SLIGO MILL PARK CONSTRUCTION PLANS 6400 ORCHARD AVENUE TAKOMA PARK, MD 20912 GENERAL NOTES FOR WORK ON M-NCPPC PROPERTY 1. ALL NOTES SHOWN ON THE DRAWINGS ARE TYPICAL UNLESS OTHERWISE SHOWN OR NOTED. 2. A PRE-CONSTRUCTION MEETING SHALL BE CONDUCTED BY THE M-NCPPC CONSTRUCTION MANAGER PRIOR TO START OF ANY CONSTRUCTION RELATED ACTIVITY AT THE PROJECT SITE. CONTACT JAY CHILDS (301-495-2574) TO SCHEDULE. 3. NO CLEARING, GRUBBING, OR GRADING SHALL COMMENCE UNTIL THE LIMITS OF DISTURBANCE ARE STAKED IN THE FIELD AND ARE APPROVE BY THE M-NCPPC CONSTRUCTION MANAGER AS WELL AS ANY OTHER APPLICABLE PERMITTING AGENCIES. AFTER THE LIMITS ARE APPROVED, NO DISTURBANCE WILL BE ALLOWED OUTSIDE OF THE APPROVED LIMITS. ANY ITEMS DISTURBED OUTSIDE OF THE APPROVED LIMITS, WILL BE REPLACED AT THE CONTRACTORS OWN EXPENSE. 4. THE ENTIRE LOD SHALL BE FENCED AS DIRECTED BY THE PARK CONSTRUCTION MANAGER. WHERE SILT FENCE, SUPER SILT FENCE, OR TREE PROTECTION FENCE IS NOT REQUIRED, ORANGE BLAZE SAFETY FENCE MAY BE USED. 5. FIELD RUN TOPOGRAPHIC SURVEY PROVIDED BY A. MORTON THOMAS & ASSOCIATES, INC. IN APRIL 2014 AND MONTGOMERY COUNTY GIS TOPOGRAPHIC INFORMATION. SURVEY IS IN STATE PLANE DATUM NAD88 AND NAVD83 BOUNDARIES SHOWN ARE DERIVED FROM DEED AND PLAT INFORMATION. 6. M-NCPPC RESERVES THE RIGHT TO ADJUST AND MODIFY THE LIMITS OF DISTURBANCE IN THE FIELD TO MINIMIZE IMPACTS OF WORK. 7. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR MAINTAINING SAFE FACILITY ACCESS THROUGHOUT CONSTRUCTION AND PROVIDE ANY APPROPRIATE DETOURS, TEMPORARY FACILITIES, AND SIGNAGE AS REQUESTED BY THE M-NCPPC CONSTRUCTION MANAGER. 8. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS AND REPORT TO M-NCPPC'S CONSTRUCTION MANAGER ANY ERROR OR INCONSISTENCY WITH THE ACTUAL CIRCUMSTANCES IN THE FIELD BEFORE COMMENCING WORK. 9. THE CONTRACTOR SHALL STAKE-OUT THE LOCATION OF FACILITIES AND MEET WITH THE M-NCPPC CONSTRUCTION MANAGER TO REVIEW THE LOCATION. M-NCPPC RESERVES THE RIGHT TO ADJUST THE LOCATIONS AS NECESSARY. 10. SITE RESTORATION AND REPAIR/REPLACEMENT OF DAMAGED INFRASTRUCTURE SHALL BE IN ACCORDANCE WITH M-NCPPC DETAILS, STANDARDS, AND SPECIFICATIONS AT THE DIRECTION OF THE M-NCPPC INSPECTOR AT NO COST TO M-NCPPC. 11. TREE PROTECTION FENCING SHALL BE PER TREE PROTECTION FENCE DETAIL SHOWN ON PLANS. TREE PROTECTION FENCE SHALL BE INSTALLED BY THE CONTRACTOR AND INSPECTED BY M-NCPPC CONSTRUCTION MANAGER PRIOR TO START OF CONSTRUCTION. 12. ALL PLANTING SUBSTITUTIONS SHALL BE APPROVED BY M-NCPPC CONSTRUCTION MANAGER. PLANT MATERIALS AND LOCATIONS MUST BE INSPECTED BY M-NCPPC PRIOR TO INSTALLATION. 13.PROVIDE DEER PROTECTION FENCING PER M-NCPPC'S SPECIFICATIONS FOR ALL LANDSCAPE AND REFORESTATION TREES AND SHRUBS TO PREVENT DAMAGE FROM DEER. TUBEX SHALL NOT BE USED AS A SUBSTITUTE. 14. STAGING AREAS AND ACCESS ROUTES SHALL BE DETERMINED IN FIELD AND APPROVED BY THE M-NCPPC CONSTRUCTION MANAGER TO MINIMIZE IMPACTS. 15. M-NCPPC MAY INSPECT CONDITION OF TREES THROUGHOUT CONSTRUCTION AND REQUIRE REPAIR, REMOVAL, AND/OR REPLACEMENT OF ANY DAMAGED TREES AT NO COST TO M-NCPPC. 16. CONSTRUCTION MANAGER MAY AUTHORIZE SPECIAL TREE AND TREE ROOT PROTECTION MEASURES OTHER THAN SHOWN ON THESE PLANS DURING CONSTRUCTION. THESE MAY INCLUDE, BUT NOT BE LIMITED TO 12-INCH THICK MULCH LAYER ACCESS BEDDING, MATTING, ADDITIONAL TREE PROTECTION FENCING, AND ADDITIONAL SEDIMENT CONTROLS. 17. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR IDENTIFYING THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO START OF CONSTRUCTION RELATED WORK AND SHALL COORDINATE THE WORK WITH M-NCPPC CONSTRUCTION MANAGER .THE CONTRACTOR SHALL MAINTAIN PROPER CLEARANCES BETWEEN ALL EXISTING AND PROPOSED UTILITIES AT ALL TIMES AS REQUIRED BY THE UTILITY COMPANIES. 18.UTILITIES SHOWN HEREON ARE BASED ON BEST AVAILABLE INFORMATION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE ACCURACY OF THIS INFORMATION. ANY COST ASSOCIATED WITH THE REPAIR OR REPLACEMENT OF UTILITIES DAMAGED BY THE CONTRACTOR SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ANY DAMAGE MADE TO THE UTILITY SHALL BE REPAIRED ON AN EMERGENCY BASIS PER THE LATEST SPECIFICATIONS OF THE CONCERNED UTILITY AND COMPLETED WORK SHALL BE APPROVED BY THE CONCERNED UTILITY. ANY DAMAGE SHALL BE REPORTED AND DOCUMENTED IMMEDIATELY TO THE M-NCPPC CONSTRUCTION MANAGER. REPAIR APPROVALS SHALL BE PROVIDED TO THE M-NCPPC CONSTRUCTION MANAGER. 