closeout

19

Cane Creek Tributary Site Longitudinal Profile 2 Tributary 7, MY-05 Stations 180+00 - 187+37

Elevation (ft)

484

474

464 18000

18100

18200 Bankfull

18300 Water Surface

Station (ft) MY-01

Cane Creek Stream Restoration Site

18400 MY-02

18500 MY-03

18600 MY-04

18700

18800

MY-05

KCI Associates of North Carolina 2013 - MY05/Closeout

20

Table 4a. Morphology and Hydraulic Monitoring Summary Cane Creek Stream Restoration Site Cross-Section 1 Parameter Pool T1-3 Reach MY0 MY1 MY2 MY3 Dimension Bankfull Width (ft) 12.6 12.2 13.4 14.9 Floodprone Width (ft) Bankfull Mean Depth (ft) 1.6 1.7 2.4 2.4 2.9 3.5 3.6 Bankfull Max Depth (ft) 2.8 2 Bankfull Cross-Sectional Area (ft ) 20.2 20.9 32.2 35.5 Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Substrate 2 2 d50 (mm) 5 15 34 d84 (mm) 15

MY4 MY5 MY0 MY1 14.0 15.3 17.4 17.8 39 42 2.5 2.2 1.1 1.1 3.7 3.5 2.3 1.9 35.2 33.1 18.9 19.9 16.0 15.9 2.4 2.2 1.0 1.0 12 54

8 19

15 40

8 43

Cross-Section 2 Riffle T1-4 MY2 MY3 18.8 18.0 42 41 1.2 1.0 2.9 2.2 23.3 18.7 15.2 17.3 2.2 2.3 1.0 1.0 8 43

23 38

Table 4b. Morphology and Hydraulic Monitoring Summary continued Cane Creek Stream Restoration Site Cross-Section 4 Cross-Section 5 Parameter Riffle Riffle Reach T1-5 T2-2 MY0 MY1 MY2 MY3 MY4 MY5 MY0 MY1 MY2 MY3 Dimension 7.5 6.7 6.5 Bankfull Width (ft) 15.3 15.0 17.5 15.6 17.1 20.7 7.7 37 37 45 42 42 21 21 21 Floodprone Width (ft) 42 21 1.5 1.2 1.2 1.1 0.9 0.6 0.6 0.6 0.7 Bankfull Mean Depth (ft) 1.5 2.4 2.3 2.3 2.2 2.0 1.2 1.1 1.0 Bankfull Max Depth (ft) 2.1 1.2 2 4.7 4.2 4.2 Bankfull Cross-Sectional Area (ft ) 22.2 22.1 21.2 18.8 19.3 19.4 5.4 Width/Depth Ratio 10.5 10.2 14.4 12.9 15.2 22.1 11.0 12.0 10.7 10.1 2.5 2.1 2.9 2.5 2.0 2.8 3.1 3.2 Entrenchment Ratio 2.7 2.7 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Bank Height Ratio 1.0 1.0 Substrate d50 (mm) 24 14 27 26 14 1 27 17 10 14 41 76 31 12 d84 (mm) 44 Bdrk Bdrk 59 30 31

Cane Creek Stream Restoration Site

MY4 MY5 MY0 MY1 18.2 14.1 14.2 14.3 40 40 0.9 1.0 1.5 1.6 2.0 2.0 2.9 2.5 17.0 14.8 21.9 23.5 19.5 13.4 2.6 2.8 1.0 1.0 10 21

