Highway Approach Improvements Appendix

Report 0 Downloads 83 Views
Transportation

February 8, 2012

Highway Approach Improvements Appendix San Francisco Bay Crossings Study Update Prepared for the Bay Area Toll Authority

Bay Area Toll Authority

AECOM

San Francisco Bay Crossings Study Update

Appendix A Highway Approach Improvements Drawings

Bay Area Toll Authority

AECOM

San Francisco Bay Crossings Study Update

Appendix B Traffic Operations Analysis

Bay Area Toll Authority

Approach Improvements Report Alternative 1 ‐ Mandela Parkway Bus Ramp

San Francisco Bay Crossings Study Update

1 Mandela Parkway Bus Ramp

Bus Route AC Transit ‐ F (40 WB trips) AC Transit ‐ C (5 WB trips) Daily  Annual (Existing Conditions) Annual (Future Conditions) Description Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

February 8, 2012

Daily Person‐ Trips 357 47 404 121,200 156,703

Existing 1020 1020

Travel Time (sec.) With Imp. Change 420 600 420 600

Person Hours  of Delay 59.50 7.83 67 20,200 26,100 Total $11,130,000 $46,200,000 0.24

Approach Improvements Report Alternative 2 ‐ MacArthur Boulevard Bus Ramp

San Francisco Bay Crossings Study Update

2 MacArthur Boulevard Bus Ramp

Bus Route AC Transit ‐ F (40 WB trips) AC Transit ‐ C (5 WB trips) Daily  Annual (Existing Conditions) Annual (Future Conditions) Description Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

February 8, 2012

Daily Person‐ Trips 357 47 404 121,200 156,703

Existing 1020 1020

Travel Time (sec.) With Imp. Change 300 720 300 720

Person Hours  of Delay 71.40 9.40 81 24,200 31,300 Total $13,340,000 $11,100,000 1.20

Approach Improvements Report Alternative 3 ‐ Maritime Street HOV Lane Addition

San Francisco Bay Crossings Study Update

3 Maritime Street HOV Lane Addition Length of Imp. (miles) Scenario Existing HOV Lane  Extension

Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions)

February 8, 2012

0.48 Type General HOV General HOV

Lanes 2 0 2 1

TT Savings General Existing 0 Future  0 Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

Person Trips With Improvement Existing General HOV General HOV 1,692 ‐ 1,637 55 2,591 ‐ 2,488 103 2,851 ‐ 2,721 130 3,008 ‐ 2,971 36 3,209 ‐ 3,165 44 2,862 ‐ 2,818 44 16,213 ‐ 15,800 412

HOV 253 296

Existing General HOV 37 ‐ 37 ‐ 37 ‐ 28 ‐ 28 ‐ 28 ‐

Bus ‐ ‐

Total 300 300 $144,000 $19,600,000 0.01

Travel Time (seconds) With Improvement General HOV 37 27 37 27 37 27 28 27 28 27 28 27

Change General HOV 0 10 0 10 0 10 0 2 0 2 0 2

Person Hours of  Delay General HOV 0.00 0.15 0.00 0.28 0.00 0.36 0.00 0.02 0.00 0.02 0.00 0.02 0.00 0.84 0 253

Approach Improvements Report Alternative 4 ‐ SR 24 to I‐80 HOV Bypass

San Francisco Bay Crossings Study Update

4 SR 24 to I‐80 HOV Bypass Length of Imp. (miles)

1.29

Scenario

Type

Existing SR 24 to I‐580 Weave

General HOV General HOV

HOV Lane Flyover 

Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions)

February 8, 2012

Lanes 2 0 2 1

% Traffic AM PM 100% 100% ‐ ‐ 87% 87% 13% 13%

Person Trips With Improvement Existing General Flyover General Flyover 4,127 ‐ 3,564 563 6,606 ‐ 5,839 768 7,794 ‐ 7,047 748 6,613 ‐ 6,171 442 6,404 ‐ 5,964 439 6,306 ‐ 5,903 403 37,849 ‐ 34,487 3,362

TT Savings General Existing 0 Future  0 Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

Existing General Flyover 113 ‐ 142 ‐ 181 ‐ 114 ‐ 121 ‐ 117 ‐

HOV 18,219 21,288

Travel Time (seconds) With Improvement General Flyover 113 71 142 71 181 71 114 71 121 71 117 71

Bus ‐ ‐

Total 18,200 21,300 $9,498,000 $439,400,000 0.02

Change General Flyover 0 41 0 70 0 110 0 43 0 49 0 45

Person Hours  of Delay General Flyover 0.00 6.46 0.00 15.02 0.00 22.87 0.00 5.28 0.00 6.01 0.00 5.09 0.00 60.73 0 18,219

Approach Improvements Report Alternative 5 ‐ Powell Street / I‐80 Ramps ‐ HOV Improvement

San Francisco Bay Crossings Study Update 

5 Powell Street / I‐80 Ramps Intersection ‐ HOV Improvement  Length of Imp. (miles) Scenario Existing HOV Improvement (WB) Loop Ramp (EB) Ramp

Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions) Bus Route AC Transit ‐ F (40 WB trips) AC Transit ‐ C (5 WB trips) AC Transit ‐ J (6 WB trips) Daily  Annual (Existing Conditions) Annual (Future Conditions)

February 8, 2012

0.50 Type General HOV General HOV Lanes Lanes

Lanes 3 0 3 1 1 1

% Traffic AM PM 100% 100% ‐ ‐ 83% 88% 17% 12% ‐ ‐ ‐ ‐

Person Trips With Improvement Existing General HOV General HOV 4,800 70 4,712 158 3,821 223 3,614 430 5,553 468 5,178 843 5,686 623 5,251 1,058 5 581 5,581 1 098 1,098 4 924 4,924 1 755 1,755 4,013 1,307 3,196 2,124 29,454 3,787 26,874 6,367