19.DISCREPANCIES, OMISSIONS, AMBIGUITIES, OR CONFLICTS IN OR AMONG THE CONSTRUCTION DOCUMENTS OR DOUBT ABOUT THEIR MEANING SHALL BE BROUGHT TO THE ATTENTION OF THE MNCPPC CONSTRUCTION MANAGER FOR DIRECTION BEFORE PROCEEDING WITH WORK. IF CONFLICTS EXIST, THE MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS OTHERWISE STATED IN WRITING BY THE MNCPPC CONSTRUCTION MANAGER. 20.PRIOR TO VEGETATIVE STABILIZATION, ALL DISTURBED AREAS MUST BE TOPSOILED PER THE MONTGOMERY COUNTY "STANDARDS AND SPECIFICATIONS FOR TOPSOIL". IF ON-SITE MATERIALS DO NOT MEET REQUIREMENTS OF TOPSOIL, COORDINATE WITH M-NCPPC REGARDING TILLING-IN OF CERTIFIED COMPOST TO ON-SITE SOILS IN ORDER TO MEET SPECIFICATIONS. 21.PAVEMENT REMOVAL SHALL INCLUDE REMOVAL OF GRAVEL SUBBASE AND SCARIFICATION OF SUBGRADE, UNLESS OTHERWISE DIRECTED BY M-NCPPC. 22.TO ALL BIDDERS: THE GENERAL CONTRACTOR AND ALL MAJOR SUBCONTRACTORS SHALL VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS PRIOR TO SUBMITTING BID. 23.THIS SITE IS LOCATED IN THE LOWER ROCK CREEK WATERSHED OF MONTGOMERY COUNTY. RUNOFF FROM THIS SITE DRAINS INTO JOSEPHS BRANCH TRIBUTARY.
SITE
VICINITY MAP 1 INCH = 2000 FT.
MISS UTILITY The Contractor shall call "Miss Utility" at 1-800-257-7777, 48 hours prior to the start of work. The Contractor is responsible for ensuring that all underground utilities in the area of proposed work are located prior to commencing construction work. The Contractor is responsible for compliance with requirements of Chapter 36A of the Montgomery County Code. The Contractor is also responsible for locating all private utilities (not located by Miss Utility) within M-NCPPC property at their expense. All utilities shown on the plans are provided for information only and shall be considered approximate. M-NCPPC shall not be responsible for locating underground utilities. Any utilities or other underground facilities damaged during construction shall be repaired/replaced at the Contractor's expense.
M-NCPPC SWM MAINTENANCE CERTIFICATION I hereby certify that the M-NCPPC Montgomery County Department of Parks will assume non-structural maintenance responsibilities for all stormwater management (SWM) structures as listed and shown, hereon, in accordance with the Right of Entry between M-NCPPC and the Department of Environmental Protection dated 5/7/2007. If, for any reason, future improvements on Parkland are planned that would impact any of the SWM facilities included herein, M-NCPPC will notify the Department of Environmental Protection during the facility planning/preliminary design stages for such improvements.
CITY OF TAKOMA PARK STORMWATER MANAGEMENT CERTIFICATION The stormwater plan was approved by City of Takoma Park engineering department. City Engineer: Ali Khalilian, P.E. MD License No:18482 Exp: 11/06/2017
ADA COMPLIANCE CERTIFICATION The undersigned does hereby certify that this project has been designed in accordance with the current ADA standards for accessible design and all applicable local, state, and federal requirements. ___________________________________________ ____________
Design Engineer
Date
APPROVED FOR PROCUREMENT Approved By: __________________________________________ Date:________ Michael Ma, PE Acting Chief, Park Development Division
MONTGOMERY COUNTY DEPARTMENT OF PERMITTING SERVICES APPROVED FOR: Stormwater Management:
Sediment Control Technical Requirements
______________________________________________________ Montgomery County Department of Parks Date
CERTIFICATION OF THE QUANTITIES "I hereby certify that the amount of excavation and fill as shown on these plans has been computed to _200_ cubic yards of excavation, _0_ cubic yards of fill and the total area to be disturbed as shown on these plans has been determined to be 10,200 square feet."