19 36

2 12

9 30

MY4 MY5 MY0 MY1 7.8 12.3 12.6 23 0.7 0.9 1.1 1.3 2.1 2.2 5.1 13.3 11.0 11.9 2.9 1.0 11 32

5 21

1.10 10.00

Cross-Section 3 Pool T1-4 MY2 MY3 14.4 13.2 1.4 1.6 3.0 3.4 19.7 20.5 9 30

3 35

Cross-Section 6 Pool T3-2 MY2 MY3 13.5 12.3 1.1 1.1 2.3 2.3 13.3 12.9 0.62 0.62

0.06 1.20

MY4 MY5 14.0 12.8 1.4 1.1 3.2 2.8 19.6 14.7 22 64

6 38

MY4 MY5 14.4 15.1 1.0 0.9 2.3 2.2 15.0 13.0 0.08 0.76

0.06 0.06

KCI Associates of North Carolina 2013 - MY05/Closeout

21

Table 4c. Morphology and Hydraulic Monitoring Summary continued Cane Creek Stream Restoration Site Cross-Section 7 Cross-Section 8 Parameter Riffle Riffle T3-2 T3-2 Reach MY0 MY1 MY2 MY3 MY4 MY5 MY0 MY1 MY2 MY3 Dimension 8.8 9.4 7.9 8.9 8.8 8.2 8.3 10.3 9.3 Bankfull Width (ft) 7.8 22 22 22 24 23 26 23 Floodprone Width (ft) 21 24 26 Bankfull Mean Depth (ft) 0.5 0.5 0.5 0.6 0.5 0.4 0.5 0.6 0.5 0.4 0.9 0.9 0.9 0.9 0.7 1.0 1.0 0.9 Bankfull Max Depth (ft) 0.9 0.9 2 4.4 4.7 4.5 4.5 3.4 4.2 5.8 4.7 3.6 Bankfull Cross-Sectional Area (ft ) 3.9 Width/Depth Ratio 15.6 17.6 18.8 13.9 17.7 22.8 16.4 18.3 18.4 18.7 2.5 2.3 2.7 2.7 2.6 2.5 2.8 2.8 Entrenchment Ratio 2.7 2.9 1.0 1.0 1.0 1.0 0.9 1.0 1.0 1.0 Bank Height Ratio 1.0 1.0 Substrate d50 (mm) 0.30 1.30 1.30 0.33 0.41 0.06 26 18 18 16 41 41 33 18 50 50 58 2 d84 (mm) 7 42

MY4 MY5 MY0 MY1 7.8 7.4 8.3 8.5 24 21 25 24 0.4 0.4 0.5 0.6 0.8 0.6 1.1 1.0 3.5 2..7 4.1 4.6 17.4 20.3 17.6 15.0 3.0 2.8 3.0 2.8 1.0 1.0 1.0 1.0 6 41

9 20

0 13

2 35

Cross-Section 9 Riffle T4-1 MY2 MY3 10.4 10.1 25 26 0.5 0.5 1.3 1.2 5.3 4.9 20.4 20.8 2.4 2.6 1.0 1.0 7 17

19 45

MY4 MY5 9.7 7.1 29 29 0.5 0.5 1.2 1.0 4.9 3.5 19.2 14.4 3.0 4.1 1.0 1.0 7 22

7 38

Table 4d. Morphology and Hydraulic Monitoring Summary continued Cane Creek Stream Restoration Site Cross-Section 10 Cross-Section 11 Cross-Section 12 Parameter Riffle Riffle Pool T4-2 T4-2 T5-2 Reach MY0 MY1 MY2 MY3 MY4 MY5 MY0 MY1 MY2 MY3 MY4 MY5 MY0 MY1 MY2 MY3 MY4 MY5 Dimension 9.5 8.3 9.3 8.0 8.1 6.7 6.8 6.1 6.6 7.3 10.7 10.3 10.5 9.9 10.1 9.8 Bankfull Width (ft) 9.1 8.6 21 21 22 22 22 22 22 21 21 22 Floodprone Width (ft) 24 26 0.5 0.5 0.4 0.5 0.4 1.0 0.9 0.9 1.0 0.8 1.1 1.3 1.4 1.3 1.3 Bankfull Mean Depth (ft) 0.6 0.9 1.1 0.8 0.8 0.8 0.9 0.9 1.4 1.6 1.2 1.4 1.4 2.5 2.8 2.8 2.8 2.6 Bankfull Max Depth (ft) 1.2 1.7 2.5 4.3 4.1 3.9 4.2 4.0 7.9 6.4 6.4 5.7 6.3 6.0 12.3 11.2 13.6 13.4 12.9 12.5 Bankfull Cross-Sectional Area (ft2) 5.9 21.0 16.8 22.2 15.2 16.4 7.0 7.2 6.5 6.9 8.9 Width/Depth Ratio 14.0 9.4 2.2 2.6 2.3 2.8 2.7 3.3 3.2 3.5 3.2 3.0 Entrenchment Ratio 2.6 3.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Bank Height Ratio 1.0 1.0 Substrate d50 (mm) 8 10 25 17 12 8 1 3 2 10 29 23 20 35 1 35 0 5 43 39 26 11 19 10 6 41 84 39 43 59 16 Bdrk 25 1 22 d84 (mm) 39 Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