Daily  Person‐ 357 47 119 523 156,900 202,861

Existing 120 120 120

Travel Time (sec.) With Imp. Change 60 60 60 60 60 60

TT Savings General Existing 0 Future  0 Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

Existing General HOV 48 28 48 28 48 28 81 28 81 28 81 28

Person  Hours  5.95 0.78 1.98 9 2,615 3,381

HOV 9,639 11,263

Travel Time (seconds) With Improvement General HOV 48 28 48 28 48 28 81 28 81 28 81 28

Bus 2,615 3,381

Total 12,300 14,600 $6,468,000 $1,248,000 5.18

Change General New HOVs 0 20 0 20 0 20 0 53 0 53 0 53

Person Hours  of Delay General HOV 0.00 0.50 0.00 1.18 0.00 2.13 0.00 6.45 0 00 0.00 9 75 9.75 0.00 12.12 0.00 32.13 0 9,639

Approach Improvements Report Alternative 6 ‐ I‐880 HOV Lane Merge ‐ Lane Removal

San Francisco Bay Crossings Study Update

6 I‐880 HOV Lane Merge ‐ Lane Removal Length of Imp. (miles) Scenario Existing I‐80 to Powell Existing  I‐880 to Powell I‐880 w/ HOV lane removal Existing Conditions at Merge HOV Lane removal

Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions)

February 8, 2012

0.50 Type General HOV General HOV General HOV General HOV General HOV

Lanes 2 1 2 1 3 0 2 1 2 1

TT Savings General Existing 0 Future  0 Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

Person Trips With Improvement Existing General HOV General HOV 2,385 2,481 3,453 1,413 3,007 3,332 4,354 1,985 2,991 3,660 4,331 2,320 2,775 3,619 4,087 2,140 2,628 3,441 3,870 2,041 2,398 3,307 3,531 2,036 16,184 19,839 23,626 11,934

HOV ‐13,790 ‐16,113

Existing General HOV 31 28 32 28 32 29 153 150 200 130 57 59

Bus ‐ ‐

Total ‐ ‐ ‐ $114,000 ‐

Travel Time (seconds) With Improvement Change General HOV General HOV 31 31 0 ‐4 32 32 0 ‐4 32 32 0 ‐2 153 153 0 ‐3 200 200 0 ‐70 57 57 0 1

Person Hours  of Delay General HOV 0.00 ‐1.48 0.00 ‐1.98 0.00 ‐1.46 0.00 ‐1.89 0.00 ‐39.84 0.00 0.69 0.00 ‐45.97 0 ‐13,790

Approach Improvements Report Alternative 7 ‐ I‐880 HOV Lane Merge ‐ Lane Extension

San Francisco Bay Crossings Study Update

7 I‐880 HOV Lane Merge ‐ Lane Extension Length of Imp. (miles)

0.50

Scenario

Type

Existing I‐80 to Powell Existing  I‐880 to Powell Existing merge HOV lane extension

Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions)

February 8, 2012

General HOV General HOV General HOV General HOV

Lanes 2 1 2 1 2 1 2 2

TT Savings General Existing 0 Future  0 Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

Person Trips With Improvement Existing General HOV General HOV 2,385 2,481 2,385 2,481 3,007 3,332 3,007 3,332 2,991 3,660 2,991 3,660 2,775 3,451 2,775 3,451 2,628 3,283 2,628 3,283 2,398 3,169 2,398 3,169 16,184 19,375 16,184 19,375

HOV 0 0

Existing General HOV 31 28 32 28 32 29 153 150 200 130 57 59

Bus ‐ ‐

Total ‐ ‐ ‐ $117,000 ‐

Travel Time (seconds) With Improvement Change General HOV General HOV 31 28 0 0 32 28 0 0 32 29 0 0 153 150 0 0 200 130 0 0 57 59 0 0

Person Hours  of Delay General HOV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0

Approach Improvements Report Alternative 8 ‐ Fourth Street On‐Ramp / Ninth Street Off‐Ramp Braid

San Francisco Bay Crossings Study Update

8 Fourth Street On‐Ramp / Ninth Street Off‐Ramp Braid Length of Imp. (miles) Scenario Existing W/Braid Flyover

Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions)

February 8, 2012

0.67 Type General HOV General HOV General

Lanes 2.5 0 3 0 1

TT Savings  General Existing 0 Future  0 Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

Person Trips With Improvement Existing General Flyover General Flyover 8,416 ‐ 7,041 1,375 6,390 ‐ 5,113 1,277 6,012 ‐ 4,791 1,221 6,023 ‐ 5,148 875 6,023 ‐ 4,975 1,047 4,348 ‐ 3,590 758 6,553 37,211 ‐ 30,658

Flyover 29,562 38,063

Existing General Flyover 54 ‐ 54 ‐ 54 ‐ 144 ‐ 144 ‐ 144 ‐

Bus ‐ ‐

Total 29,600 38,100 $16,550,000 $50,000,000 0.33

Travel Time (seconds) With Improvement General Flyover 54 37 54 37 54 37 144 37 144 37 144 37

Change General Flyover 0 17 0 17 0 17 0 107 0 107 0 107

Person Hours  of Delay General Flyover 0.00 6.62 0.00 6.15 0.00 5.88 0.00 26.07 0.00 31.22 0.00 22.59 0.00 98.54 0 29,562

