Electrical Cost Data 2014 - RSMeans

Report 26 Downloads 177 Views
RSMeans Electrical Cost Data 2014

RSMeans Electrical Cost Data ®

Up-to-date data for the latest electrical products, materials, and methods

2014 37th annual edition

Cost data from the most quoted name in construction

Electrical Cost Data 2014 Catalog #60034   Price: $196.95

Simplify the process of estimating electrical construction projects with this versatile reference guide. Get updated, accurate, location-specific prices to tackle any kind of electrical estimate. Improve your estimates with this all-inclusive guide. • Resources for all types of estimators including designers, engineers, and contractors • Cost recommendations for both designing and planning electrical work • Comprehensive cost entries—from high-voltage transmission lines to residential wiring • Cost-saving tips and ideas

What you’ll find inside: • UPDATED! Over 13,900 unit costs and 1,300 assemblies costs covering the latest products, materials, and electrical construction methods • Expanded green building materials including LED fixtures, car charging stations, and more • Sample estimates in both print and electronic format to guide customization and improve accuracy • City Cost Indexes and Location Factors for over 930 U.S. and Canadian locations • Updated equipment rental costs, crew size projections, labor hours, and labor rates • Detailed reference information • Square foot costs

Plus: • Receive free quarterly cost index and key material price updates for a full year!

Your 2014 book includes: • A full sample estimate designed to help you improve estimating accuracy • Easy-to-follow “How RSMeans Data Works” pages

Electrical Cost Data 2014 26 01 Operation and Maintenance of Electrical Systems

26 01 40 − Operation and Maintenance of Electrical and Cathodic Protection Systems

26 01 40.51 Electrical Systems Repair and Replacement 0010 ELECTRICAL SYSTEMS REPAIR AND REPLACEMENT 3000 Remove and replace (reinstall), switch cover 3020 Outlet cover

Daily LaborCrew Output Hours Unit 1 Elec 

60 60

.133 .133

Ea. 

16 16 4

.500 .500 2

Ea.

Material

2014 Bare Costs Labor Equipment

Total Incl O&P

Total

7.10 7.10

7.10 7.10

10.65 10.65

26.50 26.50 107

42.25 41.25 107

57.50 56 160

1.76 2.13 2.83 5.35 1.04 1.22 1.71 2.51 3.71 1.08 1.31 1.81 2.75

1.76 2.13 2.83 5.35 1.04 1.22 1.71 2.51 3.71 1.08 1.31 1.81 2.75

2.64 find information easily and use it correctly. 3.19 4.23 8 1.56 RSMeans Line Numbers consist of 12 characters, which identify a 1.83 unique location in the database for each task. The first 6 or 8 digits 2.56 conform to the Construction Specifications Institute MasterFormat® 2012. 3.76 The remainder of the digits are a further breakdown by RSMeans in order to arrange items in understandable groups of similar tasks. Line numbers 5.55 are consistent across all RSMeans publications, so a line number in any 1.62 RSMeans product will always refer to the same unit of work. 1.96 2.71 4.12

.62 .75 .71 .83 .83 1 1.25

.62 .75 .71 .83 .83 1 1.25

.93 RSMeans Descriptions are shown in a hierarchical structure to make them readable. In order to read a 1.12 1.06 complete description, read up through the indents to the top of the section. Include everything that is above and 1.24 to the left that is not contradicted by information below. For instance, the complete description for line 03 30 1.24 1.50 53.40 3550 is ‘‘Concrete in place, including forms (4 uses), Grade 60 rebar, concrete (Portland cement Type 1.87 1), placement and finishing unless otherwise indicated;

.59 .65 .68 .95

.59 .65 .68 .95 1.71 1.97 2.57 3.74 35.50 .89 1.39

26 01 50 − Operation and Maintenance of Lighting 26 01 50.81 Luminaire Replacement 0010 LUMINAIRE REPLACEMENT 0962 Remove and install new replacement lens, 2 x 2 troffer 0964 2 x 4 troffer 3200 Remove and replace (reinstall), lighting fixture

