Development Opportunity Leisure Site
COPYRIGHT © MLM CONSULTING ENGINEERS LTD
Marham Park, Bury St Edmunds, Suffolk IP28 6LF
N PARCEL L 1.053 HA 2.602 AC
1. THI ENGIN SPECI 2.
DO
ELECT PRIOR
PARCEL K 2.681 HA 6.625 AC
LEISURE USE 2.008 HA 4.962 AC
P1 Issue
Drawin
Client
LEISURE USE 2.008 HA 4.962 AC
Project
PARCEL K 2.681 HA 6.625 AC
MA BU
Drawin
RE LE Tk
JJ
All Enquiries
JJ
4.962 acres available for Leisure D2 use
JJ
Potential for 30,000 sq ft building
JJ
Located within Significant New Development
JJ
Additional outdoor sports pitches site may be available
Savills Cambridge Unex House, 132-134 Hills Road CB2 8PA
+44 (0) 1223 347 003 savills.co.uk
© MLM CONSULTING ENGINEERS LTD
NOTE
Green Riding
29.7m
West End House Broadlands
A 110
1
1. THIS DRAWI ENGINEER'S, A SPECIFICATION
Keimal Five Acres
Alpa
06 B 11
Hunters Moon
DO NOT
2.
Berguolt
ELECTRONICAL PRIOR TO SCAL
Rosecroft
Red House
KEY
A 11
01
Fyno
ord
M Hal
low
es
L
6
Fish Farm ON PIGE
Industrial Estate Th
eH
NE LA
Moo Po t int
yd
e
T
29.0m
(Tr ack
Co
1
)
pp
Sh
Ha
Dr
ain
m
A 11
rly
Cim
P
ers
alo
n
S
01
arro
29.3m
n
P
Tra
ck
46
B4 b
B1
INFRASTRUCTURE DETAILS DEVELOPER: COUNTRYSIDE PROPERTIES TO BE BUILT BY 150th OCCUPATION
LEISURE USE
El
a
St
Su
A5
El Sub Sta
E AS
CH
CONSTRUCTION TRAFFIC ONLY
AD RO
PARCEL I, K & L DEVELOPER: BARRATS TOTAL NO. OF UNITS: 180 SALE DATE: SEPT 2016 1st UNIT SALE: SPRING 2018
N
ER
AY
W
El Sub Sta
RTH
NO
TU T HI
LL
A1
45.1m
Tk
Trading and Industrial Estate Tk
N
ER
RTH
NO W AY
Posts
Posts
FORMAL PUBLIC OPEN SPACE
SCHOOL OR 81 UNITS ANTICIPATED SALE DATE: FEBRUARY 2021
b
El
a
St
Su
5
6
Stone
4
54.0m
s
ce
End
pi
Tk
Cop
MIXED USE NO. OF UNITS: 5 SALE DATE: TBC
1
Tk Stone
38
29
31
Stone
33
48
Trac
k
PARCEL G & H DEVELOPER: BLOOR HOMES TOTAL NO. OF UNITS: 151 SALE DATE: DECEMBER 2016 1st UNIT SALE: CHRISTMAS 2017
27/04/17
Issue
Date
58
43
AD
45
to
53
R R 68
VE SE
53
15
11
to
to
19
O
to
47
N
39
PARCEL J NO. OF UNITS: 119 ANTICIPATED SALE DATE: FEBRUARY 2021
18
Drawing Status
14
10
31
40
42
32
EN
UE
to
ND
38
to
6
pr ise Par k
71
13
5
22
11
9
to
to
16
17
Bus
in
es
Ent
30
M
er
to
CU
s
1
24
BE
4
RLA
76
AV
to
23
63
29
15
PARCEL A DEVELOPER: COUNTRYSIDE PROPERTIES NO. OF UNITS: 153 SALE DATE: N/A START ON SITE: JULY 2019
28/04/17
P1
37.5m
35
PARCEL C DEVELOPER: COUNTRYSIDE PROPERTIES NO. OF UNITS: 126 SALE DATE: N/A START ON SITE: JULY 2017 1st UNIT SALE: CHRISTMAS 2017
55.2m
P2
Stone
59
12
44
22
8
16 Playground
Stone
6
N
N
LY
26
CE
5
3
43.0m
JO
PARCEL D DEVELOPER: COUNTRYSIDE PROPERTIES NO. OF UNITS: 84 SALE DATE: N/A START ON SITE: JULY 2019
SE
CLO
2
18
2
35
12 to
39
1
79
25
7
77
22
15
45.2m
44
to
9t
17
o1
1
19
Stone
46
5
16
75
44.9m
24 6
5
15
13 30 36
LD
16
IN
67
14
14
8
85
1
AR
14
MARH BURY
24
25
14
0
2
7
UE
to
EN
12
AV
83
8
S
to
Shelter
LE
48
47.2m
77
7
CH
to
CE
6
Willow House
IN
UE
5
PR
EN
AV
W
Project
12 29
W
DR
BA
E
IV
89
18 35
15
11
K
IC
W
AR
48
17
23
64
1
Client
34 36
27
79
23 to 29
32
15
Golf Course
1
80
29
78
32
CL
73
AM
RH
DU
PARCEL F NO. OF UNITS: 63 ANTICIPATED SALE DATE: JULY 2020
E
OS
8
42
34
19
44 12
4
2
HE 1