Approach Improvements Report Alternative 9 ‐ Bay Bridge to US 101 Lane Addition

San Francisco Bay Crossings Study Update

9 Bay Bridge to US 101 Lane Addition Length of Imp. (miles) Length to Fifth St. Off Scenario Existing Lane  Addition

Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions) Bus Route SFMTA ‐ 9X (SB) SFMTA ‐ 9AX (SB) SFMTA ‐ 9BX (SB) SFMTA ‐ 14X (SB) Daily  Annual (Existing Conditions) Annual (Future Conditions)

February 8, 2012

1.51 0.23 Type General HOV General HOV

Lanes 2.5 0 3.5 0

TT Savings General Existing 19,954 Future  25,693 Travel Time Benefits Cost of Improvement Benefit / Cost Ratio

Person Trips to Ninth St Off to Fifth St Off General HOV General HOV 806 ‐ 1,375 ‐ 1,106 ‐ 1,277 ‐ 1,085 ‐ 1,221 ‐ 999 ‐ 875 ‐ 1,331 ‐ 1,047 ‐ 1,588 ‐ 758 ‐ 6,915 ‐ 6,553 ‐

Daily  Person‐ 3,157 1,043 751 706 5,657 1,697,100 2,194,230

Existing 112 112 112 112

Travel Time (sec.) With Imp. Change 99 13 99 13 99 13 99 13

HOV 0 0

Existing To Fifth To Ninth 123 19 123 19 123 19 326 49 326 49 326 49

Person  Hours  11.66 3.85 2.77 2.61 20.90 6,269 8,106

Bus 6,269 8,106

Total 26,200 33,800 $20,730,000 $134,900,000 0.15

Travel Time (seconds) With Improvement To Fifth To Ninth 116 17 116 17 116 17 279 38 279 38 279 38

Change To Fifth To Ninth 7 2 7 2 7 2 46 11 46 11 46 11

Person Hours  of Delay General HOV 2.32 ‐ 2.87 ‐ 2.80 ‐ 15.52 ‐ 20.31 ‐ 22.69 ‐ 66.51 0.00 19,954 0

Approach Improvements Report Alternative 10 ‐ US 101 to Cesar Chavez Street HOV Lane Addition

San Francisco Bay Crossings Study Update

10 US 101 to Cesar Chavez Street HOV Lane Addition Length of Imp. (miles) Scenario Existing Lane Addition

Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions)

Bus Route SFMTA ‐ 9X (SB) SFMTA ‐ 9AX (SB) SFMTA ‐ 9BX (SB) SFMTA ‐ 14X (SB) Daily  Annual (Existing Conditions) Annual (Future Conditions)

February 8, 2012

1.25 Type @ US 101 b/w US101 an b/w US101 an HOV

Lanes 3 4 3.50 1

TT Savings General Existing 0 Future  0 Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

Person Trips With Improvement Existing General HOV General HOV 954 ‐ 954 1,153 1,300 ‐ 1,300 1,494 1,330 ‐ 1,330 1,437 1,373 ‐ 1,373 665 1,073 ‐ 1,073 607 1,035 ‐ 1,035 591 7 064 7 064 5 947 7,064 ‐ 7,064 5,947

Daily  Person‐ Trips 3,157 1,043 751 706 5,657 1,697,100 2,194,230

Travel Time Existing 93 93 93 93

With Imp. 69 69 69 69

Change 24 24 24 24

HOV 12,362 14,444

Existing General HOV 84 ‐ 89 ‐ 102 ‐ 87 ‐ 112 ‐ 100 ‐

Person  Hours  of Delay 20.68 6.83 4.92 4.62 37.05 11,115 14,371

Bus 11,115 14,371

Total 23,500 28,800 $12,580,000 $70,200,000 0.18

Travel Time (seconds) With Improvement General HOV 84 69 89 69 102 69 87 69 112 69 100 69

Change General HOV 0 15 0 20 0 32 0 17 0 43 0 30

Person Hours  of Delay General HOV 0.00 4.69 0.00 8.14 0.00 12.92 0.00 3.21 0.00 7.24 0.00 5.00 41 21 0 41.21 0 12,362

Approach Improvements Report Alternative 11 ‐ Cesar Chavez Street to US 101 HOV Lane Addition

San Francisco Bay Crossings Study Update

11 Cesar Chavez Street to US 101 HOV Lane Addition Length of Imp. (miles) Scenario Existing Lane Addition

Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions)

February 8, 2012

0.84 Type Mainline Ramp General HOV

Lanes 4 1 3.5 1

TT Savings General Existing 0 Future  0 Travel Time Benefits Cost of Improvement Benefit / Cost Ratio

Person Trips With Improvement Existing General HOV General HOV 6,645 ‐ 5,453 1,192 8,337 ‐ 6,841 1,496 8,465 ‐ 6,946 1,519 3,629 ‐ 2,978 651 3,961 ‐ 3,250 711 4,736 ‐ 3,886 850 35,773 ‐ 29,355 6,418

HOV 14,421 16,850

Existing General HOV 51 ‐ 65 ‐ 74 ‐ 76 ‐ 61 ‐ 70 ‐

Bus ‐ ‐

Total 14,400 16,900 $7,530,000 $35,900,000 0.21

Travel Time (seconds) With Improvement General HOV 51 47 65 47 74 47 76 47 61 47 70 47

Change General HOV 0 4 0 19 0 27 0 29 0 14 0 24

Person Hours  of Delay General HOV 0 0.43 0 4.47 0 7.40 0 17.70 0 9.58 0 8.49 0 48.07 0 14,421

Approach Improvements Report Alternative 12 ‐ Fifth Street On‐Ramp HOV Lane Addition

