DA AFGHANISTAN BRESHNA SHERKAT CEO Presentation Abdul Razique Samadi, CEO

ENERGY CONSUMPTION AND AVAILABLE ENERGY RESOURCES IN AFGHANISTAN

‫دافغانستان برښنا شرکت لوی رياست‬

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

Presentation Summary •

Overview of Afghan Power Sector



Energy Consumption at DABS



DABS Loss Reduction Strategy



Energy Efficiency Initiatives



Renewable Resources and Clean Energy

‫دافغانستان برښنا شرکت لوی رياست‬

2

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

Afghanistan Energy Sector Afghanistan Energy Infrastructure, generation, transmission and distribution were almost destroyed over the past three decades due to the war and conflict. The government of Afghanistan corporatized the National electricity service department Da Afghanistan Breshna Mossasa (DABM) into an independent state owned utility. As such, all assets, staff and other Rights and Obligations of (DABM) were transferred to Da Afghanistan Breshna Sherkat (DABS) on May 2008. ‫دافغانستان برښنا شرکت لوی رياست‬

3

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

Power vs. GDP • Power Foundational to Stabilization • Increased Power Fuels Economic Growth

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

Energy Driving Afghan Economy Afghanistan Economy & Energy

US$, Bn 20

GWh, Th 3

18 2.5

16 14

2

GDP

12

Annual Elec.  Production

10 8

1.5 1

6 4

0.5

2 0

0

2006 ‫دافغانستان برښنا شرکت لوی رياست‬

2007

2008

2009

2010 5

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

Power Supplies – meeting burgeoning demand • • • •

Develop/Expand import agreements Support private investment in 200 MW Sheberghan gas plant Construct run‐of‐river hydropower on Kabul river & Other Water Resources Support trans‐boundary dialogue on shared water resource development

Power Transmission & Distribution – moving power to the people  • Strengthen TL backbone from Uzbekistan through Kabul to Kandahar • Synchronize systems with neighboring countries • Expand access to homes, businesses, industry and the mining sector

Capacity – building sector governance • Facilitate the commercial viability of DABS • Build trans‐boundary and investment promotion capacity at MoEW • Strengthen regulatory capability and oversight ‫دافغانستان برښنا شرکت لوی رياست‬

6

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

Supply and Demand • Demand Growth:  Connections • Routing:  Transmission Lines • Supplies:  Production and Imports Surobi II Hydro

MEGAWATTS

1400 1200 1000 800

Sheberghan IPP NEPS Expansion

600 400 200

‫دافغانستان برښنا شرکت لوی رياست‬

Generation & Transmission Eastern Corridor Demand Imports & Transmission

Actual   Projected

7

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

Major Donor Assistance Projects •

Operations and Commercialization (USAID 2008‐today)



NEPS Construction (ADB/India 2007‐2009)



Tarakhil 100MW TPP (USAID 2006‐2009)



Kandahar Helmand Project (USAID 2010‐2013)



Transmission, Expansion Connectivity (USAID 2011‐14)

‫دافغانستان برښنا شرکت لوی رياست‬

8

System  Afghanistan  Sustainable  Near‐term Power  Constraints and  Power Sector COIN Power  Availability Expansion Opportunities Turkmenistan

Uzbekistan

Uzbekistan Imports  100MW to 470MW $20M ($.06/KwH) Qal'a‐i Mamay

NEPS 2 Expansion 600MW Capacity $400‐600M 48 Months

Iran

445

Sheberghan

150

Sheberghan Gas Field

54

400

48

Kelegai

Fertilizer Plant Pul‐e‐Khumri Substation

Northern  Run‐ of‐River  Hydropower  Tajikistan Imports  Untapped 300MW  1,200MW April‐ October ADB ‐$2.5 to $3B Construction  48 Months Underway ($0.035  KwH)

Aynak Coal

SEPS Expansion Sheberghan Gas Field Kajaki Power and  Kajaki Unit 2 Thermal Power Plants  Irrigation Expansion from 34 to 52MW Power and Gas Lines 60‐100MW Plus Transmission  200MW + 48MW $400 to $500M and Distribution $440M ($.06/KwH) $442M 60‐84 Months 24 Months 32‐38 Months

250 Tarakhil

Proposed 500kV Line Existing 220kV 2 Circuit Proposed 22okV 2 Circuit Existing 110kV Line Proposed 110kV Line Existing 20kV Import Line Proposed 500/220kV  Substation

Existing/Proposed 110kV  Substation 27

5234

Kajaki

Proposed Natural Gas Pipeline TPP

Thermal Power Plant Hydropower Plant (proposed)