_______________________________ _______________________ Signature Date
Playscape
SYMBIOSIS 9008 Brae Brooke Drive Lanham, MD 20706 Phone-202.595.1999 Fax-202 595 1998
_______________________________ _______________________ Printed Name Registration Number
Consultants: Civil, Survey
Consultants: Geotechnical
A. Morton Thomas & Associates, Inc.
Kim Engineering, Inc.
800 King Farm Blvd, Forth Floor Rockville, MD 20850 Phone-301.881.2545
11127 New Hampshire Ave. Silver Spring, MD 20904 Phone-301.754.2882 Fax-301.754.2884
DESIGN
A. MORTON THOMAS AND ASSOCIATES, INC. ________________________________________________ Designer's Name
800 KING FARM BOULEVARD, 4TH FLOOR ________________________________________________ Address
ROCKVILLE, MD 20850 ________________________________________________ City/State/Zip
301-881-2545 ________________________________________________ Telephone Number
Marcello Arroio Project Engineer
Stephen Jerrick, P.E. Project Manager
Max Kantzer, P.E. Principal
N/A Drawn by
12/05/16 Date
12/05/16 Date
12/05/16 Date
N/A Date
SAJ
Note : The earthwork cut and fill quantities and the area of disturbance indicated in this certificate are calculated for the purpose of plan Approval and should not be used for contractual obligations.
Professional Certification . I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of Maryland.
DESIGN CERTIFICATION "I hereby certify that this plan has been prepared in accordance with the "2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control", Montgomery County Department of Permitting Services Executive Regulations 5-90, 7-02AM and 36-90, and Montgomery County Department of Public Works and Transportation "Storm Drain Design Criteria", dated August 1988."
________________________________ Design Engineer Signature
_______________ Date
_______________________________ Printed Name
________________ Registration Number
SAJ SAJ Checked By:
N/A Checked By:
Reviewed
"I/We hereby certify that all clearing, grading, construction and/or development will be done pursuant to this plan and that any responsible personnel involved in the construction project will have a Certificate of Attendance at a Department of Natural Resources approved training program for the control of sediment and erosion before beginning this project."
Reviewed
_____________ Date
Expiration Date: 03/26/2018
Date
Date MCDPS APPROVAL OF THIS PLAN WILL EXPIRE TWO YEARS FROM THE DATE OF APPROVAL IF THE PROJECT HAS NOT STARTED
DPS approval of a sediment control or stormwater management plan is for demonstrated compliance with minimum environmental runoff treatment standards and does not create or imply and right to divert or concentrate runoff onto any adjacent property without that property owner's permission. It does not relieve the design engineer or other responsible person of professional liability or ethical responsibility for the adequacy of the drainage design as it affects uphill or downhill properties. ISSUED FOR PROCUREMENT ON___________________
REVIEW AND APPROVAL
City of Takoma Park Public Works Department 31 Oswego Avenue Takoma Park, Maryland 20912 (301) 891-7633
Date
SM FILE #
_____________________________________________________ Printed Name and Title
REVISIONS
Project Manager
Date
Date Approved
Rev. No. License No.16872
Administrative Requirements:
SEDIMENT CONTROL PERMIT NO.
Approved
Checked By: Checked By:
MCDPS APPROVAL DOES NOT NEGATE THE NEED FOR A MCDPS ACCESS PERMIT.
Reviewed
OWNER'S/DEVELOPER'S CERTIFICATE
___________________________________ Signature
NOTE:
Date
Description
SLIGO MILL PARK
Date
COVER SHEET Construction Manager
Date
Park Manager
Date
SCALE: AS SHOWN
WSSC 208NE01 Lot 19 Liber 03694 Folio 0396
DWG. #
G-100 SHT. # _____ of _____
BENCHMARK DATA:
TRAVERSE DATA:
LEGEND
Playscape
SYMBIOSIS 9008 Brae Brooke Drive Lanham, MD 20706 Phone-202.595.1999 Fax-202 595 1998
Consultants: Civil, Survey
Consultants: Geotechnical
A. Morton Thomas & Associates, Inc.
Kim Engineering, Inc.
800 King Farm Blvd, Forth Floor Rockville, MD 20850 Phone-301.881.2545
11127 New Hampshire Ave. Silver Spring, MD 20904 Phone-301.754.2882 Fax-301.754.2884
DESIGN
A. MORTON THOMAS AND ASSOCIATES, INC. ________________________________________________ Designer's Name
800 KING FARM BOULEVARD, 4TH FLOOR ________________________________________________ Address
ROCKVILLE, MD 20850 ________________________________________________ City/State/Zip
301-881-2545 ________________________________________________ Telephone Number
Marcello Arroio Project Engineer
Stephen Jerrick, P.E. Project Manager
Max Kantzer, P.E. Principal
N/A Drawn by
12/05/16 Date
12/05/16 Date
12/05/16 Date
N/A Date
SAJ
Professional Certification . I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of Maryland.
ISSUED FOR PROCUREMENT ON___________________
REVIEW AND APPROVAL
City of Takoma Park
REVISIONS Rev. No.
Checked By:
SAJ
License No.16872
Checked By:
SAJ Checked By:
N/A Checked By:
Expiration Date: 03/26/2018
Project Manager
Public Works Department 31 Oswego Avenue Takoma Park, Maryland 20912 (301) 891-7633
Date
Description
SLIGO MILL PARK
Date
EXISTING CONDITIONS PLAN Construction Manager
Date
Park Manager
Date
SCALE: AS SHOWN
WSSC 208NE01 Lot 19 Liber 03694 Folio 0396
DWG. #
C-101 SHT. # _____ of _____
Playscape
SYMBIOSIS 9008 Brae Brooke Drive Lanham, MD 20706 Phone-202.595.1999 Fax-202 595 1998
Consultants: Civil, Survey
Consultants: Geotechnical
A. Morton Thomas & Associates, Inc.
Kim Engineering, Inc.