San Francisco Bay Crossings Study Update

12 Fifth Street On‐Ramp HOV Lane Addition Length of Imp. (miles) Scenario Existing On‐Ramp HOV Queue Jump

Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions)

February 8, 2012

0.10 Type General HOV General  HOV

Lanes 1 0 1 1

TT Savings General Existing 0 Future  0 Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

Person Trips With Improvement Existing General HOV General HOV 119 ‐ 94 25 276 ‐ 216 60 557 ‐ 435 123 1,069 ‐ 997 73 942 ‐ 877 65 911 ‐ 848 62 3,873 ‐ 3,465 408

HOV 429 501

Existing General HOV 9 ‐ 9 ‐ 9 ‐ 36 ‐ 36 ‐ 36 ‐

Bus ‐ ‐

Total 400 500 $220,000 $4,300,000 0.05

Travel Time (seconds) With Improvement General HOV 9 9 9 9 9 9 36 10 36 10 36 10

Change General HOV 0 0 0 0 0 0 0 26 0 26 0 26

Person Hours  of Delay General HOV 0 0 0 0 0 0 0 1 0 0 0 0 0 1.43 0 429

Approach Improvements Report Alternative 13 ‐ US 101 (I‐280 to Bay Bridge) HOV Lane Addition / Bypass

San Francisco Bay Crossings Study Update

13 US 101 (I‐280 to Bay Bridge) HOV Lane Addition / Bypass Length of Imp. (miles) Scenario Existing w/ HOV lane Addition

Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions)

Bus Route SFMTA ‐ 9X (NB) SFMTA ‐ 9AX (NB) SFMTA ‐ 9BX (NB) Daily  Annual (Existing Conditions) Annual (Future Conditions)

February 8, 2012

2.59 Type General HOV General HOV

Lanes 4 0 4 1

Person Trips With Improvement Existing General HOV General HOV 5,457 ‐ 4,478 979 7,665 ‐ 6,291 1,375 8,159 ‐ 6,695 1,464 7,004 ‐ 5,748 1,256 7,541 ‐ 6,188 1,353 7,529 ‐ 6,178 1,351 43,356 ‐ 35,578 7,778

Daily  Person‐ Trips 3,133 1,205 990 5,328 1,598,400 2,066,618

Travel Time Existing 210 210 210

TT Savings General Existing 0 Future  0 Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

% Traffic AM PM 100% 100% 0% 0% 89% 89% 11% 11%

With Imp. 143 143 143

Change 67 67 67

Existing General HOV 149 ‐ 188 ‐ 209 ‐ 267 ‐ 245 ‐ 227 ‐

Person  Hours  of Delay 58.24 22.40 18.40 99.04 29,713 38,417

HOV 47,344 55,319

Bus 29,713 38,417

Total 77,100 93,700 $41,070,000 $329,500,000 0.12

Travel Time (seconds) With Improvement Change General HOV General HOV 149 143 0 6 188 143 0 45 209 143 0 66 267 143 0 123 245 143 0 101 227 143 0 84

Person Hours  of Delay General HOV 0 1.51 0 17.13 0 26.68 0 42.94 0 38.15 0 31.40 0 157.81 0 47,344

Approach Improvements Report Alternative 14 ‐ I‐280 (US 101 to Bay Bridge) HOV Lane Addition / Bypass

San Francisco Bay Crossings Study Update

14 I‐280 (US 101 to Bay Bridge) HOV Lane Addition / Bypass Length of Imp. (miles) Scenario Existing w/ HOV Lane Conversion

Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions)

Bus Route SFMTA ‐ 14X (NB) Daily  Annual (Existing Conditions) Annual (Future Conditions)

February 8, 2012

2.59 Type General HOV General HOV Ramp

Lanes 4 0 4 1

TT Savings General Existing 0 Future  0 Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

% Traffic AM PM 100% 100% 0% 0% 90% 86% 10% 14%

Person Trips With Improvement Existing General HOV General HOV 4,196 ‐ 3,532 1,633 6,986 ‐ 5,882 2,177 6,075 ‐ 5,115 2,343 4,176 ‐ 3,516 1,677 3,836 ‐ 3,230 1,668 3,318 ‐ 2,794 1,799 28,586 ‐ 24,068 11,297

Existing General HOV 147 ‐ 180 ‐ 200 ‐ 143 ‐ 143 ‐ 143 ‐

Daily  Person‐ Trips 951 951 285,300 368,873

Person  Hours  of Delay 2.98 2.98 893 1,154

Travel Time Existing 155

With Imp. 143

Change 11

HOV 45,951 53,692

Bus 893 1,154

Total 46,800 54,800 $24,430,000 $171,300,000 0.14

Travel Time (seconds) Change With Improvement General HOV General HOV 147 143 0 3 180 143 0 36 200 143 0 56 143 143 0 0 143 143 0 0 143 143 0 0

Person Hours  of Delay General HOV 0 0 0 6 0 12 0 0 0 0 0 0 0 18.28 0 45,951

Approach Improvements Report Alternative 15 ‐ San Mateo Bridge Open Road Tolling

San Francisco Bay Crossings Study Update

15 San Mateo Bridge Open Road Tolling Length of Imp. (miles) Scenario

Existing

Tollbooths Required

Open Road Tolling

0.10 Type Cash FasTrak HOV Total Cash FasTrak HOV Total ORT Cash FasTrak HOV Total

February 8, 2012

Capacity

5 2 2 9 4 3 2 9 3 6 0 1 10

1,900 2,200 2,200 6,300 1,520 3,300 2,200 7,020 5,400 2,280 0 1,100 8,780

% Traffic AM PM 27% 42% 73% 58% 10% 5% 27% 73% 10%

42% 58% 5%

73% 27% ‐ 10%

58% 42% ‐ 5%

Cash 36 36 36 36 36 36

Existing FasTrak 18 18 18 18 18 18

Person Trips

Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions)

