FOR SalE 85 ELECTrOnIC AvEnuE PORT MOOdy, BC

Report 0 Downloads 24 Views
FOR Sale 85 Electronic Avenue Port Moody, BC L E E –A S S O C I AT E S .CO M | 6 0 4 6 8 4 7 1 1 7

Rocky Point Park

SUBJECT

Moody

Spring St

Ave

St Johns St

Electronic

St

Murray St

Moody Centre Rapid Transit Station

Future Development Site Property Highlights ff Potential to assemble neighbouring properties ff Spectacular views of Burrard Inlet ff Site within walking distance of rapid transit, restaurants, grocery stores, parks, schools, and entertainment ff Opportunity to gain foothold into emerging area

Steve Caldwell

Chris McIntyre

Personal Real Estate Corporation

Personal Real Estate Corporation

dir: 604 895 2224

dir: 604 630 3392

cel: 604 809 3122

cel: 604 889 0699

[email protected]

[email protected]

Barnet Hwy

FO R Sa l e 8 5 E lect ronic Aven ue P ort Moody, BC

Location

Building Area (Approx.)

The property is centrally located on the northwest corner of Spring

Warehouse (manufacturing) area

Street and Electronic Avenue in central Port Moody. The property

Ground floor office

1,700 SF

is strategically located one block north of St. Johns Street and

Mezzanine office

1,700 SF

within a half a block walking distance to the new Evergreen Line

Total

13,887 SF

17,287 SF

Moody Centre Station.

Tenancy Information

Zoning

The building will be sold vacant.

The property is currently zoned M-1 (Industrial). The City of Port Moody has adopted a new Official Community Plan (OCP). The property

Building Features

falls within Moody Centre Station transit-oriented development area.

ff 18’ clear ceiling heights in the easternmost warehouse bay

Said area supports development of mixed use, pedestrian friendly

ff 24’ clear ceiling heights in the westernmost warehouse bay

development within a 400 metre radius of Moody Central Station.

ff Heavy 3 phase industrial power

Building forms are diverse ranging from low and mid rise forms, and

ff 2 grade level loading doors

include a mix of uses including residential, retail, office, service, civic,

ff Heavy floor load capacity

institutional, recreational and cultural uses. The City is in the process

ff Fully finished and air conditioned office area

of public consultation in order to determine specific zoning guidelines,

ff Ample parking and truck maneuvering room

which will outline specific densities and amenity contributions.

ff All lighting within the warehouse area has recently been

Proposed height limits have ranged from 6 to 40 stories.

COMMUNITY

upgraded to power smart standards

Legal Description

Property Taxes (2016)

LOT 61 DL 190 GROUP 1 NWD PL 37998; PID 008 449 660

$55,432.56

Lot Size

Asking Price

24,881 SF (approx. 110’ x 220’)

$7,850,000

OF

EVERGREEN LINE SU

4

400m (5 min) 400m (5 min)

400m (5 min)

E

6

A

3 6 6

6 6

6

26 6

3 6

6

FUTURE POTENTIAL STATION

26 3

6

3

C

3

3

3

3

3 4

4

6

6 4

B

6

F 3 3

Steve Caldwell

Personal Real Estate Corporation LINE SUB AREAS dir: 604 895 2224

Westport

cel: 604 809 3122

pring [email protected] Street Promenade

eritage Commercial District

Murray Street Boulevard

ceanfront District

Lee & Associates Vancouver

SUBJECT

D

6

6

MOODY CENTRE STATION

6

3

6 4 - 12

6

3

12

6 3

6 3

G

26

6

26

INLET CENTRE STATION

6

12 26 4

3

Chris McIntyre Personal Real Estate Corporation LEGEND dir: 604 630 3392 cel: 604 889 0699

Multi-Family Residential

Mixed Use - Inlet Centre [email protected]

3

Mixed Use - Moody Centre Mixed Employment Centre Station 475 West Georgia Street, Suite 800,Moody Vancouver, BC V6B 4M9 Transit-Oriented Development

|

Proposed Number of Storeys

Stre

Evergreen Line - Tunnel

Culv

Evergreen Line - Elevated

Ditch

Evergreen Line - Ground Level

Othe

400m Radius from Station (≈ 5 min Walk)

604 684 7117

|

lee–associates.com

Municipal Boundary Oceanfront District Existing to Connections Disclaimer: Although the information contained within is from sources believed to be reliable, no warranty or representation is made as to its accuracy being subject errors, omissions, conditions, prior lease, nlet Centre Station Transit Oriented Development withdrawal or other changes without notice and same should not be relied upon without independent verification.Public © Leeand & Associates Ltd. All Rights Reserved. 03/09/17. Institutional Commercial Real Estate (BC) Future Connections

Moody Centre Station Transit Oriented Development