22

Table 4e. Morphology and Hydraulic Monitoring Summary continued Cane Creek Stream Restoration Site Cross-Section 13 Cross-Section 14 Parameter Riffle Riffle T5-2 T6 Reach MY0 MY1 MY2 MY3 MY4 MY5 MY0 MY1 MY2 MY3 MY4 MY5 MY0 Dimension 5.6 4.0 7.0 6.1 6.0 6.9 5.9 7.4 7.7 6.9 Bankfull Width (ft) 5.9 7.1 4.1 24 23 35 36 23 23 27 26 38 Floodprone Width (ft) 21 19 26 0.3 0.4 0.9 1.1 0.4 0.4 0.3 0.6 0.8 0.8 Bankfull Mean Depth (ft) 0.4 0.5 0.8 0.8 0.7 1.7 1.6 0.7 0.9 0.9 1.4 1.8 1.8 0.8 1.2 Bankfull Max Depth (ft) 0.8 2 2.4 2.4 2.6 1.8 1.4 1.7 3.4 4.7 5.9 5.8 6.6 6.5 3.1 Bankfull Cross-Sectional Area (ft ) 7.4 5.7 Width/Depth Ratio 14.5 15.0 18.3 19.3 22.4 9.4 14.8 11.7 10.0 8.2 4.3 5.8 5.0 5.9 3.8 3.3 4.6 3.5 3.4 5.5 Entrenchment Ratio 3.6 2.6 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Bank Height Ratio 1.0 1.0 Substrate d50 (mm) 0.20 0.68 2.80 1.30 0.62 0.52 44 7 10 2 4 13 4 2 28 42 1 2 30 26 17 13 31 d84 (mm) 4 57 20 Table 4f. Morphology and Hydraulic Monitoring Summary continued Cane Creek Stream Restoration Site Cross-Section 16 Cross-Section 17 Parameter Riffle Pool T6 T7-3 Reach MY0 MY1 MY2 MY3 MY4 MY5 MY0 MY1 MY2 MY3 MY4 Dimension 7.3 6.0 7.4 8.8 9.8 10.1 9.4 6.9 7.5 8.1 Bankfull Width (ft) 6.3 18 18 19 19 21 Floodprone Width (ft) 17 1.1 0.7 0.7 1.2 1.4 0.6 0.6 0.8 1.7 1.8 Bankfull Mean Depth (ft) 0.6 2.0 1.2 1.2 2.0 2.3 1.2 1.2 1.5 2.6 2.4 Bankfull Max Depth (ft) 0.9 4.1 4.4 4.6 6.2 7.7 10.8 13.3 17.3 17.3 Bankfull Cross-Sectional Area (ft2) 3.6 5.2 8.8 10.5 10.8 12.2 10.6 Width/Depth Ratio 11.0 3.0 2.4 2.7 2.5 2.6 Entrenchment Ratio 2.7 1.0 1.0 1.0 1.0 1.0 Bank Height Ratio 1.0 Substrate d50 (mm) 35 19 10 9 45 22 0.30 0.39 0.57 0.12 0.46 4 52 34 29 13 23 1 7 d84 (mm) 56 Bdrk 45 Cane Creek Stream Restoration Site

Cross-Section 15 Pool T6 MY1 MY2 MY3 6.0 5.0 5.1 0.7 0.7 0.7 1.4 1.4 1.4 3.9 3.6 3.7 10 35

23 44

25 54

MY5 MY0 12.7 9.0 18 0.8 1.6 1.3 2.4 20.4 7.2 11.6 2.0 1.0 -

Cross-Section 18 Riffle T7-3 MY1 MY2 MY3 9.2 8.2 8.1 19 19 19 0.8 0.9 0.9 1.4 1.5 1.7 7.3 7.4 7.2 11.6 9.3 8.9 2.0 2.3 2.3 1.0 1.0 1.0