Lanes

Cash 1,020 1,396 1,345 813 790 672 8,585

FasTrak 2,259 3,091 2,979 1,944 1,890 1,607 19,544

HOV 765 1,047 1,009 277 269 229 5,216

TT Savings General Existing 0 Future  0 Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

HOV 18 18 18 18 18 18

Cash 36 36 36 36 36 36

ORT 14,658 18,060

Travel Time (seconds) With ORT FasTrak HOV 9 9 9 9 9 9 9 9 9 9 9 9

HOV 3,912 5,553

Cash 0 0 0 0 0 0

Total 18,600 23,600 $10,150,000 $4,200,000 2.42

Change FasTrak 9 9 9 9 9 9

HOV 9 9 9 9 9 9

Cash 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

Person Hours  of Delay FasTrak 5.65 7.73 7.45 4.86 4.72 4.02 48.86 14,658

HOV 1.91 2.62 2.52 0.69 0.67 0.57 13.04 3,912

Approach Improvements Report Alternative 16 ‐ Dumbarton Bridge Open Road Tolling

San Francisco Bay Crossings Study Update

16 Dumbarton Bridge Open Road Tolling Length of Imp. (miles) Scenario

Existing

Tollbooths Required

Open Road Tolling

0.10 Type Cash FasTrak HOV Total Cash FasTrak HOV Total ORT Cash FasTrak HOV Total

February 8, 2012

Capacity

4 2 1 7 4 3 1 8 2 5 0 1 8

1,520 2,200 1,100 4,820 1,520 3,300 1,100 5,920 3,600 1,900 0 1,100 6,600

% Traffic AM PM 28% 34% 72% 66% 13% 4% 28% 72% 13%

34% 66% 4%

72% 28% ‐ 13%

66% 34% ‐ 4%

Cash 36 36 36 36 36 36

Existing FasTrak 18 18 18 18 18 18

Person Trips

Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions)

Lanes

Cash 801 1,221 1,218 356 391 376 6,084

FasTrak 1,779 2,714 2,706 792 870 835 13,521

HOV 771 1,176 1,173 343 377 362 5,859

TT Savings General Existing 0 Future  0 Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

HOV 18 18 18 18 18 18

ORT 10,141 12,153

Travel Time (seconds) With Improvement Cash FasTrak HOV 36 9 9 36 9 9 36 9 9 36 9 9 36 9 9 36 9 9

HOV/Bus 4,394 7,861

Cash 0 0 0 0 0 0

Total 14,500 20,000 $8,530,000 $3,800,000 2.24

Change FasTrak 9 9 9 9 9 9

HOV 9 9 9 9 9 9

Cash 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

Person Hours  of Delay FasTrak 4.45 6.78 6.77 1.98 2.17 2.09 33.80 10,141

HOV 1.93 2.94 2.93 0.86 0.94 0.90 14.65 4,394

Approach Improvements Report Alternative 17 ‐ Western SR 84 / Northern I‐880 HOV Connectors

San Francisco Bay Crossings Study Update

17 Western SR 84 / Northern I‐880 HOV Connectors Length of Imp. (miles) Scenario Existing With HOV Connector

0.85 Type General HOV General HOV

Lanes 1 0 1 1

% Traffic AM PM 100% 100% 0% 0% 87% 96% 13% 4%

TT Savings General Existing 0 Future  0 Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

HOV 2,347 4,199

Bus ‐ ‐

Total 2,300 4,200 $1,560,000 $104,000,000 0.02

I‐880 SB / SR 84 WB HOV Connector Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions)

Person Trips With Improvement Existing General HOV General HOV 916 ‐ 706 210 1,623 ‐ 1,249 374 2,029 ‐ 1,563 466 980 ‐ 916 64 1,075 ‐ 1,005 70 1,136 ‐ 1,062 74 7,759 ‐ 6,501 1,258

Existing General HOV 68 ‐ 68 ‐ 68 ‐ 77 ‐ 77 ‐ 77 ‐

Travel Time (seconds) With Improvement General HOV 68 47 68 47 68 47 77 47 77 47 77 47

Change General HOV 0 21 0 21 0 21 0 29 0 29 0 29

Person Trips With Improvement Existing General HOV General HOV 334 ‐ 258 76 684 ‐ 526 158 831 ‐ 639 192 1,609 ‐ 1,503 106 1,576 ‐ 1,474 102 1,479 ‐ 1,383 96 6,512 ‐ 5,782 730

Existing General HOV 47 ‐ 47 ‐ 47 ‐ 48 ‐ 47 ‐ 47 ‐

Travel Time (seconds) With Improvement General HOV 47 47 47 47 47 47 48 47 47 47 47 47

Change General HOV 0 0 0 0 0 0 0 1 0 0 0 0

Person Hours  of Delay General HOV 0 1 0 2 0 3 0 1 0 1 0 1 0 7.80 0 2,341

SR 84 EB / I‐880 NB HOV Connector Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions)

