Fire House no. 2

Report 4 Downloads 169 Views
FIRE HOUSE NO. 2 Township of Verona Dennis A. Mylan, RA, PP The Mylan Architectural Group Report Dated: March 10, 2016

FIRE HOUSE 2

FIRE HOUSE NO. 2 - OPTIONS 1.

Repair of Existing Fire House

2.

Structural Repairs & Building Addition

3.

Demolish Existing Building & Construct New Fire House

4.

Construct New Fire House on Larger Site.

EXISTING – FIRE HOUSE 2 Building Size: 5500 sf Existing Site: 78’ x 139’ Parking Spaces: 10

FIRE HOUSE NO. 2 New 2 Story Fire House on Existing Site

FIRE HOUSE NO. 2 New Fire House on Existing Site – 1st Floor

FIRE HOUSE NO. 2 New Fire House on Existing Site - 2nd Floor

PROPOSED ONE STORY Minimum Site Size Requirement: 130’ x 230’ +/-

Building Size: 10,000 sf =/Parking Spaces: 12 - 18 minimum