6 to 1
1
AV
5 11 41
24
10
2
12
UE
41
15
7
7
16
EN
43.0m br
11
Cam
1
id ge
33
LB
k
al
W
39
10
5
42
5
31
12
1
8
8
31
27
6
IO
10
RO
2
32
N
4
34
AD
1
15
2
8
19
6
5
12
25
1
98
Northumberland Avenue Methodist Church
AD
2
19 1 2
40
37
2
2
45.5m
7
1
15
ND
R
18
11
8
RLA
AD RO
6 m
.9
15
3
SE
BE O
LK
O
FF
SU
16
RD
RO
DFO
BE
NOTE:- Reproduced from the Ordnance Survey Map with the permission of the Controller of H.M. Stationery Office. © Crown copyright licence number 100022432 Savills (UK) Ltd. NOTE:- Published for the purposes of identification only and although believed to be correct accuracy is not guaranteed.
Location Marham Park is located south of the junction between the A1101 and B1106 (Tut Hill), north of the Bury St Edmunds Golf Club, approximately 1.7 miles north west of Bury St Edmunds town centre and adjacent the village of Fornham All Saints to the north. Junction 42 of the A14 dual carriageway is located to the south west. The Leisure site slightly is located south of and fronting the primary movement corridor and to the north of the existing employment site.
PARCE
AD
Y
AD
O
R
CLA
10
40
43.3m
CLO
5 12
RD
UM
30
3
12 14
AD
RO
D
AR
BE
47
32
Birch House
7
O
RTH
20
EX
SS
22
28
55
RTF
2
13
NO
14
32
SU
39
27
RO
12
42
4
33
Drawing Title
AD
S
RTI
CU
to
47
2
44.0m
1
57
135
57
26
46
36
PARCEL E NO. OF UNITS: 13 ANTICIPATED SALE DATE: JULY 2020
26
PARCEL B DEVELOPER: COUNTRYSIDE PROPERTIES NO. OF UNITS: 97 SALE DATE: N/A START ON SITE: SUMMER 2020
El Sub Sta
6
Description Marham Park has received consent for residential development within Use Classes C2 and C3; (ii) local centre (iii) reservation of land for primary education (Class D1) (iv) public open space (sports & leisure facilities, allotments, play facilities and informal open space). The new residential consent is expected to total 1,050 dwellings and is being delivered by a number of national housebuilders. Further detail on housing numbers and delivery can be found under the Phasing section. The illustrative Masterplan within the EIA suggests this site may comprise a building of 3,000 Sq M (30,000 sq ft) up to a height of 15m. The site will further comprise significant areas of informal open space, formal open space including playing pitches and an extensive open access area situated to the north of the Primary Movement Corridor. It has a large frontage on to the Primary Movement Corridor and has an approximate area of 2.008 hectares (4.962 acres).
Access / Services
Proposal
The site can be accessed from the Primary Movement Corridor, (location to be agreed), where all mains services are also located.
Offers are invited for either the freehold or leasehold interest of the leisure site.
Planning
VAT
The site fall within the jurisdiction of St Edmundsbury Borough Council. Marham Park has consent for a hybrid application under planning reference DC/13/0932/HYB. Within this application and the relating Section 106 this site comprises Leisure Use (D2) and could be suitable for squash, tennis and a bowls club to complement the outdoor recreation.