February 8, 2012

Person Hours  of Delay General HOV 0 0 0 0 0 0 0 0 0 0 0 0 0 0.02 0 6

Approach Improvements Report Alternative 18 ‐ SR 84 FasTrak Lane Extension

San Francisco Bay Crossings Study Update

18 SR 84 FasTrak Lane Extension Length of Imp. (miles) Scenario Existing Conditions at  Paseo Padre

Lane Addition

1.42 Type General FasTrak HOV Total General FasTrak HOV Total

Hour 6:00 7:00 8:00 16:00 17:00 18:00

February 8, 2012

Capacity

1 1 1 3 1 2 1 4

1,800 1,800 1,800 5,400 1,800 3,600 1,800 7,200

% Traffic AM PM 27% 42% 73% 58% 13% 4%

Cash 712 999 989 705 759 707 7,073

FasTrak 1,582 2,221 2,198 912 981 914 13,049

HOV 685 962 953 124 134 125 4,551

TT Savings General Existing 0 Future  0 Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

27% 73% 13%

42% 58% 4%

Cash 114 114 114 79 79 79

Existing FasTrak 114 114 114 79 79 79

HOV 114 114 114 79 79 79

Cash ‐ ‐ ‐ ‐ ‐ ‐

Existing FasTrak ‐ 421 398 ‐ ‐ ‐

Person Trips

Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions)

Lanes

Existing Vehicle Volume at Paseo Padre ‐  Transaction by Payment Type at Toll Plaza Cash FasTrak HOV Total 712 1,582 343 2,636 999 2,221 481 3,701 989 2,198 476 3,664 641 829 56 1,527 690 892 61 1,642 643 831 57 1,530

Cash 114 114 114 79 79 79

FasTrak 2,386 4,268

Travel Time (seconds) With Improvement FasTrak HOV 79 114 79 114 79 114 79 79 79 79 79 79

HOV/Bus ‐ ‐

Cash 0 0 0 0 0 0

Excess Demand with Increased FasTrak Capacity HOV Cash FasTrak HOV ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

Total 2,400 4,300 $1,660,000 $33,500,000 0.05

Change FasTrak 35 35 35 0 0 0

HOV 0 0 0 0 0 0

Cash 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

Person Hours  of Delay FasTrak 0.00 4.08 3.87 0.00 0.00 0.00 7.95 2,386

HOV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

Approach Improvements Report Alternative 19 ‐ Newark Boulevard Westbound HOV Ramps

San Francisco Bay Crossings Study Update

19 Newark Boulevard Westbound HOV Ramps Length of Imp. (miles) Scenario Existing w/ HOV on‐ramp

Hour 6:00 7:00 8:00 16:00 17:00 18:00 Daily Annual (Existing Conditions) Bus Route DB / DB1 / DB3 Daily  Annual (Existing Conditions) Annual (Future Conditions)

February 8, 2012

0.20 Type  General HOV General HOV

Lanes 3 0 3 1

% Traffic AM PM 100% 100% ‐ ‐ 87% 96% 13% 4%

Person Trips With Improvement Existing General HOV General HOV 2,528 ‐ 2,420 109 3,609 ‐ 3,419 190 3,371 ‐ 3,107 264 1,102 ‐ 1,076 27 1,236 ‐ 1,208 29 1,093 ‐ 1,061 31 12,940 0 12,290 650

Daily  Person‐ 410 410 123,000 17,571

Existing 600

Travel Time (sec.) With Imp. Change 420 180

TT Savings General Existing 0 Future  0 Travel Time Benefit Cost of Improvement Benefit / Cost Ratio

Existing General HOV 15 ‐ 15 ‐ 15 ‐ 11 ‐ 11 ‐ 11 ‐

Person  Hours of  20.50 21 6,150 879

HOV 199 356

Travel Time (seconds) With Improvement General HOV 15 11 15 11 15 11 11 11 11 11 11 11

Bus 6,150 879

Total 6,300 1,200 $1,800,000 $24,400,000 0.07

Change General HOV 0 4 0 4 0 4 0 0 0 0 0 0

Person Hours  of Delay General HOV 0 0.13 0 0.22 0 0.31 0 0.00 0 0.00 0 0.00 0 0.66 0 199

Approach Improvements Report Traffic Operations Assumptions

San Francisco Bay Crossings Study Update

Assumptions Location Mainline Ramps General/Cash Transaction FasTrak Transaction Open Road Tolling Bridges

Capacity (vphpl) 1,800 1,200 380 1,100 1,800 1,850 HOV Percentage

Location Bay Bridge (SFBC 2011 ) San Mateo Bridge (SFBC 2011 ) Dumbarton Bridge (SFBC 2011 ) I‐880 NB (HOV Report ) I‐280 (NB AM, SB PM) (HOV Report ) 101 SB (near San Mateo) (HOV Report ) 101 NB (near San Mateo) (HOV Report ) 101 NB (CSMP )  101 SB (CSMP )  I‐80 WB (at Powell)   (HOV Report ) SR 24 Corridor (CSMP ) Location y g Bay Bridge San Mateo Bridge Dumbarton Bridge Conversion Rates Daily to Annual Delay Cost ($ 2010) Auto Truck Expected useful life of improvement (years) Growth Factor (SFBC 2011) Bay Bridge Corridor Bus HOV (3 person) General San Mateo Bridge Corridor HOV General Dumbarton Bridge Corridor Bus HOV (3 person) General

