Community Meeting Presentation #3 - Arlington County

Report 2 Downloads 17 Views
Fire Station #8 Relocation – Siting Process Community Meeting #3

Langston Brown Community Center July 30, 2015 from 7-9pm

Agenda  Introductions (Doug Sarno- 10 minutes)  Opening Remarks (Carol Mitten, Arlington County Manger’s Office – 5 minutes)  Recap & Updates to Previously Asked Questions (Chief Schwartz, ACFD & June Locker DES- 25 minutes)  Review of Site Matrix (June Locker - 10 minutes)  Q&A (60 minutes)  Wrap Up & Next Steps (Doug Sarno– 10 minutes)

2

Community Process • Tonight – Overview presentation – Recap – Respond to key questions heard to date – Presentation of Preliminary Site Matrix – Devote more time to Q&A

3

Community Process • Meeting #4 - September 9th @ Yorktown H.S. – Review process and key issues to date – Present results of review of additional sites – Present recommendations to be submitted to the Board

4

New Data Uploaded to Website • New Data posted: – – – –

Existing footprint size Updated info on lot size requirements Socioeconomic Factors and Incidence of Fire Acquisition of Current Fire Station land

• http://projects.arlingtonva.us/2015/07/firestation-8-future-location-questions-andanswers/ 5

Why Move Fire Station 8?  Replacement identified in 2015-2024 CIP  Part of the overall effort to continuously improve the system and bring equal levels of service to as much of the County as possible  reach many more North Arlington properties within the preferred response time of four minutes  Bring station up to current standards and space requirements  Part of ongoing improvements, not meant to solve the total north county gap

6

Fire Stations – Current 4 & 6 minute travel times

7

New 6-Minute Travel Time Coverage

8

Site Selection Criteria  Criteria for relocating FS#8 is based on an independent analysis by TriData and guidance from Arlington County Board:  An increase in the number of households reached in 4-6 minutes  1.5 acre site already owned by the County (or likely to come into the County's control expeditiously and at a feasible cost)  Proximity to major arterial street(s)  A location that does not adversely affect the distribution of workload among the system of fire stations.

9

Site Matrix SITE

Legend FIREDEPT OPERATIONS IMPROVED RESPONSE NETWORKCOMPATIBILITY 1400+ residences added to 4 No impact to Response Times; min. response and 1600+ Units from FS2 &3 will not be residences added to 6 min impacted response times

response times improved; Minor impact to Response less < 1400+ residences added Times. to 4 min. response and 1600+ residences added to 6 min

no improvement in N Arlington response times

Major impact to Response Times; Units from FS2 or 3 pulled too far north

Address

Arlington County Salt Dome site

26TH St N & Old Dominion

Glebe & Rock Springs (Country Club Parcels along Glebe) Glebe & Yorktown

Washington Golf and Country Club TBD

Wells Fargo Bank (2 parcels) Glebe & Williamsburg

AREA (ACRES)

FIREDEPT OPERATIONS IMPROVED RESPONSE NETWORKCOMPATIBILITY

7.1

a

a

TBD

a

a

TBD

a

a

2213 N. Glebe Road

0.977/ 0.442

a

a

TBD

TBD

a

a

0.67

a

a

Saint Mary’s Episcopal Church Residential Property Fire Station #8

4845 Lee Hwy

0.76

b/ c

a

Fire Station #8 + adjacent properties (3 parcels)

Lee Highway & Culpepper St.

0.76/ 0.2867

b/ c

a

3912 N. Dumbarton Street

0.9/ 1.3

c

c

Rock Spring Park

5012 Little Falls Road

1.48

c

c

Madison Community Center

c

c

VDOT Site 1 West

N. Old Glebe Road - Parcel A, 8.776 Parcel B Glebe Rd & Old Glebe Road Int 2.24

c

c

VDOT Site 2 East

Glebe Rd & Old Glebe Road Int 1.04

c

c

TBD

c

c

VHCParcels

Washington Golf and Country Club Lee & George Mason

TBD

c

c

Arlington Presbyterian Church of the Covenant

2666 Military Road

TBD

c

c

Military Road

14.8

c

c

5009 Lee Highway

0.34

c

b

3611 Military Road

0.5

c

c

Taylor Elementary

2600 N. Stuart Street

15.54

c

c

Gulf Branch Park

3608 Military Road

29.289

c

c

Upper Pimmit Run Park (2 parcels)

Military Road (Country Club Parcels along Military)

Zachary Taylor Park Federal Bakery Gulf Run Pumping Station

10

Questions & Answers

11

Next Steps

What are we going to do with what we hear? Staff will continue to review and analyze suggested sites & criteria. Share Results and Recommendations to the Board at Meeting #4, September 9th Please provide any additional feedback/suggestions by August 15th NEW Project Contact – George May; email to [email protected] 12

Wrap up Upcoming meetings: Meeting #4 on September 9th at Yorktown High School For latest project updates & Information: http://projects.arlingtonva.us/projec ts/fire-station-8/ Please sign up for email alerts 13

Fire Station #8 Program Requirements 4 Bay stations Drive-through arrangement New program standards Decontamination & storage Workforce gender mix 24 hour shift Model - Fire Station #5 Total Site = 1.5 acres Building footprint, apron, wrap around drive aisle, and 12 surface parking – 0.8 Acres Site – 0.7 Acres  30 ft setback/buffer

14

Fire Station # 5 1750 S Hayes St Arlington, VA 22202

15

Potential Locations from Tri Data

The 2012 TriData study identified three potential sites meeting travel time criteria

16