Payable in addition.
Legal Costs Each party to bear their own legal costs incurred in this transaction.
Further Information
Phasing
Further information including plans and technical reports are available. Please contact Savills :
The surrounding new residential development is expected to deliver the following dwelling numbers :
Ben Rudd
[email protected] 01223 347003
2017 – 25 2018 – 100
An additional land parcel for outdoor sports pitches may be available if terms can be agreed for the subject site. Further information available on request.
2019 – 2025 – 150 per annum
COPYRIGHT © MLM CONSULTING ENGINEERS LTD
NOTES
Green Riding
29.7m
West End House Broadlands
A 110
1
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ENGINEER'S, ARCHITECT'S AND SPECIALIST'S DRAWINGS AND THE SPECIFICATION.
Keimal Five Acres
Alpa
ELECTRONICALLY. WRITTEN PERMISSION MUST BE OBTAINED FROM MLM PRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE.
06
Red House
B 11
DO NOT SCALE FROM THIS DRAWING MANUALLY OR
2.
Berguolt
Rosecroft
Hunters Moon
A 110
1
KEY
Fyn
oor
d
Ha
MILDENHALL ROAD ROUNDABOUT WORKS - COMPLETION BY 31st JULY 2017
llo
we
6
s
Fish Farm PIG
Industrial Estate
NE
N LA
e Hy
EO
Mo ot Po int
Th
de
ck)
(Tra
Co
1
pp
Sh
LINK ROAD WORKS - COMPLETION BY 150th OCCUPANCY
29.0m
LINK ROAD WORKS - COMPLETION BY 30 SEPTEMBER 2017
ers
Dr
alo
m
ain
PARCEL L 1.053 HA 2.602 AC (BDW)
Ha
rlyn
Cim
arr
on
Tr
ac
k
PMC HIGHWAY WORKS (TO BINDER COURSE) - COMPLETION BY 30th SEPTEMBER 2017
A 11
01
29.3m
PMC FOOTWAY WORKS (TO BINDER COURSE) - COMPLETION BY 30th SEPTEMBER 2017 LANDSCAPING WORKS - COMPLETION BY 31 DECEMBER 2018
PARCEL K 2.681 HA 6.625 AC (BDW)
SITE ACCESS FOR CONSTRUCTION TRAFFIC - COMPLETION BY 31 MARCH 2017 POTENTIAL HAUL ROAD - TO BE CONFIRMED BY COUNTRYSIDE 3YR TEMP COMPOUND (BDW)
TEMPORARY SITE COMPOUND DEVELOPABLE AREA B4
PROPOSED BUS STOP b
B1
El
Su
ACOUSTIC FENCE - COMPLETION BY 31 JULY 2017
El Sub Sta
A5
LEISURE USE 2.008 HA 4.962 AC
E
AS
CH
CONSTRUCTION TRAFFIC ONLY
Sta
AD
RO A1
45.1m
AY
RN
W
El Sub Sta
HE
RT
TU
T HIL
L
NO
Tk
Trading and Industrial Estate Tk
RN
HE
RT
NO
PARCEL I 1.416 HA 3.499 AC (BDW)
W AY
Posts
Posts
b
FORMAL PUBLIC OPEN SPACE
SCHOOL 2.300 HA 5.683 AC
El
Sta
Su
6 5 4
Stone
d
54.0m
s
ice
Tk
En
pp
Co 1
PARCEL G 1.480 HA 3.657 AC (BLOOR)
MIXED USE 0.123 HA 0.304 AC
Tk Stone
38
15/11/2016
HATCH/COLOURING AMENDMENTS MADE FOLLOWING COUNTYRYSIDE COMMENTS
AJS
P3
11/11/2016
HATCH/COLOURING AMENDMENTS MADE FOLLOWING COUNTYRYSIDE COMMENTS
AJS
MJC
P2
08/11/2016
HATCH/COLOURING AMENDMENTS MADE FOLLOWING COUNTYRYSIDE COMMENTS
AJS
MJC
P1
03/11/2016
FIRST ISSUE
AJS
MJC
Issue
Date
Made
Checked
48
ck
P4
MJC
NT
TE
Tra
31
Stone
33
PO
STREET LIGHTING COMPLETION BY 31 DEC 2017
29
LICENCE REQUIRED
Stone
L
IA