800 King Farm Blvd, Forth Floor Rockville, MD 20850 Phone-301.881.2545
11127 New Hampshire Ave. Silver Spring, MD 20904 Phone-301.754.2882 Fax-301.754.2884
DESIGN
A. MORTON THOMAS AND ASSOCIATES, INC. ________________________________________________ Designer's Name
800 KING FARM BOULEVARD, 4TH FLOOR ________________________________________________ Address
ROCKVILLE, MD 20850 ________________________________________________ City/State/Zip
301-881-2545 ________________________________________________ Telephone Number
Marcello Arroio Project Engineer
Stephen Jerrick, P.E. Project Manager
Max Kantzer, P.E. Principal
N/A Drawn by
12/05/16 Date
12/05/16 Date
12/05/16 Date
N/A Date
SAJ
Professional Certification . I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of Maryland.
ISSUED FOR PROCUREMENT ON___________________
REVIEW AND APPROVAL
City of Takoma Park
REVISIONS Rev. No.
Checked By:
SAJ
License No.16872
Checked By:
SAJ Checked By:
N/A Checked By:
Expiration Date: 03/26/2018
Project Manager
Public Works Department 31 Oswego Avenue Takoma Park, Maryland 20912 (301) 891-7633
Date
Description
SLIGO MILL PARK
Date
STORMWATER MANAGEMENT PLAN Construction Manager
Date
Park Manager
Date
SCALE: AS SHOWN
WSSC 208NE01 Lot 19 Liber 03694 Folio 0396
DWG. #
C-701 SHT. # _____ of _____
SAFETY SURFACE (WOOD FIBER) WITH SWM RECHARGE A-A PROFILE
MICRO-BIORETENTION A-A PROFILE
Playscape
SYMBIOSIS 9008 Brae Brooke Drive Lanham, MD 20706 Phone-202.595.1999 Fax-202 595 1998
Consultants: Civil, Survey
Consultants: Geotechnical
A. Morton Thomas & Associates, Inc.
Kim Engineering, Inc.
800 King Farm Blvd, Forth Floor Rockville, MD 20850 Phone-301.881.2545
11127 New Hampshire Ave. Silver Spring, MD 20904 Phone-301.754.2882 Fax-301.754.2884
DESIGN
A. MORTON THOMAS AND ASSOCIATES, INC. ________________________________________________ Designer's Name
800 KING FARM BOULEVARD, 4TH FLOOR ________________________________________________ Address
ROCKVILLE, MD 20850 ________________________________________________ City/State/Zip
301-881-2545 ________________________________________________ Telephone Number
Marcello Arroio Project Engineer
Stephen Jerrick, P.E. Project Manager
Max Kantzer, P.E. Principal
N/A Drawn by
12/05/16 Date
12/05/16 Date
12/05/16 Date
N/A Date
SAJ
Professional Certification . I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of Maryland.
ISSUED FOR PROCUREMENT ON___________________
REVIEW AND APPROVAL
City of Takoma Park
REVISIONS Rev. No.
Checked By:
SAJ
License No.16872
Checked By:
SAJ Checked By:
N/A Checked By:
Expiration Date: 03/26/2018
Project Manager
Public Works Department 31 Oswego Avenue Takoma Park, Maryland 20912 (301) 891-7633
Date
Description
SLIGO MILL PARK
Date
STORMWATER MANAGEMENT PROFILES Construction Manager
Date
Park Manager
Date
SCALE: AS SHOWN
WSSC 208NE01 Lot 19 Liber 03694 Folio 0396
DWG. #
C-702 SHT. # _____ of _____
I-1 TO EW-1 PROFILE
Playscape
SYMBIOSIS 9008 Brae Brooke Drive Lanham, MD 20706 Phone-202.595.1999 Fax-202 595 1998
Consultants: Civil, Survey
Consultants: Geotechnical
A. Morton Thomas & Associates, Inc.
Kim Engineering, Inc.
800 King Farm Blvd, Forth Floor Rockville, MD 20850 Phone-301.881.2545
11127 New Hampshire Ave. Silver Spring, MD 20904 Phone-301.754.2882 Fax-301.754.2884
DESIGN
A. MORTON THOMAS AND ASSOCIATES, INC. ________________________________________________ Designer's Name
800 KING FARM BOULEVARD, 4TH FLOOR ________________________________________________ Address
ROCKVILLE, MD 20850 ________________________________________________ City/State/Zip
301-881-2545 ________________________________________________ Telephone Number
CO-2 TO EX I-4 PROFILE
Marcello Arroio Project Engineer
Stephen Jerrick, P.E. Project Manager
Max Kantzer, P.E. Principal
N/A Drawn by
12/05/16 Date
12/05/16 Date
12/05/16 Date
N/A Date
SAJ
Professional Certification . I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of Maryland.
ISSUED FOR PROCUREMENT ON___________________
REVIEW AND APPROVAL
City of Takoma Park
REVISIONS Rev. No.
