1.0 Detailed Definition of Alternatives 1.1

Introduction

This chapter provides supplemental information on the four alternatives, including both physical and operational characteristics (e.g. service plans) as well as additional route network and facility maps. The chapter also provides a comparative matrix of the four alternatives. The chapter contains the following information:      

Maps of route network and station stops for each alternative; Number of trips by end terminal for each alternative; Summary table of the station stops for all alternatives; Two comparative matrixes of the physical and operational characteristics of the four alternatives; Additional alignment and physical characteristics of the Streetcar Build Alternative; and Conceptual site plan for the streetcar’s Operations and Maintenance (O&M) Facility in Pentagon City.

The chapter is organized as followed:

1.2

    

1.5

Table 1-3: Streetcar Build Alternative: Number of Trips by End Terminal Table 1-4: Streetcar Build Alternative: Streetcar Alignment Information Table 1-5: Streetcar Build Alternative: Streetcar Facility Information Table 1-6: Streetcar Build Alternative: Pentagon City O&M Facility Information Figure 1-5: Streetcar Build Alternative: Pentagon City Operation and Maintenance Facility Plan

Comparison of Alternatives

This section provides one figure and three tables that compare the operational and physical characteristics of each alternative. The following tables and figures are provided:    

Figure 1-6: TSM 1, TSM 2, and Streetcar Build Alternatives: Route Network Table 1-7: Stop Locations by Alternative Table 1-8: Physical and Operational Characteristics for each Alternative Table 1-9: Additional Transit Attributes by Alternative

No Build Alternative

This section provides operational information regarding the No Build Alternative. The following figures and tables are provided:  

1.3

Figure 1-1: No Build Alternative: Route Network Table 1-1: No Build Alternative: Number of Trips by End Terminal

TSM Alternatives

This section provides operational information regarding the two TSM Alternatives. The following figures and tables are provided:  

1.4

Figure 1-2: TSM Alternatives: Route Network Table 1-2: TSM Alternatives: Number of Trips by End Terminal

Streetcar Build Alternative

This section provides information on both the operational and physical characteristics, including information on the proposed Operations & Maintenance (O&M) facility, of the Streetcar Build Alternative. The following figures and tables are provided:  

Figure 1-3: Streetcar Alignment and and Background Bus Service Route Network Figure 1-4: Streetcar Build Alternative: Streetcar Alignment and Stop Locations

May 2012

1-1

Figure 1-1: No Build Alternative: Route Network

1-2

Columbia Pike Transit Initiative Alternatives Analysis/Environmental Assessment – Volume II

Table 1-1: No Build Alternative: Number of Trips by End Terminal Route

Peak Vehicles Per Hour – Eastbound

Mid-Day Vehicles Per Hour - Eastbound

1

1

2

0

1

1

n/a

n/a

Peak period, peak direction

4

0

All Day, Weekdays, Saturdays

2

2

n/a

n/a

2

0

n/a

n/a

3

2

15

6

All Day, 7 days per week

5

4

Peak period, peak direction only

3

0

Peak period, peak direction only

3

0

11

4

Terminal points

Hours of Service

Annandale to Pentagon Metro Station Culmore to Pentagon Metro Station (weekend service to Annandale) Annandale to Pentagon Metro Station Culmore to Pentagon Metro Station via Pentagon City Culmore to Pentagon and then into DC – Limited Stop Culmore to Pentagon Metro Station Columbia Heights West to Pentagon Metro Station Annandale to Pentagon Metro Express (via I-395) Culmore to Pentagon Metro Station via Pentagon City Ballston to Pentagon Metro Station (Note: 16L not included in schematic diagram next slide – does not run on Columbia Pike)

Weekday - all day Peak period, evenings, and weekends Weekday - all day

Pentagon 16A 16B 16D 16E 16F 16J 16K 16L 16P ART 42 Subtotal Pentagon

Evenings – each day

Weekend mornings only Weekday peak period/direction Sunday - all day All day, Weekdays and Saturdays

Pentagon City 16G 16H 16H/ Subtotal Pentagon City Other Routes

Columbia Heights West to Pentagon City Metro Station Skyline to Pentagon City Metro Station and then to Crystal City Skyline to Pentagon City Metro Station