58
59
43
UL HA RO
37.5m
35
5
to4
AD
3
39
RO
to5
VE
68
RN
47
15
53
PARCEL J 3.490 HA 8.624 AC
SE
AD
PARCEL H 2.728 HA 6.741 AC (BLOOR)
11
to
to
19
PARCEL C 3.709 HA 9.165 AC
18
Description
INFORMATION
Drawing Status:
14
31 10
55.2m 40
2
EN
UE
to4
32
76
AV
to3
6
to3
0
En
s
1
24
CU MB
te rp ris e Pa rk
to
ER
4
LA
ND
8
Bu
13
71
5
15
22
11
9
to
to
16
12
44
PARCEL A 5.560 HA 13.739 AC
17
sin
es
23
63
29
22
16
8
Multidisciplinary Consulting
Playground
Stone
6
North Kiln, Felaw Maltings, 46 Felaw Street, Ipswich, Suffolk IP2 8PN Tel: 01473 231100 Website: www.mlm.uk.com
N
LY
26
CE
5
3
43.0m
JO
PARCEL D 2.473 HA 6.111 AC
E
OS
CL
18
2
35
to
2
12 39
1 79
25
7
77
22
15
45.2m
44
to1
9to
Stone
46
5
7
11
19
16
75
17
23 24
6 15
13 30
LD
16
DR
IN
14
14
8
85
1
AR
14
8
S
MARHAM PARK, BURY ST. EDMUNDS
14
0
12
24
25
to
EN
to
AV
83
Shelter
LE
48
47.2m
2
7
UE
77
7
CH
to
CE
6
67
Willow House
IN
5
PR
UE EN
AV
AR
W
Project
12 29
W
89
44.9m
5
BA
E
IV
12
4 2
42
HE 1
12
RL
1
D
5 11 41
24
10
2
41 15
7
7
12
UE
18
43.0m mb
11
Ca
1
ge
rid
m
33
lk
Wa
LB
39
10
5
7
37
5
31
31 1
98
Northumberland Avenue Methodist Church
AD
D
5
OR
DF
BE
Important Notice Savills, their clients and any joint agents give notice that: 1. They are not authorised to make or give any representations or warranties in relation to the property either here or elsewhere, either on their own behalf or on behalf of their client or otherwise. They assume no responsibility for any statement that may be made in these particulars. These particulars do not form part of any offer or contract and must not be relied upon as statements or representations of fact. 2. Any areas, measurements or distances are approximate. The text, photographs and plans are for guidance only and are not necessarily comprehensive. It should not be assumed that the property has all necessary planning, building regulation or other consents and Savills have not tested any services, equipment or facilities. Purchasers must satisfy themselves by inspection or otherwise.
RO
8
1
19 27
2
25
6 10
4
32 12
RO
1
15
2
8
34
AD
N
IO
AJS/BRB
NOV 2016
1:2000
MJC
JNR
1:4000
12
19 21
40
45.5m
2
2 6
8
2
11
EN
16
3
AV
15
AN
AD
1
12
6 to 1
BE
RO
16
42
15
8
E
M
RO
AY
6
40
CONSTRUCTION PHASING PLAN SHOWING LAND SALES
AD
K
OL
FF
SU
CL
10 47
Birch House
3
OS
HU
30
12 14
AD
RO
RO
.9
32
43.3m
CL
5
RD
RT
20
EX
SS
32
SU
AD
D
AR
28
RO
7
FO
NO
26
14
22
BE
27
55
RT
2
13
4
36
39
33
Drawing Title
AD
IS
RT
CU
to
47
2
44.0m
1
57
135
57
26 El Sub Sta
6
44
46
PARCEL B 3.549 HA 8.770 AC
Designed and Produced by Savills Marketing: 020 7499 8644 | June 2017
18 35
15
11
K
IC
W
1
48
36
PARCEL F 1.860 HA 4.596 AC
Client
34 36
27
79
23 to 29 15
PARCEL E 0.392 HA 0.969 AC
1
RH
DU
32
19
64
Golf Course
CL
80
29
78
32
AM
73
OS
8
42
34
E
P4