tks
ffi-ffiffi&effi Wffiffiffi% AUDrO REQUTREMENTS 2016 ALL ELEMENTS MUST BE OF PROFESSIONAL TOURING GRADE QUALITY ALL SUBJECT TO CDB/PM APPROVAL APPROVED FOH CONSOLES: DigiDesign S6L / Profile / SC-48 / D Show, Yamaha PM-SDRH v.2.23 minimum, CL-5. PARTIAL LIST OT NOIi{-APPROVED FOH CONSOLES: Pro2,M7CL,4K. No A&H. No Soundcraft. No Crest don't even ask. Private Comm between FOH and Monitor consoles REQUIRED. NO EXCEPTIONS. Note: CDB FOH Console, snake and splitter channels must be dedicated to CDB use only. 16 Channels are available for support acts. Please supply a second splitter as the show requires.
CDB LINES MAY NOT BE I]NPATCHED FROM LINE CHECK THROUGH PERFOR]VIANCE CONTACT CDB PM FOR APPROVALS, CLARIFICATION, OR DIGITAL EXCEPTION
MAIN SPEAKER SYSTEM: Flying Stereo Late Model Line ArayiPoint Source System including down/center/out fills as required to cover all paid seating areas. Subs on last console aux. System Control access will be at FOH.
NO'HOMEMADE', AFTERMARKET or CONSUMER GRADE PA BOXES WILL BE ACCEPTED ORAPPROYED
MONITOR CONSOLE: Console must have a MINIMUM of 48 channels, 4 band fully Parametric EQ wA/ariable High Pass Filters each channel. Private Comm between FOH and MON consoles REQUIRED, Systems MON Tech will serve as CDB MON Engineer for the day. Note: CDB MON Console channels, splitter channels MUST be dedicated to CDB use only. Support can use all open channels following CDB on the splitter. Please supply a second splitter as the show requires.
CDB LINES MAY NOT BE UMATCHED FROM LINE CHECK TIIROUGH PERFORMANCE CONTACT CDB PM FOR APPROVALS, CLARIFICATION, OR DIGITAL EXCEPTION
MONITOR SYSTEM REQUIREMENTS: CDB will provide Mics/Stands/Dl's for CDB use only. CDB will provide Charlie's wedges,2x Meyer 2l2{.Drive is XLR direct from console, 1 XlRjumper, I AC quad. Eight (8) Matching BiAmped Monitor Wedges, 12" or 15" speaker, 1 Drum Sub. No "PA on a stick" boxes. Be prepared for 8 mixes on 8 graphs minimum, in case of guests or additional filI needs. No Side Fills Required. Cue wedge for engineer REQUIRED. Contractor will provide all stage AC requirements as per plot. Three 75' (seventy five foot minimum) 12 Pair Subsnakes w/ cross patch capable split, and minimum 40 mic cables for CDB use only. 2 Systems Techs (1 Folyl MON) must be present during all setup, check, and operational times. Bob Workman CDB PII{/FOH (615)430".3688
[email protected] www.charliedaniels.com/production
ffiffirffir& INPUT LIST 20168 DRUM RISER
L
DRUM RISER R 12or under Ride
DOWNSTAGE
HOME RUN
FOH
INPUT
CDB
to cDB split
Provided
ch#
Name
1
1
K
PR.4O
2
2
5n
PR.31BW
3
3
Sn Btm
PR-318W
4
4
Hat
PR-318W
5
5
Ride
PR.31BW
5
6
T
PR-318W
7
7
FL
PR.31BW
8
8
u/H-sR
PR-318W
9
9
PR.31BW
10
10
U/H.SL Guest 1
11
lL
Guest 2
JDI
12or under Hat
8pr at B-3
t2
xlr
L2
Bass
Avalon
L
13
JDI
2
L4
3
15
4
15
Fiddle Aco-1 Guest/Soare Gtr Cntr zlx12" Gtr
5
L7
SR
6
18
Aco-2
7
19
SL
Gtr Gtr
JDI
PR-318W PR-318W PR-318W JDI
PR-318W
7
20
Key-R
2
2t
Key-L
JDI
3
22
Les-R
PR-318W
4
23
Les-L
PR.31BW
5
24
Les-Low
JDI
6
25
KEY V
PR.35
JDI
26
SRV
PR.35
HR
2l
CNTR V
PR.35
HR
28
stv
PR.35
at solitter
HR
29
RF-MC/Spare V
RC-35/xlr
at splitter
HR
30
RF-Spare Fiddle
xlr
7
31 32 33
34 35 36 37
38 Bob Workman PM/FOH
(61s143G3688
[email protected] 39 40 4L 42
Monitor Desk Stage Left Please
43
Contractor provides all stage A/C,xlr,subsnake needs
M
No Cables on the deck Until CDB Load ln System Tech will Mix Monitorc for CDB
45 46 47 48
c E $
ffim
o
E6* FEH NEE
iEE B t4 J.oo c > .(-!
ra
lqtr Lcl
T [=l tB
EH
lol
lol
=8fi
I
H frl Li_l l6Et
\o T F{ o (f,
ll,l
l@@l
Li_.1
t6-6t
N o {-,
CL
-
laet
IFI E l-l
[r-l
(l,
a
E
i :,
6rJ
l-:l l-J
l-l
tr
G]
Hs
o &rEH l.l o
t-fl LFJ
Nffi H
fr-l
a *,
cs
o
U
EH
[EffiM MP HH