Checked By:
SAJ
License No.16872
Checked By:
SAJ Checked By:
N/A Checked By:
Expiration Date: 03/26/2018
Project Manager
Public Works Department 31 Oswego Avenue Takoma Park, Maryland 20912 (301) 891-7633
Date
Description
SLIGO MILL PARK
Date
STORM DRAIN PROFILES Construction Manager
Date
Park Manager
Date
SCALE: AS SHOWN
WSSC 208NE01 Lot 19 Liber 03694 Folio 0396
DWG. #
C-703 SHT. # _____ of _____
UPPER CORNERS CAN BE CHAMFERED UP TO 6" IN EACH DIRECTION
WWF 4X4 - W4.0 X W4.0 DEFORMED STEEL (ASTM 497) OUTFALL PROTECTION AS INDICATED ON PLANS
"FIBARDRAIN" (OR EQUAL) DRAINAGE SYSTEM, WRAPPED IN FILTER FABRIC. PLACE FIBARDRAIN STRIPS AT 6'-0" O.C. (MIN.) IN DIRECTION OF SUBGRADE SLOPE (PERPENDICULAR TO UNDERDRAIN OUTFALL AREA) ACROSS THE ENTIRE WIDTH OR LENGTH OF THE PLAYGROUND
6" - 12" DIAMETER PIPE AS INDICATED IN PLANS
FTG
FTG
6" - 12" DIAMETER PIPE AS INDICATED IN PLANS
PLAYGROUND SAFETY SURFACE (ENGINEERED WOOD FIBER, "WOOD CARPET" OR APPROVED EQUAL)
CONCRETE CURB
12" MIN.
SIDE VIEW
FRONT VIEW
1. CONCRETE: MD SHA MIX #3. 2. USE LATEST MD SHA SPECIFICATIONS FOR ALL STEEL AND CONCRETE.
(WASHED)
6" #7 STONE
NOTES:
1
2" SAND
3. CHAMFER: ALL EXPOSED EDGES 1" X 1" OR AS DIRECTED.
MICRO-BIORETENTION AREA TYPICAL SECTION NTS
4
STANDARD HEADWALL FOR SMALL PIPES
6' MINIUM O.C.
(WASHED PER DPS SAND SPECS)
UNDISTURBED SUB-GRADE
COMPACTED DEPTH
SLOPE VARIES (2% MAX.)
PLAYGROUND SAFETY SURFACE (ENGINEERED WOOD FIBER, "WOOD CARPET" OR APPROVED EQUAL)
SUPPLY AND INSTALL A HEAVY DUTY POLYETHYLENE HARDWARE NET, 1/2"X1/2" OPENINGS BY MEMPHIS NET & TWINE (WWW.MEMPHISNET.NET) OR APPROVED EQUAL BETWEEN THE TOP OF THE STONE LAYER AND THE BOTTOM OF THE ENGINEERED WOOD FIBAR LAYER.
NTS
SCARIFY SUBSURFACE OF UNDISTURBED SUBGRADE 6" PRIOR TO PLACING SAND UNDISTURBED SUBGRADE
SECTION N.T.S.
NOTES: 1. INSTALL SAFETY SURFACE AND UNDER DRAINAGE SYSTEM PER PLAY MANUFACTURER'S SPECIFICATIONS. 2. SCARIFY SURFACE OF UNDISTURBED SUBGRADE 6" PRIOR TO SAND PLACEMENT. 3. CONTRACTOR TO VERIFY 6" THICKNESS OF SAND/STONE BELOW DRAINAGE SYSTEM PRIOR TO DRAIN INSTALLATION THROUGHOUT PLAYGROUND AREA. FIBARDRAINS OUTLET TO OVERFLOW RESERVOIR. SEE DETAIL 5A. 4. HEAVY DUTY NET WITH 21"X12" OPENINGS WILL BE INSTALLED BETWEEN STONE AND ENGINEERED WOOD FIBAR. USE MEMPHIS NET TWINE OR EQUAL. 5. CONTRACTOR TO SUBMIT MATERIAL CERTIFICATIONS FOR APPROVAL PRIOR TO INSTALLATION TO MNCPPC CONSTRUCTION MANAGER. Detail No.
SAFETY SURFACE (WOOD FIBER) with SWM RECHARGE
6
A
The Maryland-National Capital Park and Planning Commission Montgomery County Department of Parks
2
4 JUNE 2011
PLAYGROUND SAFETY SURFACE (ENGINEERED WOOD FIBER, "WOOD CARPET" OR APPROVED EQUAL)
CLEAN OUT DETAIL NTS
"FIBAR" DRAINAGE SYSTEM (OR EQUAL) @ BOTTOM OF PLAYGROUND SAFETY SURFACE SLOPING WITH PLAYGROUND. INVERT INTO STONE RESERVOIR SHALL MATCH 4" PERFORATED PIPE INVERT.
A
CONCRETE FLUSH CURB CONCRETE 1 - 2 % MAX.
SUPPLY AND INSTALL A HEAVY DUTY POLYETHYLENE HARDWARE NET, 1/2"X1/2" OPENINGS BY MEMPHIS NET & TWINE (WWW.MEMPHISNET.NET) OR APPROVED EQUAL) BETWEEN THE TOP OF THE STONE LAYER AND THE BOTTOM OF THE ENGINEERED WOOD FIBAR LAYER.
4" PERFORATED PVC SCHEDULE 40 PIPE IN STONE OVERFLOW RESERVOIR ALONG EDGE OF PLAYGROUND, TRANSITIONING TO SOLID PVC SLOPED AT 1% MINIMUM TO DAYLIGHT INTO STORM DRAIN MANHOLE. FOLLOW GRADES ON PLAN.
4" #7 WASHED STONE (TYPICAL) 2" ASTM C-33 SAND PER MCDPS STANDARDS SCARIFY SURFACE OF UNDISTURBED SUBGRADE 6" MINIMUM PRIOR TO SAND PLACEMENT
SECTION N.T.S.