Baghdara

Shal

800

100 Naghlu Gamberi 36 22 Sarubi

180

Sarubi 2

11

Darunta

Aynak Copper

SEPS

Existing/Proposed 220kV  Substation

Existing Natural Gas Pipeline

NEPS

Hajigak Iron

Gulbakhar

400

66

105

TPP

120

Dala

Natural Gas Field

Pakistan

NEPS‐Kandahar  Transmission and  Tactical Tie‐in Distribution to  30MW‐150MW Eastern Populations  $350M  400MW Capacity 36 Months $280M 24‐30 Months

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

Energy Consumption at DABS •

The availability of power in Afghanistan has improved significantly over  the last two years: ‐

105MW thermal power plant at Tarakhil was commissioned 1388



North Eastern Power System improving power imports from Uzbekistan was  commissioned in 2010 and added an extra 550MW capacity to regional grid



Rehabilitation of Hydro Stations serving Kabul: Naghlu,  Sarobi, Mahipar



Power supply to Kabul has improved dramatically 



The challenge is now to improve commercial performance and customer  service and reduce non‐technical losses.



Kabul Electricity Service Improvement Program (KESIP) is a USAID initiative  to support the commercialization and revenue improvement at DABS 

‫دافغانستان برښنا شرکت لوی رياست‬

10

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

Energy Consumption at DABS •

Energy Consumption for entire Afghanistan in 1389 was 1.8 GWhr ‐

This represents a 18% improvement on previous year 1388



and a 80 % improvement on consumption compared with 1387



Total number of DABS customers served throughout Afghanistan in 1389 was  786,302 customers



The average annual consumption per customer category for the year 1389: Average Consumption in kwh per year