0.13 21.00 16 58

32.00 100

7.30 63

0.56 20

MY4 MY5 5.2 4.2 0.7 0.7 1.3 1.1 3.6 3.0 30 59

2 20

MY4 MY5 8.4 8.9 21 21 0.8 0.9 1.5 1.7 6.8 7.9 10.4 10.0 2.5 2.4 1.0 1.0 0.82 20

0.76 25

KCI Associates of North Carolina 2013 - MY05/Closeout

23

Table 4g. Morphology and Hydraulic Monitoring Summary Cane Creek Stream Restoration Site Cross-Section 19 Parameter Riffle T7-3 Reach MY0 MY1 MY2 MY3 Dimension Bankfull Width (ft) 9.1 8.7 8.7 9.9 Floodprone Width (ft) 15 15 15 18 0.6 0.6 0.6 Bankfull Mean Depth (ft) 0.7 Bankfull Max Depth (ft) 0.9 0.8 0.9 1.4 2 6.4 4.8 5.2 6.4 Bankfull Cross-Sectional Area (ft ) Width/Depth Ratio 12.9 15.8 14.6 15.3 Entrenchment Ratio 1.7 1.7 1.7 1.8 1.0 1.0 1.0 Bank Height Ratio 1.0 Substrate d50 (mm) 25 33 2 2 42 74 51 d84 (mm) 19

Cane Creek Stream Restoration Site

MY4 9.6 18 0.6 1.3 6.1 15.1 1.9 1.0

MY5 7.3 18 0.4 0.8 3.0 17.8 2.5 1.0

MY0 11.5 21 0.9 1.3 10.7 12.4 1.9 1.0

MY1 11.9 21 0.8 1.3 9.6 14.8 1.7 1.0

9 59

9 60

11 34

41 Bdrk

Cross-Section 20 Riffle T7-5 MY2 MY3 11.8 12.0 21 21 0.8 0.7 1.5 1.5 8.9 8.3 15.6 17.3 1.7 1.7 1.0 1.0 33 75

38 160

MY4 13.1 23 0.7 1.5 8.9 19.3 1.8 1.0

MY5 12.8 23 0.6 1.5 8.2 20.0 1.8 1.0

34 150

71 150

KCI Associates of North Carolina 2013 - MY05/Closeout

24

Table 5. Verification of Bankfull Events Cane Creek Stream Restoration Site Date of Data Date of Collection Occurrence Method 8/4/2009 5/28/2009 Stream Gauge 8/4/2009 6/5/2009 Stream Gauge 10/13/2009 9/21/2009 Stream Gauge 10/13/2009 9/28/2009 Stream Gauge 10/13/2009 10/9/2009 Stream Gauge 7/22/2010 3/22/2010 Stream Gauge 7/22/2010 5/28/2010 Stream Gauge 5/27/2011 4/16/2011 Stream Gauge 7/25/2012 7/14/2012 Stream Gauge 7/25/2012 7/22/2012 Stream Gauge 7/23/2013 1/14/2013 Stream Gauge 7/23/2013 5/6/2013 Stream Gauge 7/23/2013 7/31/2013 Stream Gauge

Photo taken July 24, 2013, depicting wrack lines on T7 floodplain near Stream Gauge 2.

Cane Creek Stream Restoration Site Yanceyville 4 SE, NC Weather Station 2013 Monthly Rainfall

10 9 8

Rainfall (in)

7 6 5 4 3 2 1 Dec-13

Nov-13

Oct-13

Sep-13

Month

Aug-13

Jul-13

Jun-13

May-13

Apr-13

Mar-13

Feb-13

Jan-13

0

Rainfall

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

25

Table 6. Stream Riparian Buffer Stem Density and Species Count by Plot Cane Creek Stream Restoration Site Species 1

Asimina triloba Betula nigra Carya ovata* Cornus amomum Diospyros virginiana Fraxinus pennsylvanica Juglans nigra Liriodendron tulipifera Platanus occidentalis Quercus falcata Quercus lyrata Quercus michauxii Quercus pagoda Quercus phellos* Salix nigra Salix sericea Total (Year 5) Average Density (Stems/Acre)

2

3

4

5

6

7

Plots

8

9

1

10

11

1

12

13

14

15

2

18

19

20

5 1 2 3 1

3 2 1

2 5 2

2 4

6

1

6

1

1 3 1

2

4

2 1 2

1 1 1

17

3

1 1 1

16

1 1

1 4

3

1

6

4

14 1

3

5

1

1 1

2

2 1

2

2 3 1

7

1

1

1 1

3

3 1 2 2 5 3 1 6 1 1 1 10 9 13 16 5 8 9 4 10 6 11 12 5 16 8 12 3 5 8 6 405 364 526 647 202 324 364 162 405 243 445 486 202 647 324 486 121 202 324 243 Average Total Density (Stems/Acre) *Percentages greater than 100% are due to previously unknown species being positively identified.

