DOCUMENT 00 91 14

Report 2 Downloads 39 Views
NOTICE TO:

All plan holders

DATE:

March 27, 2017

FROM:

Jason Brown, P.E. Engineering Administrator Salt Lake City Public Utilities 1530 South West Temple Salt Lake City, Utah 84115 (801) 483-6840 FAX (801) 483-6818

SUBJECT:

Addendum No. 8 to the contract to the Contact Documents for 500 SOUTH DIVERSION, PHASE 1 PIPELINE, Project No. 525002524

______________________________________________ Transmitted herewith is ADDENDUM No. 8 to the contract documents for the above mentioned project. 1. This addendum addressed questions received on SciQuest. No changes to the Bid Date or the contract documents are being made in this addendum. See responses to questions attached below.

All bids submitted without the signed acknowledgment of this Addendum will be rejected.

Revised January 10, 2005

Addendum No. 8 00 91 13.8 - 0

DOCUMENT 00 91 13.8 ADDENDUM No. 8

PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Changes to the Bid Documents. 1.2

CONSTRUCTION CONTRACT A. 500 SOUTH DIVERSION, PHASE 1 PIPELINE B. Project No. 525002524 C. Date: March 27, 2017

PART 2 2.1

CHANGES

CHANGES TO PRIOR ADDENDA A. NONE

2.2

CHANGES TO BIDDING REQUIREMENTS A. NONE

2.3

CHANGES TO AGREEMENT AND OTHER CONTRACT FORMS A. NONE

2.4

CHANGES TO CONDITIONS OF THE CONTRACT A. NONE

2.5

CHANGES TO SPECIFICATIONS A. NONE

2.6

CHANGE TO DRAWINGS A. NONE

PART 3 ACKNOWLEDGEMENT 3.1 Acknowledgement of receipt of this addendum is made in paragraph 1.4 A. ADDENDA of Section 00 41 00. 3.2 All bids submitted without the signed acknowledgment of this Addendum will be rejected.

END OF ADDENDUM

Revised January 10, 2005

Addendum No. 8 00 91 13.8 - 1

SciQuest Posted Questions and Responses Updated: March 28, 2017 Project No. 525002524 500 South Diversion, Phase 1 Pipeline Addendum No. 8 Question Question No. 84 Detail F on CD-02 Calls for the Trench Backfill to be the same 3/4 inch crushed rock that is used for bedding as per specs 02300 which spec indicates that the select or common fill should be placed above the bedding. Does the owner want 3/4 in crushed rock for the trench zone backfill or some other material? 85 Detail F on CD-02 note 6 states "Contractor is paid with 22" force main bid line item (Entire Alignment)." Is this to mean that we are to include the soft spot excavation detail for the entire alignment, or what percentage of the time are we going to be required to install trench stabilization? 86 The sheet notes on M-07 indicate to coat the manhole interior in accordance with section 09875. Is this all of the manholes or just the 12' manhole? The energy dissipation structure indicates references the same spec but neither the pig retrieval vault nor the odor control vaults reference this. What structures do we need to coat?

Response The backfill is to be placed as shown in detail F on CD-02

Soft Material is expected for the entire alignment.

Concrete coating is only required on the structures where it is called out. Note 1 on M-07 is a Sheet Note, so it applies to all manholes shown on the sheet. This includes both the 12 ft manhole and the access manholes. Note 1 on M-05 applies to the vault shown on this sheet.