1388

1389

Household

kwh

1,641

kwh

1,843

Commercials

kwh

2,298

kwh

2,967

Governmental

kwh 36,211

kwh

32,694

Holy places

kwh

2,216

kwh

2,604

NGO's

kwh

8,405

kwh

8,898

Registered factories

kwh 60,897

kwh 123,095

Unregistered factories

kwh 33,365

kwh

‫دافغانستان برښنا شرکت لوی رياست‬

31,369 11

DA AFGHANISTAN BRESHNA SHERKAT

 1,600,000  1,400,000  1,200,000

1,112,631 

 1,800,000

1,318,695 

 2,000,000

1,512,419 

Annual Energy Consumption (MWh) DABS Customers  Consumption  1389 Vs.1388

1,782,839 

‫دافغانستان برښنا شرکت‬

 1,000,000

20,296 

22,321 

91,337 

76,487 

8,578 

6,119 

14,443 

13,152 

157,522 

 200,000

152,629 

 400,000

171,969 

 600,000

129,080 

 800,000

 ‐

1388 ‫دافغانستان برښنا شرکت لوی رياست‬

1389 12

‫دافغانستان برښنا شرکت لوی رياست‬

136,895 

145,436 

601,352 

477,779 

Revenues in million AFA 8,081,598 

56,598 

6,645,283 

1389

83,809 

1388

133,810 

118,506 

1,543,224 

1,489,455 

1,564,204 

1,206,920 

4,018,302 

3,150,589 

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

13

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

Energy available for system  Actual 

Actual 

Forecast

1388

1389

1390

2,313,193 

2,737,767 

3,002,825 

936,520 

871,171 

927,472 

876,896 

772,803 

827,525 

3,562 

41,245 

38,950 

Diesel generator

56,061 

57,123 

60,998 

Import

1,376,673 

1,866,596 

2,075,353 

Republic of Uzbekistan

657,183 

964,242 

1,102,800 

Republic of Turkmenistan

323,662 

386,306 

420,650 

74,347 

87,234 

102,623 

321,481 

428,813 

449,280 

Internal generation

Hydro Thermal

Republic of Tajikistan  Islamic Republic of Iran

‫دافغانستان برښنا شرکت لوی رياست‬

Energy Available in mwh  2,500  2,000

1,377 

 1,500  1,000

2,075 

1,867 

937 

871 

927 

 500  ‐ 1388

1389

1390

Actual

Actual

Forecast

Internal generation

Import

14

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

Actual and Forecast Revenues by Customer Category Revenues in AFA

Actual  1388

Actual  1389

Forecast 1390

Revenues in AFA  4,500,000,000

Household

3,150,588,669  4,018,302,183  4,263,851,967 

Commercials

1,206,919,568  1,564,204,457  1,578,756,042 

 4,000,000,000  3,500,000,000  3,000,000,000

Governmental

1,489,455,180  1,543,224,409  1,622,733,415 

 2,500,000,000  2,000,000,000

Holy places

118,505,651 

133,810,231 

121,514,042 

NGO's

56,597,895 

83,809,201 

88,023,749 

 1,500,000,000  1,000,000,000  500,000,000

Registered factories

477,779,413 

601,351,982 

737,833,826 

Unregistered factories

145,436,305 

136,895,482 

287,286,960 

Total

 ‐

6,645,282,680  8,081,597,944  8,700,000,000 

Exchange rate

46.00 

46.00 

46.00 

$   144,462,667  $   175,686,912  $   189,130,435 

‫دافغانستان برښنا شرکت لوی رياست‬

Actual  1388

Actual  1389

Forecast 1390

15

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

DABS Loss Reduction and Revenue Improvement Plan The DABS Loss Reduction Plan: •





Process Enhancement Initiatives to include: ‒

Customer enumeration and verification



GIS Regularisation



Customer Service Improvements



Commercial process enhancement

Investment Initiatives to include: ‒

Boundary and Grid Meters



Replace analogue meters with digital meters



New Customer Information System (CIS) and  Customer Relationship  Management (CRM) System



Upgrade of vehicles, tools and equipment

USAID, KESIP Providing Technical Assistance and Support

‫دافغانستان برښنا شرکت لوی رياست‬

16

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

Energy Efficiency Initiatives at DABS •





Load Management Initiatives ‐

Skills trainings and capacity building 



Identification of grid defects through data analysis



Transmission line maintenance program



Decreasing the number of over loaded feeders 



Decreasing the number of over loaded Transformer stations

Energy Loss Reduction ‐

Installation of grid meters : “Proof of Concept” Pilot being implemented in  Kabul



Revenue Protection Department conducting Meter Audit of entire Kabul

Community Awareness Program: media campaign, brochures, leaflets, etc. 

‫دافغانستان برښنا شرکت لوی رياست‬

17

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

Energy Efficiency Plans at DABS •

Automatic Meter Reading (AMR) Meters  •



Pilot planning in process for largest industrial customers in Kabul

Prepaid Metering •

Pilot planned for 10,000 customers in Macroryan area of Kabul



Upgrading of the system (15kv to 20kv)



Developing computerized tool for optimization of our  generation and imported power.

‫دافغانستان برښنا شرکت لوی رياست‬

18

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

Available Renewable Resources  •

Hydro power potential for Afghanistan is in excess of 23,000 MW  (large, medium and micro hydro power plants )



Solar power potential is best in Southern Afghanistan (see map) 



Wind power potential best in the Western Region of Afghanistan (see  map)



USAID has provided support for the establishment of a Clean Energy  Program in Afghanistan. Program has developed pilot projects: ‐

Solar pilot projects have been implemented at 6 schools in Bamyan and  Nuristan, and 2 clinics in Ghazni



Solar pilots for water pumping and solar heaters also being developed



Mini‐hydro rehabilitation project was implemented in Panjshir



Wind water pumping projects also planned in Heart and Balkh Provinces

‫دافغانستان برښنا شرکت لوی رياست‬

19

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

Solar Energy Resources in Afghanistan

‫دافغانستان برښنا شرکت لوی رياست‬

20

DA AFGHANISTAN BRESHNA SHERKAT

‫دافغانستان برښنا شرکت‬

Wind Energy Resources in Afghanistan

‫دافغانستان برښنا شرکت لوی رياست‬

21

Uzbekistan

Afghanistan  Vision 2014/2015

Qal'a‐i Mamay

Turkmenistan

445

Sheberghan

200

54 48

Sheberghan Gas Field

Iran

Transboundary agreements developed  Major  hydropower  and major hydropower  projects on Kunar and  projects on Kunar and  Amu Darya rivers  Amu Darya rivers  initiated  initiated 

Kelegai

Fertilizer Plant Pul‐e‐Khumri Substation

MCC Coal MCC coal deposit  quantified and  construction on  400MW Thermal  Power Plant underway

Proposed 500kV Line Existing 220kV 2 Circuit Proposed 22okV 2 Circuit Existing 110kV Line

Tarakhil 105

Hajigak Iron

TAPI gas pipeline and  extension of 220kV   power transmission  network to Herat  under development

Shal 800+

400 66

Baghdara 100 Naghlu Gamberi 36 22 Sarubi 180

11

Darunta

Sarubi 2

Aynak Copper

Proposed 110kV Line Existing 20kV Import Line Proposed 500/220kV  Substation Existing/Proposed 220kV  Substation Existing/Proposed 110kV  Substation Existing Natural Gas Pipeline

27

5234

Kajaki

Proposed Natural Gas Pipeline TPP

Thermal Power Plant Hydropower Plant (proposed)

Dala

Natural Gas Field

Pakistan

Power  transit and  Power  transit and  export lines to Pakistan  export lines to Pakistan  for power from  from Turkmenistan  Turkmenistan and   and Tajikistan (CASA  Tajikistan, as well as  1000);  surplus generation

Tashakor!