COVER FOLD GUIDE
GRAIN COVER SYSTEMS
EXAMPLES OF STANDARD COVER CONFIGURATIONS
*CUSTOM OPTIONS ALSO AVAILABLE
ACCORDIAN FOLD The accoridan fold is our standard configuration designed for ease of simple pull-out deployment.
off the bottom of the roll
Black side down
Unfold
Unfold Unroll from side B
Unroll from side A
Black side down
off the bottom of the roll
Unroll from side B
off the bottom of the roll
Bunker starting end
Piece 1
White side up
Piece 2
Bunker finishing end
Bunker
Unfold
White side up
Piece 3
White side up
Black side down
FLIP FOLD The flip fold is conveniently folded to ensure the correct leading edge position for single side installs.
Black side up
White side
White side
Bunker
Unfold
Piece 2
Unfold Unroll from side B
Unroll from side B
White side
off the bottom of the roll
Unroll from side B
off the bottom of the roll
Bunker starting end
off the bottom of the roll
Unfold
Piece 1
Black side up
Piece 3
Bunker finishing end
Black side up
GRAIN COVER SYSTEMS
COVER FOLD GUIDE
EXAMPLES OF STANDARD COVER CONFIGURATIONS
*CUSTOM OPTIONS ALSO AVAILABLE
50 / 50 FOLD The 50/50 fold is used to provide easy deployment of single piece covers. Bunker wall
Unroll accross center off the bottom of the roll
Pull remaining this direction
Bunker wall
Pull top this direction first
Pull remaining this direction
Unroll accross center off the bottom of the roll
Pull this direction
Top color may be black or white depending on size of cover.
Top panel 1st half
Center panel
Pull this direction
Top color may be black or white depending on size of cover. Top panel 2nd half
Pull top this direction first
Centerline of grain pile
INSTALLATION GUIDES, DRAWINGS, AND DEPLOYMENT INSTRUCTIONS CAN BE FOUND ONLINE AT: http://ravenefd.com/installation PRIOR TO INSTALLATION: Check weather conditions prior to starting your installation, do not try to deploy covers in windy conditions. During and after deployment, some type of ballast must be used to prevent wind from taking control of the cover material, aeration fans may also be utilized. Typically, sandbags are used for ground piles without aeration and should be placed as required to prevent damage to the cover during installation. Depending on the current wind conditions, the crew should be able to take advantage of a slight breeze by pumping a layer of air under the cover to help float the material while deploying. If at any time the air underneath becomes too excessive, the deployment crew should pull the cover closer to ground level to help push out some of the air. If an unexpected wind gust comes up during deployment, the crew should hold the leading edge of the cover material down to the grain pile to avoid wind lift. If uncontrolled wind lift occurs, immediately stay clear of the cover to avoid injury.
Note: To the best of our knowledge, these are typical installation procedures and are intended as guidelines only. RAVEN INDUSTRIES MAKES NO WARRANTIES AS TO THE FITNESS FOR A SPECIFIC USE OR MERCHANTABILITY OF PRODUCTS OR GUIDELINES REFERRED TO, no guarantee of satisfactory results from reliance upon contained information or recommendations and we disclaim all liability for resulting loss or damage. Limited Warranty available at www.RavenEFD.com
RAVEN ENGINEERED FILMS
P.O. Box 5107 Sioux Falls, SD 57117-5107 Ph: +1 (605) 335-0174 • TF: +1 (800) 635-3456 © 2017 RAVEN INDUSTRIES INC. All rights reserved.
[email protected] www.ravenefd.com 041117
EFD 1403