Golden Brook School Windham, NH October 20, 2015

Option C vs Option D Phasing and Construction Cost Comparison

Prepared By:

v2

Golden Brook School Windham, NH October 20, 2015 Estimate of Probable Construction Cost OPTION Low

C IS D S S

U N

IO

CM Fee

Y

Bonds and General Liability Insurance

G

Builder's Risk Insurance

LO

CM Contingency

O D

Winter Conditions

O

Temp Work and Protection

H

General Conditions

T E

Sitework Costs

M

Base Building Cost

High

TOTAL CONSTRUCTION COST

Option C Phasing Plan #1 2 Phase Scheme (24 Months)

OPTION C - PHASE 1 24 Months Total Duration June 2016 to Aug 2016 - Install Temporary Classrooms Aug 2016 to June 2017 - Construct Addition Summer Vacation 2017 - Move into new addition

Kindergarten Main Entrance

Phase 1

GBS Main Entrance

10 Temporary Classrooms

OPTION C - PHASE 2 24 Months Total Duration June 2017 to Aug 2017 - Building demo and sitework Aug 2017 to June 2018 - Construct Addition Summer Vacation 2018 - Move into new addition

Kindergarten Main Entrance

Phase 2

GBS Main Entrance

Option C Phasing Plan #2 4 Phase Scheme (30 Months)

OPTION C - PHASE 1 30 Months Total Duration Aug 2016 to Feb 2017 - Construct Addition

Kindergarten Main Entrance

GBS Main Entrance

Phase 1

OPTION C - PHASE 2 30 Months Total Duration Feb 2017 to Dec 2017 - Construct Addition

Kindergarten Main Entrance

Phase 2

GBS Main Entrance

OPTION C - PHASE 3 30 Months Total Duration Jan 2017 to July 2017 - Complete Final Addition

Kindergarten Main Entrance

Phase 3

GBS Main Entrance

OPTION C - PHASE 4 30 Months Total Duration June 2017 to Jan 2018 - Demo & Rebuild Core

Kindergarten Main Entrance

GBS Main Entrance Phase 4

Option D Phasing Plan 3 Phase Scheme (24 Months)

OPTION D - PHASE 1 24 Months Total Duration July 2016 to Aug 2016 - Relocate underground utilities Aug 2016 to February 2017 - Construct Addition February 2017 Vacation - Move 'Quads' into new addition Phase 1 (12 classrooms)

Kindergarten Main Entrance

GBS Main Entrance

OPTION D - PHASE 2 24 Months Total Duration Feb 2017 to Aug 2017 - Renovate 'Quads' & build addition Summer 2017 - Move 'Pods' into renovated 'Quads'

Kindergarten Main Entrance

Phase 2 (12 classrooms)

GBS Main Entrance

OPTION D - PHASE 3 24 Months Total Duration June 2017 to July 2018 - Complete final addition Summer 2018 - Reorganize grades district-wide

Kindergarten Main Entrance

Phase 3

GBS Main Entrance

Construction Cost Estimates

Golden Brook School Windham, NH October 20, 2015

Estimate of Probable Construction Cost OPTION C Low

High

Base Building Cost

$ 19,200,000

$ 20,200,000

Sitework Costs

$

2,400,000

$

2,650,000

General Conditions

$

800,000

$

1,000,000

Temp Work and Protection

$

150,000

$

400,000

Winter Conditions

$

200,000

$

450,000

CM Contingency

$

800,000

$

1,000,000

Builder's Risk Insurance

$

50,000

$

80,000

Bonds and General Liability Insurance

$

307,000

$

335,000

CM Fee

$

705,000

$

875,000

TOTAL CONSTRUCTION COST

$ 24,612,000

$ 26,990,000

Note: A structural review of the existing building is needed to evaluate the feasibility of constructing a second floor on the existing foundations and walls. The results of the structural analysis may impact the costs shown above. The 2-phase approach is reflected in the low range for general conditions, temp work and protection, and winter conditions.

Golden Brook School Windham, NH 10/20/2015

Estimate of Probable Construction Cost OPTION D Low

High

Base Building Cost

$ 19,000,000

$ 20,000,000

Sitework Costs

$

2,400,000

$

2,650,000

General Conditions

$

700,000

$

800,000

Temp Work and Protection

$

100,000

$

200,000

Winter Conditions

$

250,000

$

350,000

CM Contingency

$

800,000

$

1,000,000

Builder's Risk Insurance

$

50,000

$

80,000

Bonds and General Liability Insurance

$

303,000

$

326,000

CM Fee

$

696,000

$

851,000

TOTAL CONSTRUCTION COST

$ 24,299,000

$ 26,257,000

Note: A structural review of the existing building is needed. We have assumed that existing foundations, walls and roof structure in the areas to be renovated will remain as is.This option includes construction in an area that appears to have significant underground utilities. Further investigation and design direction is needed to accurately determine cost impacts.

Golden Brook School Windham, NH October 20, 2015

Potential Value Engineering / Cost Savings Ideas 1.

Cut added space (12,000sf)

2.

Substitute ceramic tile at lobby

3.

Substitute metal paenl at lobby

4.

Substitute ground face block at lobby

5.

Remove roof overhangs

6.

Block bearing instead of steel frame

7.

Substitue Won Fire Doors

8.

Remove sunshades/light shelves

9.

Substitute for ceiling tile

10. Reuse existing foundations, insulation, walls, roof 11. No additional roof support 12. Reuse gym equipment

Golden Brook School Windham, NH October 20, 2015

Estimate of Probable Construction Cost ALTERNATES Alt 1: GBS Kindergarten Addition

$

922,400

Alt 2: GBS Kitchen

$

560,600

Alt 3: GBS Enlarged Gymnasium

$

755,000

ALTERNATE TOTAL COST

$

2,238,000

Note: Alternate costs may vary depending on the selected GBS design option.

Windham Middle School Windham, NH October 20, 2015

Estimate of Probable Construction Cost Middle School Low High Middle School Addition

$

950,000

$ 1,006,300

Middle School Renovations

$

1,550,000

$ 1,630,800

Pump House & Allowance

$

75,000

$

75,000

Sitework Costs

$

100,000

$

140,000

General Conditions

$

240,000

$

348,000

Temp Work and Protection

$

20,000

$

60,000

Winter Conditions

$

-

$

10,000

CM Contingency

$

100,000

$

170,000

Builder's Risk Insurance

$

4,000

$

15,000

Bonds and General Liability Insurance

$

42,000

$

48,000

CM Fee

$

92,000

$

139,900

TOTAL CONSTRUCTION COST

$

3,173,000

$ 3,643,000