16Y

Four Mile Run Road to Farragut Square

Peak period, peak direction only

7

0

ART 41

Columbia Heights West to Court House

All day, 7 days per week

4

4

ART 45

Four Mile Run Drive to Rosslyn

All Day – weekdays only

Streetcar

No service in No-Build

No service in No-Build

2

2

n/a

n/a

May 2012

1-3

Figure 1-2: TSM Alternatives: Route Network

1-4

Columbia Pike Transit Initiative Alternatives Analysis/Environmental Assessment – Volume II

Table 1-2: TSM Alternatives: Number of Trips by End Terminal (TSM 1 and TSM 2 Alternative have the same service pattern) Peak Vehicles Per Route Terminal points Hours of Service Hour – Eastbound Pentagon Annandale to Pentagon Metro Station (will run 16A Weekday - all day 1 as limited stop) Culmore to Pentagon Metro Station (weekend Peak period, evenings, and 16B 2 service to Annandale) weekends Annandale to Pentagon Metro Station (will run 16D Weekday - all day 1 as limited stop) Culmore to Pentagon Metro Station via Pentagon 16E Evenings – each day n/a City Culmore to Federal Triangle via Pentagon (will 16F Peak period, peak direction 4 remain as Limited Stop) 16J Culmore to Pentagon Metro Station All Day, Weekdays, Saturdays 2 Columbia Heights West to Pentagon Metro 16K Weekend mornings only n/a Station Weekday peak period, peak 16L Annandale to Pentagon Express (via I-395) 2 direction Culmore to Pentagon Metro Station via Pentagon 16P Sunday - all day n/a City ART 42 Ballston to Pentagon Metro Station All day, Weekdays and Saturdays 3 Subtotal Pentagon Pentagon City 16G* 16H* 16H/*

Skyline (TSM 2)/NOVA (TSM 1) to 12th Street South (Conference Center) Skyline (TSM 2)/NOVA (TSM 1) to Pentagon City and then to Crystal City Skyline (TSM 2)/NOVA (TSM 1) to 12th Street South (Conference Center)

Mid-Day Vehicles Per Hour - Eastbound 1 0 1 n/a 0 2 n/a 0 n/a 2

15

6

All Day, 7 days per week

5

5

Weekday, All Day

3

2

Weekday, All Day

4

3

12

10

Subtotal Pentagon City Other Routes 16Y

Four Mile Run Road to Farragut Square

Peak period, peak direction only

7

0

ART 41

Columbia Heights West to Court House

All day, 7 days per week

8

8

ART 45

Four Mile Run Drive to Rosslyn

All Day – weekdays only

Streetcar

No service in TSM

No service in TSM

2

2

n/a

n/a

May 2012

1-5

Figure 1-3: Streetcar Build Alternative: Streetcar Alignment and Background Bus Service Route Network

1-6

Columbia Pike Transit Initiative Alternatives Analysis/Environmental Assessment – Volume II

Figure 1-4: Streetcar Build Alternative: Streetcar Alignment and Stop Locations

May 2012

1-7

1-8

Columbia Pike Transit Initiative Alternatives Analysis/Environmental Assessment – Volume II

Table 1-3: Streetcar Build Alternative: Number of Trips by End Terminal Route

Terminal points

Hours of Service

Peak Vehicles Per Hour – Eastbound

Mid-Day Vehicles Per Hour - Eastbound

Pentagon 16A 16B 16D 16E 16F 16J 16K 16L 16P ART 42

Annandale to Pentagon Metro Station (will run as limited stop) Culmore to Pentagon Metro Station weekend service to Annandale) Annandale to Pentagon Metro Station (will run as limited stop) Culmore to Pentagon Metro Station via Pentagon City Culmore to Federal Triangle via Pentagon – Remains Limited Stop Culmore to Pentagon Metro Station Columbia Heights West to Pentagon Metro Station Annandale to Pentagon Express (via I-395) Culmore to Pentagon Metro Station via Pentagon City Ballston to Pentagon Metro Station

Weekday - all day

1

1

Peak Periods, evenings and weekends

2

0

Weekday - all day

1

1

n/a

n/a

Peak period

4

0

All Day weekdays, Saturdays

2

2

n/a

n/a

2

0

n/a

n/a

3

2

15

6

10

10

Evenings – each day

Weekend mornings only Weekday peak period, peak direction Sunday - all day All day, Weekdays and Saturdays

