Asbestos Abatement Project Specifications FORMER GRANITE HIGH SCHOOL SITE BUILDINGS 1, 2, 3, 4, 5, 6 3305 SOUTH 500 EAST SALT LAKE CITY, UTAH 84106
March 14, 2017 Prepared for: Mr. James H. Day, Director Granite School District 2500 South State Street Salt Lake City, Utah 84115 PH: (385) 646-4142
[email protected] Estimated Start Date: TBD, 2017
Completion Date: Estimated 120 days (TBD, 2017)
Prepared by: David C. Roskelley, MSPH, CIH, CSP Certification Number: ASB-1370 (ASBC-237) R&R Environmental, Inc. 47 West 9000 South, Suite 2 Sandy, UT 84070 801-352-2380 Cell: 801-541-1035
Division 02 - Site Work 02 000 General 02 080 Hazardous Material Abatement 02 081 Asbestos Abatement Scope of Work:
Granite High School, 3305 South 500 East, South Salt Lake, Utah,
March 15, 2017
Granite High School Building 1 (Main Building): Material TSI – Aircell / Magbloc Insulation TSI – Plaster Fittings
TSI Crawlspace Debris Transite Chalkboard All Vinyl Floor Tile (9” & 12”) All Floor Tile Mastic Window Glaze
Exterior Caulking Transite Counter Top Material Fan Unit Rope Gasket Fume Hood Wall Texture Wall & Ceiling Texture Plaster Surfacing
HVAC Duct Tape Attic Sealant Wall Compound
Location
Quantity
% Asbestos
Photo #
Condition
Crawlspace, Tunnels, Walls, Ceilings Walls, Ceilings, Crawlspace, Tunnels Scattered in Crawlspace, Tunnels Room 125 Throughout Bldg.
~1,850 lf
Assumed
2
Undamaged
~380 ft²
Assumed
3
Undamaged
~2,100 ft2
Assumed
4
Damaged
67 ft2 55,761 ft2
5 N/A
Undamaged Damaged
55,761 ft2 14,256 lf
Assumed Up to 8% Chrysotile 15% Chrysotile 2% Chrysotile
N/A 6
Undamaged Damaged
7,849 lf 44 ft²
10% Chrysotile 70% Chrysotile
7 8
Undamaged Undamaged
North Fan Room Room 216
72 lf 1 each
9 10
Undamaged Undamaged
Rooms 225, 227, 229 Rooms 221, 239
2,450 ft2
11
Undamaged
12
Damaged
Rooms,111, 112, 114, 115, 213, 214, 215, 216 and adjacent Hallway South Crawlspace Fan Room Northeast Attic Room 126 South
17,602 ft²
35% Chrysotile 12% Chrysotile 4% Amosite Up to 2% Chrysotile Up to 35% Chrysotile 2% Chrysotile
13
Undamaged
68 lf
85% Chrysotile
14
Undamaged
~128 lf 1 ft2
3% Chrysotile 4% Chrysotile
15 N/A
Damaged Undamaged
Throughout Bldg. Windows of North and Center Portions of Building Windows & Doors Room 122
7,748 ft²
Material Roofing Shingle Debris Millboard Electrical Insulator Wall System
Counter Top Material Cove Base Adhesive
Black Vinyl Cove Base
Location North Attic Crawlspace Counseling Area, Office Area, Career Center, Cope Center, Rooms 115, 116 Darkroom near Room 223 Rooms 104, 106, 110, 120, 202, 204, 215, 223, 237A Room 215
Quantity
% Asbestos
Photo #
Condition
150 ft2 spread over 15,000 ft2 3 ft2
30% Chrysotile
16
Damaged
85% Chrysotile
17
Undamaged
~3,350 ft²
Overall