1 Elec 



15.75 14.75

26 05 Common Work Results for Electrical 26 05 05 − Selective Electrical Demolition

How RSMeans Unit Price Data Works

26 05 05.10 Electrical Demolition 0010 ELECTRICAL DEMOLITION 0020 Conduit to 15 high, including fittings & hangers 0100 Rigid galvanized steel, 1/2 to 1 diameter 0120 1-1/4 to 2 0140 2-1/2 to 3-1/2 0160 4 to 6 0170 PVC #40, 1/2 to 1 0172 1-1/4 to 2 0174 2-1/2 0176 3 to 3-1/2 0178 4 to 6 0200 Electric metallic tubing (EMT), 1/2 to 1 0220 1-1/4 to 1-1/2 0240 2 to 3 0260 3-1/2 to 4 0270 Armored cable, (BX) avg. 50 runs 0280 #14, 2 wire 0290 #14, 3 wire 0300 #12, 2 wire 0310 #12, 3 wire 0320 #10, 2 wire 0330 #10, 3 wire 0340 #8, 3 wire 0350 Non metallic sheathed cable (Romex) 0360 #14, 2 wire 0370 #14, 3 wire 0380 #12, 2 wire 0390 #10, 3 wire 0400 Wiremold raceway, including fittings & hangers 0420 No. 3000 0440 No. 4000 0460 No. 6000 0462 Plugmold with receptacle 0465 Telephone/power pole 0470 Non-metallic, straight section 0500 Channels, steel, including fittings & hangers 0520 3/4 x 1-1/2

R260105-30 1 Elec  2 Elec  1 Elec

242 200 302 160 410 350 250  2 Elec 340  230 1 Elec 394 326 236  2 Elec 310

.033 .040 .053 .100 .020 .023 .032 .047 .070 .020 .025 .034 .052

L.F.

1 Elec 690 571 605 514 514 425 342 

.012 .014 .013 .016 .016 .019 .023

L.F.

1 Elec 720 657 629 450 

.011 .012 .013 .018

L.F.

1 Elec 250 217 166 114 12 480 

.032 .037 .048 .070 .667 .017

L.F.

Ea. L.F.

1.71 1.97 2.57 3.74 35.50 .89

1 Elec 308

.026

L.F.

1.39





All RSMeans unit price data is organized in the same way. It is important to understand the structure, so that you can

RSMeans engineers have created reference information to assist you in your estimate. If there is information that applies to a section, it will be indicated at the start of the section. In this case, R033105-10 provides information on the proportionate quantities of formwork, reinforcing, and concrete used in cast-in-place concrete items such as footings, slabs, beams, and columns. The Reference Section is located in the back of the book on the pages with a gray edge.

Equipment pad (3000 psi), 4' x 4' x 6" thick.’’



.89 .97 1.02 1.42 When using RSMeans data, it is important to



2.56 read through an entire section to ensure that you use the data that most closely matches your work. 2.94 Note that sometimes there is additional information 3.85 shown in the section that may improve your price. There are frequently lines that further describe, 5.60 add to, or adjust data for specific situations. 53 1.33 2.07

96

The data published in RSMeans print books represents a “national average” cost. This data should be modified to the project location using the City Cost Indexes or Location Factors tables found in the Reference Section (see pages 492–540). Use the location factors to adjust estimate totals if the project covers multiple trades. Use the city cost indexes (CCI) for single trade projects or projects where a more detailed analysis is required. All figures in the two tables are derived from the same research. The last row of data in the CCI, the weighted average, is the same as the numbers reported for each location in the location factor table.

Also Available Online and in eBook form!

2

Visit us online: RSMeans offers an extensive line of cost data products in book, eBook, online, and CD format, along with professional development seminars, reference books, market analytics, and more. Visit www.rsmeans.com to learn what RSMeans can do for you!