Pentagon Subtotal Pentagon City Streetcar

Skyline to 12th Street South (Conference Center)

All Day, 7 days per week

16J (PC)

Culmore to Pentagon City Metro Station

Peak Period Only

2

0

16G

Removed in Build

Removed in Build

n/a

n/a

16H

Removed in Build

Removed in Build

n/a

n/a

16H/

Removed in Build

Removed in Build

n/a

n/a

12

10

Pentagon City Subtotal Other Routes 16Y

Four Mile Run Road to Farragut Square

Peak period, peak direction only

7

0

ART 41

Columbia Heights West to Court House

All day, 7 days per week

8

8

ART 45

Four Mile Run Drive to Rosslyn

All Day – weekdays only

2

2

May 2012

1-9

Table 1-4: Streetcar Build Alternative: Streetcar Alignment Information Alignment Eastern Terminus Pentagon City (12th Street/South Eads Street) Design Options for  Design Option: Skyline - Jefferson Street Western Terminus Transit Center  Design Option: Skyline Central Plaza  Design Option: Skyline at Route 7 Design Options for  Current Columbia Pike alignment between the Roadway Alignment Navy Annex and Joyce Street  Realigned Columbia Pike between the Navy Annex and Joyce Street (Contingent upon land swap with DOD) Areas of Median Median running segments: Running  Jefferson Street between Leesburg Pike and Columbia Pike (0.51 miles); exclusive guideway along a portion of Jefferson Street for Design Option Skyline- Jefferson Street Transit Center (approximately 400 feet)  South Joyce Street between Army Navy Drive and Columbia Pike (0.30 miles)  South Hayes Street/Army Navy Drive to 12th Street/South Eads Street (0.42 miles); exclusive guideway along a portion of 12th Street between Fern and Eads (approximately 300 feet) Alignment Length  4.71 miles (Design Option: Jefferson Street Transit Center)  4.94 miles (Design Option: Skyline Central Plaza)  4.91 miles (Design Option: Skyline at Route 7) Non-Revenue Track 160 feet Length

1-10

Table 1-5: Streetcar Build Alternative: Streetcar Facility Information Facilities Stops 18 stop locations in each direction (Design Option: Skyline - Jefferson Street Transit Center); 19 stop locations in each direction (Design Options Skyline Central Plaza and Skyline at Route 7). (Note: Some stop improvements implemented under the No Build Alternative.) See Table 6 for list of stops Operations and Pentagon City (along Eads Street between 12th Maintenance Facility Street and Army Navy Drive) Transit Center Jefferson Street (Baileys Crossroads): at-grade offstreet bus bays and approximately 200 surface park-and-ride spaces. Construction Staging Along Columbia Pike near Navy Annex and Equipment Storage Facility Traction Power  Army Navy Drive/I-395 ramp Substations  Washington Boulevard interchange  Oakland Street  Randolph Street/George Mason Drive  Jefferson Street Transit Center Table 1-6: Streetcar Build: Pentagon City O&M Facility Information Pentagon City O&M facility Shop Building (sf.):  12,000 Fleet Size (no. of 13 cars): Rail Vehicle 13 Storage: Turnouts: 4 Access: 12th street Traction Power 1 Substations: Daily maintenance, inspections, running repair, wheel Duties Performed truing, component change-out/cyclical maintenance

Columbia Pike Transit Initiative Alternatives Analysis/Environmental Assessment – Volume II

Figure 1-5: Streetcar Build Alternative: Pentagon City Operation and Maintenance Facility Concept Plan

May 2012

1-11

Figure 1-6: TSM 1, TSM 2, and Build Alternatives: Route Network

1-12

Columbia Pike Transit Initiative Alternatives Analysis/Environmental Assessment – Volume II

Table 1-7: Stop Locations by Alternative Station ID

General Location

Local A B C D Local E Local Local F G H I Local J K Local Local L M N O Local P Local Local Q