NOTES:
1. OUTFALL PIPE TO BE SOLID, NOT PERFORATED, FROM END OF STONE RESERVOIR TO DAYLIGHT INTO STORM DRAIN MANHOLE.
3 Playscape
SYMBIOSIS 9008 Brae Brooke Drive Lanham, MD 20706 Phone-202.595.1999 Fax-202 595 1998
OBSERVATION WELL DETAIL NTS
5 Consultants: Geotechnical
A. Morton Thomas & Associates, Inc.
Kim Engineering, Inc.
800 King Farm Blvd, Forth Floor Rockville, MD 20850 Phone-301.881.2545
11127 New Hampshire Ave. Silver Spring, MD 20904
Address
ROCKVILLE, MD 20850 ________________________________________________ City/State/Zip
301-881-2545 ________________________________________________
3.
PROVIDE 6" MINIMUM COVER OVER STONE OVERFLOW RESERVOIR.
OVERFLOW DRAIN FOR PLAYGROUND
Detail No.
The Maryland-National Capital Park and Planning Commission
5A
Montgomery County Department of Parks
JAN 2016
Phone-301.754.2882 Fax-301.754.2884
DESIGN
Designer's Name
800 KING FARM BOULEVARD, 4TH FLOOR ________________________________________________
PERFORATIONS SHALL BE 3/8" DIAMETER EVERY 90 DEGREES ALL AROUND THE PIPE AND PLACED 6" ON CENTER ALONG THE PVC SCHEDULE 40 PIPE IN STONE RESERVOIR.
7
Consultants: Civil, Survey
A. MORTON THOMAS AND ASSOCIATES, INC. ________________________________________________
Telephone Number
RIVER ROCK OUTLET PROTECTION
2.
Marcello Arroio Project Engineer
Stephen Jerrick, P.E. Project Manager
Max Kantzer, P.E. Principal
N/A Drawn by
12/05/16 Date
12/05/16 Date
12/05/16 Date
N/A Date
SAJ
Professional Certification . I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of Maryland.
ISSUED FOR PROCUREMENT ON___________________
REVIEW AND APPROVAL
City of Takoma Park
REVISIONS Rev. No.
Checked By:
SAJ
License No.16872
Checked By:
SAJ Checked By:
N/A Checked By:
Expiration Date: 03/26/2018
Project Manager
Public Works Department 31 Oswego Avenue Takoma Park, Maryland 20912 (301) 891-7633
Date
Description
SLIGO MILL PARK
Date
SWM DETAILS Construction Manager
Date
Park Manager
Date
SCALE: AS SHOWN
WSSC 208NE01 Lot 19 Liber 03694 Folio 0396
DWG. #
C-704 SHT. # _____ of _____
8
Playscape
SYMBIOSIS 9008 Brae Brooke Drive Lanham, MD 20706 Phone-202.595.1999 Fax-202 595 1998
TRENCH DRAIN DETAIL
9
NTS
Consultants: Civil, Survey
Consultants: Geotechnical
A. Morton Thomas & Associates, Inc.
Kim Engineering, Inc.
800 King Farm Blvd, Forth Floor Rockville, MD 20850 Phone-301.881.2545
11127 New Hampshire Ave. Silver Spring, MD 20904
DESIGN
Designer's Name
Address
ROCKVILLE, MD 20850 ________________________________________________ City/State/Zip
301-881-2545 ________________________________________________ Telephone Number
NTS
Phone-301.754.2882 Fax-301.754.2884
A. MORTON THOMAS AND ASSOCIATES, INC. ________________________________________________ 800 KING FARM BOULEVARD, 4TH FLOOR ________________________________________________
DRAINAGE STRUCTURE MODIFICATION DETAIL
Marcello Arroio Project Engineer
Stephen Jerrick, P.E. Project Manager
Max Kantzer, P.E. Principal
N/A Drawn by
12/05/16 Date
12/05/16 Date
12/05/16 Date
N/A Date
SAJ
Professional Certification . I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of Maryland.
ISSUED FOR PROCUREMENT ON___________________
REVIEW AND APPROVAL
City of Takoma Park
REVISIONS Rev. No.
Checked By:
SAJ
License No.16872
Checked By:
SAJ Checked By:
N/A Checked By:
Expiration Date: 03/26/2018
Project Manager
Public Works Department 31 Oswego Avenue Takoma Park, Maryland 20912 (301) 891-7633
Date
Description
SLIGO MILL PARK
Date
SWM DETAILS Construction Manager
Date
Park Manager
Date
SCALE: AS SHOWN
WSSC 208NE01 Lot 19 Liber 03694 Folio 0396
DWG. #
C-705 SHT. # _____ of _____
MAINTENANCE SCHEDULE FOR MICROBIORETENTION
AS-BUILT CERTIFICATION REQUIREMENTS:
CONSTRUCTION INSPECTION CHECK-OFF LIST MICRO BIORETENTION FACILITY STAGE MANDATORY NOTIFICATION: INSPECTION AND APPROVAL OF EACH PRACTICE IS REQUIRED AT THESE POINTS PRIOR TO PROCEEDING WITH CONSTRUCTION. THE PERMITTEE IS REQUIRED TO GIVE THE TAKOMA PARK DEPARTMENT OF PUBLIC WORKS INSPECTOR TWENTY-FOUR(24) HOURS NOTICE. THE TAKOMA PARK INSPECTOR MAY WAIVE AN INSPECTION, AND ALLOW THE OWNER/DEVELOPER TO MAKE THE REQUIRED INSPECTION PER A PRIOR SCHEDULED ARRANGEMENT WHICH HAS BEEN CONFIRMED WITH THE TAKOMA PARK INSPECTOR IN WRITING. WORK AND RECONSTRUCT THE UNAPPROVED WORK. UPON COMPLETION OF THE PROJECT, A FORMAL STORMWATER MANAGEMENT AS-BUILT MUST BE SUBMITTED TO TAKOMA PARK DEPARTMENT OF PUBLIC WORKS UNLESS A RECORD DRAWING CERTIFICATION HAS BEEN ALLOWED INSTEAD. EACH OF THE STEPS LISTED BELOW MUST BE VERIFIED BY EITHER THE TAKOMA PARK INSPECTOR OR THE OWNER/ DEVELOPER
Playscape
SYMBIOSIS 9008 Brae Brooke Drive Lanham, MD 20706 Phone-202.595.1999 Fax-202 595 1998
