LEED 2009 for Healthcare: New Construction and Major Renovations
EA CREDIT 7: COMMUNITY CONTAMINANT PREVENTION - AIRBORNE RELEASES All fields and uploads are required unless otherwise noted.
ALL OPTIONS This static sample form has been modified for offline access. All sections of the form are visible. Sample forms are for reference only. Table EAc7-1. Combustion Emissions Equipment Type
Description
Products of Combustion Manufacturer
NOx1 Limit
Actual
CO
VOC2 Limit
Actual
Limit
Actual
Units
Equipment Meets Allowable Emissions N
All Equipment Meets Allowable Emissions
+
-
N
Notes: 1 For Landfill and Digestor Gas-Fired Stationary Engines, NOx limit is 36 times the efficiency correction factor, in ppm. 2 For Digester Gas-fired Stationary Engines, VOC limit is 250 times the efficiency correction factor, in ppm. All equipment listed must have content equal to or less than the allowable limit for the selected product type.
Does the project have an engine(s) that is 1,000 bhp or greater? Yes
No A NOx Continuous Emission Monitoring System (CEMS) with data gathering and retrieval capability will be installed, operated, and maintained in calibration.
ADDITIONAL DETAILS Special circumstances preclude documentation of credit compliance with the submittal requirements outlined in this form.
LEED 2009 for Healthcare: New Construction and Major Renovations EA Credit 7: Community Contaminant Prevention - Airborne Releases
SPECIAL CIRCUMSTANCES Describe the circumstances limiting the project team's ability to provide the submittals required in this form. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.
Upload EAc7-SC. Provide any additional documentation that supports the claim to special circumstances. (Optional)
Upload
The project team is using an alternative compliance approach in lieu of standard submittal paths.
ALTERNATIVE COMPLIANCE PATH Describe the alternative compliance path used by the project team. Include justification that this path meets the credit intent and requirements. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.
Upload EAc7-ACP. Provide any additional documents that support the alternative compliance path approach. (Optional)
LEED 2009 for Healthcare: New Construction and Major Renovations EA Credit 7: Community Contaminant Prevention - Airborne Releases