Pentagon City (varies by route) 12th St/Eads St Pentagon City Metro/S. Hayes St Army Navy Drive/S. Joyce St S. Joyce St Southgate Rd Heritage Center (Oak St) S. Orme St Rolfe St Scott St S. Courthouse Rd S. Barton St Walter Reed Drive S. Highland St S. Glebe Rd S. Monroe St S. Oakland St S. Quincy St George Mason Drive S. Thomas St S. Buchanan/Four Mile Run Dr Arlington Mill (Dinwiddie St) Frederick St Greenbrier St Wildwood Park/Windsor Towers Jefferson St near Columbia Pike (westbound only) Jefferson St - Goodwin House

No Build (existing)                           

R

Jefferson St near Leesburg Pike



(TSM 1) At transit center (TSM 2)

At transit center

S

Skyline Complex

Various locations

At George Mason Dr (TSM 1) In Skyline Complex (TSM 2)

curbside

TSM Alternatives                  

Streetcar Build (incl. platform location) Background bus service center center curbside center curbside curbside curbside curbside curbside curbside curbside curbside curbside curbside curbside curbside center*

May 2012

1-13

Table 1-8: Physical and Operational Characteristics for each Alternative

Transit vehicles

No Build Metrobus: 40-foot compressed natural gas (CNG) buses (capacity for 41 seated passengers/22 standees).

TSM 1

Same as No Build Alternative

Physical Characteristics

ART: 31- or 35-foot CNG buses with capacity for 25 seated/10 standing

1-14

TSM 2 60-foot articulated buses on routes 16G, 16H (capacity of 60 seated passengers/34 standees) 40-foot CNG buses on remaining Metrobus routes. 31- or 35-foot CNG buses on ART routes

Streetcar Build 66-foot electric tram, capacity of 44 seated passengers/71 standees. 40-foot CNG buses on complementary Metrobus service. 31- or 35-foot CNG buses on ART routes Streetcar service along 5mile alignment between Skyline and Pentagon City with complementary bus network

Transit alignments

Metrobus 16 Line and coordinated ART service (“PikeRide”)

Enhanced bus network along project corridor with a focus on providing improved service to Skyline

Same as TSM 1 Alternative

Stop locations

Stops located at most intersections, approximately 1/8mile apart

Consolidate selected bus stops; ¼ to ½ mile spacing to support high activity locations and provide efficient transit operations

Same as TSM 1 Alternative

Same as TSM 1 Alternative

All projects included under No Build; Minimum street improvements required for implementation of transit improvements (set curb and median to accommodate vehicular left turns, pedestrian movements, etc.) Implementation of Super Stops with raised boarding areas along full ~5 mile alignment (Skyline to Pentagon City); boarding and alighting through all doors Consolidated stops that have not been upgraded through the Super Stops program will have enhanced shelters and display real-time information, similar in design of the Super Stops. Same as No Build; Plus, a parking and intermodal transfer facility on Jefferson Street near Baileys Crossroads.

All projects included under No Build; Minimum street improvements required for implementation of streetcar (set curb and median to accommodate vehicular left turns, pedestrian movements, etc.)

Assumed street improvements

Ongoing roadway reconstruction projects, see Table 2.1-1 for a detailed description

Same as No Build Alternative

Station configuration and boarding

Implementation of Super Stops with raised boarding areas along Columbia Pike; boarding through front door

Continued implementation of the Super Stops program along Columbia Pike at consolidated stops; boarding through front door

Station attributespassenger info, shelter, etc.

Ongoing stop improvements program to add basic shelters and schedule information; Super Stops have enhanced shelters and display real-time information

Ongoing stop improvements program to add basic shelters and schedule information; Super Stops have enhanced shelters and display real-time information

Park-and-ride, transfer facilities

Small park-and-ride at Columbia Pike and Four Mile Run Drive

Same as No Build Alternative

Columbia Pike Transit Initiative Alternatives Analysis/Environmental Assessment – Volume II

Same as TSM 2 Alternative

Same as TSM 2 Alternative

Same as TSM 2 Alternative

Storage and maintenance facilities

No Build Existing bus maintenance and storage facility at Four Mile Run. ART buses will be stored and maintained at the Art House facility

TSM 1

Same as No Build Alternative

TSM 2 Same as No Build. However, articulated buses would be stored and maintained at WMATA’s Cinder Bed Road facility

Streetcar Build Same as No Build. Plus, the addition of a new streetcar O&M facility at Pentagon City.