Consultants: Civil, Survey
Consultants: Geotechnical
A. Morton Thomas & Associates, Inc.
Kim Engineering, Inc.
800 King Farm Blvd, Forth Floor Rockville, MD 20850 Phone-301.881.2545
11127 New Hampshire Ave. Silver Spring, MD 20904 Phone-301.754.2882 Fax-301.754.2884
DESIGN
A. MORTON THOMAS AND ASSOCIATES, INC. ________________________________________________ Designer's Name
800 KING FARM BOULEVARD, 4TH FLOOR ________________________________________________ Address
ROCKVILLE, MD 20850 ________________________________________________ City/State/Zip
301-881-2545 ________________________________________________ Telephone Number
Marcello Arroio Project Engineer
Stephen Jerrick, P.E. Project Manager
Max Kantzer, P.E. Principal
N/A Drawn by
12/05/16 Date
12/05/16 Date
12/05/16 Date
N/A Date
SAJ
Professional Certification . I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of Maryland.
ISSUED FOR PROCUREMENT ON___________________
REVIEW AND APPROVAL
City of Takoma Park
REVISIONS Rev. No.
Checked By:
SAJ
License No.16872
Checked By:
SAJ Checked By:
N/A Checked By:
Expiration Date: 03/26/2018
Project Manager
Public Works Department 31 Oswego Avenue Takoma Park, Maryland 20912 (301) 891-7633
Date
Description
SLIGO MILL PARK
Date
SWM NOTES Construction Manager
Date
Park Manager
Date
SCALE: AS SHOWN
WSSC 208NE01 Lot 19 Liber 03694 Folio 0396
DWG. #
C-706 SHT. # _____ of _____
EROSION AND SEDIMENT CONTROL LEGEND PROPERTY LINE SUPER SILT FENCE SUPER SILT FENCE ON PAVEMENT
STORM DRAIN INLET CLEAN OUT STORM PIPE MICRO-BIORETENTION
AT-GRADE INLET PROTECTION CURB INLET PROTECTION CONCRETE WASH STRUCTURE
STABILIZED CONSTRUCTION ENTRANCE
Playscape
SYMBIOSIS 9008 Brae Brooke Drive Lanham, MD 20706 Phone-202.595.1999 Fax-202 595 1998
Consultants: Civil, Survey
Consultants: Geotechnical
A. Morton Thomas & Associates, Inc.
Kim Engineering, Inc.
800 King Farm Blvd, Forth Floor Rockville, MD 20850 Phone-301.881.2545
11127 New Hampshire Ave. Silver Spring, MD 20904 Phone-301.754.2882 Fax-301.754.2884
DESIGN
A. MORTON THOMAS AND ASSOCIATES, INC. ________________________________________________ Designer's Name
800 KING FARM BOULEVARD, 4TH FLOOR ________________________________________________ Address
ROCKVILLE, MD 20850 ________________________________________________ City/State/Zip
301-881-2545 ________________________________________________ Telephone Number
Marcello Arroio Project Engineer
Stephen Jerrick, P.E. Project Manager
Max Kantzer, P.E. Principal
N/A Drawn by
12/05/16 Date
12/05/16 Date
12/05/16 Date
N/A Date
SAJ
Professional Certification . I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of Maryland.
ISSUED FOR PROCUREMENT ON___________________
REVIEW AND APPROVAL
City of Takoma Park
REVISIONS Rev. No.
Checked By:
SAJ
License No.16872
Checked By:
SAJ Checked By:
N/A Checked By:
Expiration Date: 03/26/2018
Public Works Department 31 Oswego Avenue Takoma Park, Maryland 20912 (301) 891-7633
Project Manager
Date
Construction Manager
Date
Park Manager
Date
Date
Description
SLIGO MILL PARK EROSION AND SEDIMENT CONTROL PLAN
SCALE: AS SHOWN
WSSC 208NE01 Lot 19 Liber 03694 Folio 0396
DWG. #
C-801 SHT. # _____ of _____
Playscape
SYMBIOSIS 9008 Brae Brooke Drive Lanham, MD 20706 Phone-202.595.1999 Fax-202 595 1998
Consultants: Civil, Survey
Consultants: Geotechnical
A. Morton Thomas & Associates, Inc.
Kim Engineering, Inc.