February 8, 2012

AM 11.0% 10.0% 13.0% 19.7% 10.3% 9.6% 23.0% 10.7% 13.2% 16.8% 13.2%

77% 73% 72%

PM 3.0% 5.0% 3.7% 24.8% 13.9% 12.0% 15.6% 10.7% 13.2% 12.0% 13.2%

FasTrak Usage 69% 48% 58% 45% 66% 48%

factor 300 $    16.03 $    26.24 30

129% 117% 129% 142% 123% 14% 179% 120%

Daily 7.3% 7.3% 8.4% ‐ ‐ ‐ ‐ 10.7% 13.2% ‐ 13.2%

HOV AM 2.5 2.1 2 2.5 2.1 1.9 2 ‐ ‐ ‐ ‐

PM 2.6 2.1 2.2 2.1 2 2 2 ‐ ‐ ‐ ‐

1.4% 3.2% 2.1%

0.2% 0.6% 0.4%

Average Vehicle Occupancy (AVO) General Lanes Daily AM PM AM 1.1 1.1 2.6 35 1 1.1 2.2 35 1 1.1 2.1 35 1 1.1 1.5 35 1.1 1.1 1.1 35 1.2 1.1 1.2 35 1.1 1.1 1.1 35 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Truck Percentage 0.1% 0.9% 0.1% 2.7% 0.1% 1.9%

2.6% 6.6% 4.5%

Bus PM 35 35 35 35 35 35 35 ‐ ‐ ‐ ‐

Daily 35 35 35 35 35 35 35 ‐ ‐ ‐ ‐

AECOM

San Francisco Bay Crossings Study Update

Appendix C Cost Estimate Calculations

Bay Area Toll Authority

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Summary ALT. No.

DESCRIPTION

AECOM By: A. Leahy Date: February 8, 2012 AMOUNT

COMMENTS

Bay Bridge (Eastern Approach) 1

Mandela Parkway Bus Ramp

$46,200,000

2

MacArthur Blvd Bus Ramp

$11,100,000

3

Maritime HOV Lane Addition

4

SR 24 to I-80 HOV By Pass Partial Replacement

5

Powell Street / I-80 Ramps Intersection - HOV Improvement

6

I-880 HOV Lane Merge Lane Removal

$114,000

7

I-880 HOV Lane Merge Lane Extension

$117,000

$19,600,000 $439,400,000 $1,248,000

Bay Bridge (Western Approach) 8

4th Street On-Ramp / 9th Street Off-Ramp Braid

9

Bay Bridge to US 101 Lane Addition

$50,000,000

10

US 101 to Cesar Chavez HOV Lane Addition

$70,200,000

11

Cesar Chavez to US 101 HOV Lane Addition

$35,900,000

12

Fifth Street On-Ramp HOV Lane Addition

13

US 101 (I-280 to Bay Bridge HOV Lane Addition / Bypass

$329,500,000

14

I-280 (US 101 to Bay Bridge) HOV Lane Addition / Bypass

$171,300,000

$134,900,000

$4,300,000

San Mateo Bridge 15

San Mateo Bridge Open Road Tolling

$4,200,000

Dumbarton Bridge 16

Dumbarton Bridge Open Road Tolling

17

Western SR 84 / North I-880 HOV Connectors

$3,800,000

18

SR 84 FasTrak Lane Extension

$33,500,000

19

Newark Boulevard Westbound HOV Ramps

$24,400,000

$104,000,000

Page 1 of 20

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Bay Bridge (Eastern Approach)

AECOM By: A. Leahy Date: February 8, 2012

1: Mandela Parkway Bus Ramp ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

Traffic Control Demolition Bridge Structure, Ramp Bridge Structure, 25 ft High Restripe Roadway Sign Modifications Utility Relocation / Modification Street Modifications RR Coordination Drainage Modifications

QUANTITY

1 1 12,240 60,000 3,000 1 1 1 1 3,000

UNIT COST

ls ls sf sf lf ls ls ls ls lf

$20,000.00 $400,000.00 $200.00 $300.00 $8.00 $150,000.00 $1,000,000.00 $300,000.00 $2,000,000.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SUBTOTAL

AMOUNT

COMMENTS

$20,000 $400,000 $2,448,000 24 ft wide x 510 ft $18,000,000 20 ft wide x 3000 ft $24,000 $150,000 $1,000,000 $300,000 Mandela Parkway $2,000,000 $600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $24,942,000

MOBILIZATION / DEMOBILIZATION

10.0%

$2,494,200

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$623,550

PM & CM

5.0%

$1,247,100

ENGINEERING

10.0%

$2,494,200

SUBTOTAL

$31,801,050 CONTINGENCY RIGHT OF WAY COST

45% -

sf

$

TOTAL

250.00

$14,310,473 $0 Caltrans ROW $46,111,523

USE

$46,200,000

Page 2 of 20

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Bay Bridge (Eastern Approach)

AECOM By: A. Leahy Date: February 8, 2012

2: MacArthur Blvd Bus Ramp ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

Traffic Control Demolition Bridge Structure, 15 ft Crash Cushions Restripe Roadway Sign Modifications Utility Relocation / Modification Street Modifications Traffic Barrier Drainage Modifications

QUANTITY

1 1 13,500 3 3,800 1 1 1 1,200 6,600

UNIT COST

ls ls sf ea lf ls ls ls lf lf

$500,000.00 $1,000,000.00 $200.00 $5,000.00 $8.00 $100,000.00 $75,000.00 $200,000.00 $50.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SUBTOTAL

AMOUNT

COMMENTS

$500,000 $1,000,000 $2,700,000 900 ft long x 15 ft $15,000 $30,400 $100,000 $75,000 $200,000 MacArthur Blvd $60,000 $1,320,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $6,000,400

MOBILIZATION / DEMOBILIZATION

10.0%

$600,040

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$150,010

PM & CM

5.0%

$300,020

ENGINEERING

10.0%

$600,040

SUBTOTAL

$7,650,510 CONTINGENCY RIGHT OF WAY COST

45% -

sf

$

TOTAL

250.00

$3,442,730 $0 Caltrans ROW $11,093,240

USE

$11,100,000

Page 3 of 20

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Bay Bridge (Eastern Approach)