Vehicle propulsion

Internal combustion engines powered by CNG

Same as No Build Alternative

Same as No Build Alternative

Overhead electric contact wire and traction power substations to power streetcars; CNG buses

Background bus service

Metrobus 16 Line and coordinated ART services, DASH buses serving NOVA; additional Metrobus service crossing Columbia Pike

Adjust No Build corridor bus service to better serve Skyline and provide more frequent midday service along Columbia Pike

Same as TSM 1 Alternative

Adjust bus network to supplement proposed streetcar service

Same as No Build Alternative

Same as No Build Alternative

Same as No Build Alternative

2-3 minute peak headways along trunk to match current Columbia Pike service. Includes 6-minute off-peak headways along trunk (10 -15 minutes to both the Pentagon and Pentagon City)

Same as TSM 1 Alternative

Same as TSM 1 Alternative

Same as No Build Alternative

Off-board fare collection with proof of payment

Same as TSM 2 Alternative

Intelligent Transportation Systems (ITS)

Service Frequency

Fare Policy and Pricing

Real-time passenger information available via internet and phone and at some stops; transit signal priority No expected change: 2-3 minutes in the peak along trunk (4-6 minutes to both the Pentagon and Pentagon City); 6-minute offpeak headways along trunk (1015 minutes to both the Pentagon and Pentagon City) On-board fare collection, with SmarTrip, cash, day pass, and flash pass

Operating speed and travel time (peakhour, peak-direction 2016 and 2030)

Vehicles travel at posted speed limits; peak travel time 28 mins (2016) and 20 mins (2030)

Vehicles travel at posted speed limits; peak travel time 26 mins (2016) and 28 mins (2030)

Vehicles travel at posted speed limits; peak travel time 23 mins (2016) and 25 mins (2030)

Vehicles travel at posted speed limits; peak travel time 22 mins (2016) and 23 mins (2030)

Service hours

Weekday 5:00 am to 1:30 am (Friday until 3:30 am); Saturday 5:30 am to 3:30 am; Sunday 6:00 am to 12:30 am

Match Metro service hours

Same as TSM 1 Alternative

Same as TSM 1 Alternative

May 2012

1-15

Table 1-9: Additional Transit Attributes by Alternative No Build Vehicles- standard, articulated buses, Standard buses streetcars

Branding- signage

Continuation of ART local bus branding; PikeRide branding

TSM 1

Streetcar Build

Same as No Build

Articulated buses on selected routes: 16G, 16H,

Streetcars and standard buses

Continuation of ART local bus branding;

Continuation of ART local bus branding;

Continuation of ART local bus branding;

Special branding for Pentagon City “trunk” line: 16G, 16H, 16J;

Special branding for Pentagon City “trunk” line: 16G, 16H, 16J;

Streetcar branding for Pentagon City service;

Metro Extra branding for: • Pentagon 16A, 16B, 16D • Express to Downtown Washington 16Y, 16F

Metro Extra branding for: • Pentagon 16A, 16B, 16D • Express to Downtown Washington 16Y, 16F Off-vehicle payment and validation; on-board random inspections Implementation of Enhanced Stops (similar in design to Super Stops) with raised boarding areas along full ~5 mile alignment (Skyline to Pentagon City); boarding and alighting through all doors

Metro Extra branding for: •Pentagon 16A, 16B, 16D •Express to Downtown Washington 16Y, 16F

All stops have enhanced shelters and display of realtime information

All stops have enhanced shelters and display of realtime information

Fare collection

SmarTrip and cash on-vehicle

Same as No Build

Station configuration and boarding

Implementation of Super Stops with raised boarding areas along Columbia Pike

Same as No Build

Station attributespassenger info, shelter, etc.

Ongoing stop improvements program to add basic shelters and schedule information; Super Stops have enhanced shelters and display of realtime information

Ongoing stop improvements program to add basic shelters and schedule information; Super Stops have enhanced shelters and display of realtime information

1-16

TSM 2

Columbia Pike Transit Initiative Alternatives Analysis/Environmental Assessment – Volume II

Same as TSM 2

Same as TSM 2