Cane Creek Stream Restoration Site

Total Year 5

5 6 6 56 20 4 6 3 9 19 1 10 1 7 3 20 176 356

KCI Associates of North Carolina 2013 - MY05/Closeout

26

Table 7. Vegetation History: Stems/Acre Planted and Total with Volunteers Cane Creek Stream Restoration Site MY-03 MY-04 MY-05 MY-00 MY-01 MY-02 Plot Number Planted Planted Planted Planted Total Planted Total Planted Total 1,133 840 526 526 2,630 445 2,064 405 3,359 1 526 440 364 364 4,452 364 7,001 364 8,620 2 526 10,927 526 11,291 647 520 526 3,440 526 3 647 14,973 647 13,517 850 680 647 8,013 607 4 202 1,295 202 2,104 607 440 243 1,295 243 5 324 728 324 1,093 931 680 486 769 486 6 486 4,128 364 4,937 809 720 647 3,925 647 7 162 688 162 1,538 445 320 162 526 202 8 445 1,942 405 2,469 809 640 486 2,509 486 9 364 1,052 243 931 567 440 364 890 405 10 486 1,295 445 1,902 850 720 526 1,255 526 11 486 2,792 486 2,995 607 560 526 3,116 526 12 202 931 202 1,093 445 240 202 1,052 202 13 647 14,326 647 12,829 971 800 647 7,891 688 14 324 11,695 324 11,331 486 400 324 7,365 364 15 486 1,295 486 1,133 931 760 486 1,659 769 16 121 971 121 1,416 486 320 202 1,052 243 17 243 18,454 202 18,049 567 320 283 8,701 324 18 324 5,949 324 5,301 647 600 364 4,168 324 19 283 1,457 243 1,578 486 480 283 931 324 20 378 5,198 356 5,374 690 546 439 415 3,282 Site Average

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

27

4.0

EEP RECOMMENDATIONS AND CONCLUSIONS

The stream assessment found the stream to be stable overall. There are isolated areas of erosion on the stream banks and the side slopes, but there are no systematic problems that indicate that the project streams are becoming unstable. It is also important to note that all of the streams across the site have grade control from in-stream structures, and in some instances significant bedrock. With multiple bankfull events since construction, the stream has met the success criterion of at least two bankfull events occurring in separate years over the course of the monitoring period. There are some plots with low planted stem densities, including five plots with planted stem densities below 260 stems/acre: plots 5, 8, 13, 17, and 18. When including volunteers in these five plots, all plots are above the 260 total stems/acre density. The monitored vegetation plots within the stream buffer revealed that the planted vegetation is growing well with an average of 356 stems/acre. The overall vegetation assessment found the site has met the vegetative success criteria for monitoring year 5. Overall the stream and the site's vegetation condition indicate that it is on a path to success. The EEP recommends that this site be closed out.

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

28

Pre-Construction Photos (2007)

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

29

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

30

Post-Construction Photos MY-05

PP#05d – MY05 – 12/11/13

PP#5d – MY05 – 12/11/13

PP#09d – MY05 – 12/11/13

PP#15u – MY05 – 12/11/13

PP#17u – MY05 – 12/11/13

PP#28u – MY05 – 12/11/13

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

31

PP#30d – MY05 – 12/11/13

PP#33d – MY05 – 12/11/13

PP#40d – MY05 – 12/11/13

PP#49d – MY05 – 12/11/13

PP trib 1.2 upstream – MY05 – 12/11/13

PP trib 2 downstream – MY05 – 12/11/13

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

32

Appendix A Watershed Planning Summary To be completed by the EEP Watershed Planner.

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

Appendix B Land Ownership and Protection To be completed by the EEP Property Section.

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

Appendix C NCDWQ 401/USACE Section 404

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout

Appendix D Debit Ledger Closeout Coordinator to obtain.

Cane Creek Stream Restoration Site

KCI Associates of North Carolina 2013 - MY05/Closeout