®
Presented By:
Pipe Spy, Inc. PO Box 5774 Berkeley, CA 94705
OFFICE
510 465 3000
FAX
510 465 3085
[email protected] LICENSE TO ROOT #754966
www.pipespy.com
PLUMBING + DRAIN + SEWER CONTRACTORS
Prepared For:
ESTIMATE
Erin Coyle 3126 Shattuck Ave Berkeley, CA 94705
Your Contact Info:
Date: No.:
[email protected] 6/21/2017 13557
Project Location: 2425 California St., Berkeley
510.548.7878 APPROVED BY:
Signature and Date: Print Name: DESCRIPTION
TOTAL
Pipe Rehabilitation - Upper lateral Upon camera inspection the sewer lateral exits on the West front of the building, and it runs down to the city of Berkeley curb clean out. The sewer lateral is 4" clay material approximately 50ft long. The sewer lateral will have to be replaced to meet city of Berkeley compliance.
6,375.00
The sewer lateral replacement includes: * Saw cut, demolition and removal of concrete sidewalk as necessary. * Excavation of sewer lateral at the house outlet, and at the sidewalk. * Trenchless installation of a new 4" HDPE SDR 17 pipe from house to the curb. * Installation of new cleanout fittings. * Placement of a gravel bed under any exposed pipe sections. * Testing and inspection of the new sewer lateral. * Backfill and proper soil compaction. * Restoration of the disturbed concrete. * Restoration of any disturbed garden areas. * Removal of construction equipment and job site clean up. ***This scope of work and contract is validated with a signed Terms and Conditions Agreement.***
350.00
Permit and Inspection Fees - City of Berkeley NOTES: The sewer lateral replacement will meet city of Berkeley 20 year compliance.
We thank you for this opportunity, and sincerely hope to earn your business. Competence In Action© is our commitment to you! If you have any questions about this estimate, please contact us at 510-465-3000.
TOTAL
$6,725.00 PSI-E2 (07-16)
®
Presented By:
Pipe Spy, Inc. PO Box 5774 Berkeley, CA 94705
OFFICE
510 465 3000
FAX
510 465 3085
[email protected] LICENSE TO ROOT #754966
www.pipespy.com
PLUMBING + DRAIN + SEWER CONTRACTORS
Prepared For:
ESTIMATE
Erin Coyle 3126 Shattuck Ave Berkeley, CA 94705
Your Contact Info:
Date:
6/21/2017
No.:
[email protected] 13555
Project Location: 1340 Blake St., Berkeley
510.548.7878 APPROVED BY:
Signature and Date: Print Name: DESCRIPTION
TOTAL
Pipe Rehabilitation - Upper lateral Upon camera inspection from the curb clean out, the sewer lateral exits on the rear back,in front of the 4 plex, than it runs down to the front unit ( 1340 Blake), where than it runs down to the city of Berkeley sidewalk clean out. The sewer lateral is 4" PVC, and 4" clay material, with 2 outlet connections. The sewer lateral will require a clean out installation, and a partial Trenchless replacement under the sidewalk to remove clay section.
4,557.00
The partial replacement includes: * Sawcut and removal of concrete. * Excavating of the sewer at the house, behind the curb, and at the City of Berkeley curb clean out. * Trenchless installation of 4" HDPE SDR 17. * Installation of gravel bed on all connections. * Testing and inspection of the partial sewer lateral repair. * Backfill and proper soil compaction. * Removal of all construction equipment and job site clean-up. * This scope of work comes with a terms and conditions agreement***
350.00
Permit and Inspection Fees - City of Berkeley NOTES: If the sewer lateral holds the pressure test, it will comply with city of Berkeley 7 year certificate. NOTES: If the sewer lateral doesnt pass the pressure test scope of work will change, and the amount of $ 3,250.00 will add on. This will meet 20 year compliance.
We thank you for this opportunity, and sincerely hope to earn your business. Competence In Action© is our commitment to you! If you have any questions about this estimate, please contact us at 510-465-3000.
TOTAL
$4,907.00 PSI-E2 (07-16)