800 King Farm Blvd, Forth Floor Rockville, MD 20850 Phone-301.881.2545
11127 New Hampshire Ave. Silver Spring, MD 20904 Phone-301.754.2882 Fax-301.754.2884
DESIGN
A. MORTON THOMAS AND ASSOCIATES, INC. ________________________________________________ Designer's Name
800 KING FARM BOULEVARD, 4TH FLOOR ________________________________________________ Address
ROCKVILLE, MD 20850 ________________________________________________ City/State/Zip
301-881-2545 ________________________________________________ Telephone Number
Marcello Arroio Project Engineer
Stephen Jerrick, P.E. Project Manager
Max Kantzer, P.E. Principal
N/A Drawn by
12/05/16 Date
12/05/16 Date
12/05/16 Date
N/A Date
SAJ
Professional Certification . I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of Maryland.
ISSUED FOR PROCUREMENT ON___________________
REVIEW AND APPROVAL
City of Takoma Park
REVISIONS Rev. No.
Checked By:
SAJ
License No.16872
Checked By:
SAJ Checked By:
N/A Checked By:
Expiration Date: 03/26/2018
Project Manager
Public Works Department 31 Oswego Avenue Takoma Park, Maryland 20912 (301) 891-7633
Date
Description
SLIGO MILL PARK
Date
EROSION AND SEDIMENT CONTROL DETAILS Construction Manager
Date
Park Manager
Date
SCALE: AS SHOWN
WSSC 208NE01 Lot 19 Liber 03694 Folio 0396
DWG. #
C-802 SHT. # _____ of _____
EROSION AND SEDIMENT CONTROL NOTES:
INITIAL SEQUENCE OF CONSTRUCTION:
/ / /
/
/
SEQUENCE OF CONSTRUCTION:
/
STANDARDS AND SPECIFICATIONS FOR DUST CONTROL
/
Playscape
SYMBIOSIS 9008 Brae Brooke Drive Lanham, MD 20706 Phone-202.595.1999 Fax-202 595 1998
Consultants: Civil, Survey
Consultants: Geotechnical
A. Morton Thomas & Associates, Inc.
Kim Engineering, Inc.
800 King Farm Blvd, Forth Floor Rockville, MD 20850 Phone-301.881.2545
11127 New Hampshire Ave. Silver Spring, MD 20904 Phone-301.754.2882 Fax-301.754.2884
DESIGN
A. MORTON THOMAS AND ASSOCIATES, INC. ________________________________________________ Designer's Name
800 KING FARM BOULEVARD, 4TH FLOOR ________________________________________________ Address
ROCKVILLE, MD 20850 ________________________________________________ City/State/Zip
301-881-2545 ________________________________________________ Telephone Number
Marcello Arroio Project Engineer
Stephen Jerrick, P.E. Project Manager
Max Kantzer, P.E. Principal
N/A Drawn by
12/05/16 Date
12/05/16 Date
12/05/16 Date
N/A Date
SAJ
Professional Certification . I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of Maryland.
ISSUED FOR PROCUREMENT ON___________________
REVIEW AND APPROVAL
City of Takoma Park
REVISIONS Rev. No.
Checked By:
SAJ
License No.16872
Checked By:
SAJ Checked By:
N/A Checked By:
Expiration Date: 03/26/2018
Project Manager
Public Works Department 31 Oswego Avenue Takoma Park, Maryland 20912 (301) 891-7633
Date
Description
SLIGO MILL PARK
Date
EROSION AND SEDIMENT CONTROL NOTES Construction Manager
Date
Park Manager
Date
SCALE: AS SHOWN
WSSC 208NE01 Lot 19 Liber 03694 Folio 0396
DWG. #
C-803 SHT. # _____ of _____
TREE PROTECTION NOTES:
TEMPORARY TREE PROTECTION SIGNAGE
SUMMARY TABLE
CdD
KEY PLAN
MAPPED SOIL TYPES
GENERAL NOTES NARRATIVE DESCRIPTION: TREE IDENTIFICATION, CONDITIONS AND RETENTION POTENTIAL:
TREE TO BE REMOVED
Playscape
SYMBIOSIS 9008 Brae Brooke Drive Lanham, MD 20706 Phone-202.595.1999 Fax-202 595 1998
Consultants: Civil, Survey
Consultants: Geotechnical
A. Morton Thomas & Associates, Inc.
Kim Engineering, Inc.
800 King Farm Blvd, Forth Floor Rockville, MD 20850 Phone-301.881.2545
11127 New Hampshire Ave. Silver Spring, MD 20904 Phone-301.754.2882 Fax-301.754.2884
DESIGN
A. MORTON THOMAS AND ASSOCIATES, INC. ________________________________________________ Designer's Name
800 KING FARM BOULEVARD, 4TH FLOOR ________________________________________________ Address
ROCKVILLE, MD 20850 ________________________________________________ City/State/Zip
301-881-2545 ________________________________________________ Telephone Number
Marcello Arroio Project Engineer
Stephen Jerrick, P.E. Project Manager
Max Kantzer, P.E. Principal
N/A Drawn by
12/05/16 Date
12/05/16 Date
12/05/16 Date
N/A Date
SAJ
Professional Certification . I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of Maryland.
ISSUED FOR PROCUREMENT ON___________________
REVIEW AND APPROVAL
City of Takoma Park
REVISIONS Rev. No.
Checked By:
SAJ
License No.16872
Checked By:
SAJ Checked By:
N/A Checked By:
Expiration Date: 03/26/2018
Public Works Department 31 Oswego Avenue Takoma Park, Maryland 20912 (301) 891-7633
Project Manager
Date
Construction Manager
Date
Park Manager
Date
Date
Description
SLIGO MILL PARK NATURAL RESOURCE INVENTORY/ TREE PROTECTION PLAN
SCALE: AS SHOWN
WSSC 208NE01 Lot 19 Liber 03694 Folio 0396
DWG. #
F-101 SHT. # _____ of _____