DreamLine Enigma 72 Door Shower Door Manual - The Home Depot

Report 0 Downloads 114 Views
ENIGMA - 2 Shower Door Installation Instruction IMPORTANT Please read carefully the following instructions before installing your shower door. If you have any questions regarding shower door installation, please call our technical support specialists Monday through Friday, 9:00AM – 5:00PM EST at 1-866-731-8378 ext. 3 or e-mail our technical support group at [email protected]

Bath AuthorityTM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals or any other details please refer to the BathAuthority.com web page.

Attention: This door is extremely heavy and requires professional installation.

Rev. 2.1

1

Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are included in the package, by marking all the components on the “Detailed Diagram of Shower Door Components”. Examine boxes and packages for shipping damage. If the unit has been damaged, has a finishing defect, or has missing parts, please contact our customer support department within 3 business days of the delivery date. Please note that DreamLine TM will not replace any damaged products or missing parts free of charge after 3 business days or if the product has been installed. Feel free to contact DreamLineTM if you have any questions. 2. If this unit is going to be installed in a new construction, please, install all of the required plumbing and drainage before installing the shower. Use a competent and licensed (if required by local code) plumber for all plumbing installation 3. Please note that you should consult your local building codes on questions on installation compliance standards. Building and plumbing codes vary by location, and DreamLine is not responsible for code compliance standards for your project. 4. Please insure that prior to the installation the tub is leveled and solid and will be able to support the total weight of the unit. Also make sure the walls are at right angles. While some adjustment in leveling of the door is possible, irregular tub level or improper angle of side walls will result in serious problems for your installation. Please, note that some adjustments and drilling might be necessary during the installation process. 5. This unit has to be installed against a finished floor and walls. 6. Please, NOTE! This door does not have out-of-plumb adjustment. Make sure your walls are at right angles. 7. This door requires 31/2" wide threshold or installation space. 8. Please note that Step 7 calls for installation of the door to the wall using anchors. However, the manufacturer strongly recommends installing these heavy doors to the studs or to preinstalled 2x6 wood reinforcement behind the wall and attaching the Wall brackets to it.

Tools Required

Caulk

Level

Rev. 2.1

Tape Measure

Pencil

Caulk Gun

Phillips Screwdriver

Electric Drill

Drill bit (Ø=5/16")

Hammer

Drill bit (Ø=3/8")

Miter saw or Hacksaw

2

Detailed Diagram of the Shower Door Components

7 1 8 2 3

9

4 5

10 11 12 13 14

6

15 16 17

18

20

19

Packing List 01 02 03 04 05 06 07 08 09 10

Door Stopper Stationary glass Guide rail Roller Glass door Handle Glass bracket Guide rail bracket Large anchor Ø 3/8″ Round head screw ST6×45

2pcs 1pc 1pc 4pcs 1pc 1pc 2pcs 2pcs 2pcs 2pcs

11 12 13 14 15 16 17 18 19 20

Hex wrench 3mm, 4mm, 5mm Guide block Bumper strip Threshold cover Threshold Countersunk screw ST4.2×30 Anti-water strip Small anchor Ø 5/16″ Small stationary glass bracket Small stationary glass

1 set 1pc 1pc 1pc 1pc 6pcs 3pcs 6pcs 1pc 1pc

NOTE: Unpack your unit carefully and inspect it. Lay it out and identify all parts using the detailed diagram and packing list in your manual as a reference. Before discarding the carton, check for small hardware bags that tend to fall to the bottom of the box. If any parts are damaged or missing, please contact DreamLineTM for replacement.

Shower Door Installation

Rev. 2.1

3

1. Measure the distance between two finished walls. This distance is marked as “W”. See Fig. 1 for details.

Fig. 1 2. Your Guide rail (03) has been precut for the installation between the walls with a distance of 72”. If W=72”, then it is unnecessary to cut the Guide rail and you can continue to Step #3. If W