AECOM By: A. Leahy Date: February 8, 2012

3: Maritime HOV Lane Addition ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

Traffic Control Demolition Bridge Structure, 25 ft High Restripe Roadway Sign Modifications Utility Relocation / Modification Drainage Modifications

QUANTITY

1 1 30,600 2,550 1 1 2,600

UNIT COST

ls ls sf lf ls ls lf

$500,000.00 $200,000.00 $300.00 $8.00 $100,000.00 $75,000.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SUBTOTAL

AMOUNT

COMMENTS

$500,000 $200,000 $9,180,000 12 ft wide x 2550 ft long $20,400 $100,000 $75,000 $520,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $10,595,400

MOBILIZATION / DEMOBILIZATION

10.0%

$1,059,540

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$264,885

PM & CM

5.0%

$529,770

ENGINEERING

10.0%

$1,059,540

SUBTOTAL

$13,509,135 CONTINGENCY RIGHT OF WAY COST

45% -

sf

$

TOTAL

250.00

$6,079,111 $0 Caltrans ROW $19,588,246

USE

$19,600,000

Page 4 of 20

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Bay Bridge (Eastern Approach)

AECOM By: A. Leahy Date: February 8, 2012

4: SR 24 to I-80 HOV By Pass Partial Replacement ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

Traffic Control Demolition Bridge Structure, 15 ft High Bridge Structure, 40 ft High Mainline, SR 24 Restripe Roadway Sign Modification Utility Relocation / Modification Drainage Modifications

QUANTITY

UNIT COST

1 1 32,000 278,400 22,500 10,500 1 1 6,600

$250,000.00 $1,000,000.00 $600.00 $600.00 $200.00 $8.00 $300,000.00 $2,000,000.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

ls ls sf sf lf lf ea ls lf

SUBTOTAL

6,600.00

AMOUNT

$250,000 $1,000,000 $19,200,000 1600 ft x 20 ft SR 24 / I580 connector $167,040,000 6960 ft x 40 ft wide Flyover $4,500,000 1500 x 15 ft SR 24 $84,000 $300,000 $2,000,000 $1,320,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $195,694,000

MOBILIZATION / DEMOBILIZATION

10.0%

$19,569,400

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$4,892,350

PM & CM

5.0%

$9,784,700

ENGINEERING

10.0%

$19,569,400

SUBTOTAL

$249,509,850 CONTINGENCY RIGHT OF WAY COST

45% 310,400

sf

$

TOTAL

250.00

$112,279,433 $77,600,000 Private ROW $439,389,283

USE

$439,400,000

Page 5 of 20

COMMENTS

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Bay Bridge (Eastern Approach)

AECOM By: A. Leahy Date: February 8, 2012

5: Powell Street / I-80 Ramps Intersection - HOV Improvement ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

QUANTITY

Traffic Control Demolition Modify Intersection Signaling at Powell Street

1 1 1

UNIT COST

ls ls ls

$300,000.00 $75,000.00 $300,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SUBTOTAL

AMOUNT

COMMENTS

$300,000 $75,000 $300,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $675,000

MOBILIZATION / DEMOBILIZATION

10.0%

$67,500

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$16,875

PM & CM

5.0%

$33,750

ENGINEERING

10.0%

$67,500

SUBTOTAL

$860,625 CONTINGENCY RIGHT OF WAY COST

45% -

sf

$

TOTAL

250.00

$387,281 $0 Caltrans ROW $1,247,906

USE

$1,248,000

Page 6 of 20

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Bay Bridge (Eastern Approach)

AECOM By: A. Leahy Date: February 8, 2012

6: I-880 HOV Lane Merge Lane Removal ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

Traffic Control Restripe Roadway Sign Modifications

SUBTOTAL

QUANTITY

1 1,450 1

ls lf ls

1,450

ft

UNIT COST

$30,000.00 $8.00 $20,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

AMOUNT

COMMENTS

$30,000 $11,600 $20,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $61,600

MOBILIZATION / DEMOBILIZATION

10.0%

$6,160

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$1,540

PM & CM

5.0%

$3,080

ENGINEERING

10.0%

$6,160

SUBTOTAL

$78,540 CONTINGENCY RIGHT OF WAY COST

45% -

sf

$

TOTAL

250.00

$35,343 $0 Existing Footprint $113,883

USE

$114,000

Page 7 of 20

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Bay Bridge (Eastern Approach)

AECOM By: A. Leahy Date: February 8, 2012

7: I-880 HOV Lane Merge Lane Extension ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

Traffic Control Restripe Roadway Sign Modifications

SUBTOTAL

QUANTITY

1 1,650 1

ls lf ls

1,650

ft

UNIT COST

$30,000.00 $8.00 $20,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

AMOUNT

COMMENTS

$30,000 $13,200 $20,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $63,200

MOBILIZATION / DEMOBILIZATION

10.0%

$6,320

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$1,580

PM & CM

5.0%

$3,160

ENGINEERING

10.0%

$6,320

SUBTOTAL

$80,580 CONTINGENCY RIGHT OF WAY COST

45% -

sf

$

TOTAL

250.00

$36,261 $0 Existing Footprint $116,841

USE

$117,000

Page 8 of 20

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Bay Bridge (Western Approach)

AECOM By: A. Leahy Date: February 8, 2012

8: 4th Street On-Ramp / 9th Street Off-Ramp Braid ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

Traffic Control Demolition Bridge Structure, 15 ft High Restripe Roadway Sign Modifications Utility Relocation / Modification 9th Street Off-Ramp Modification 4th Street On-Ramp Modification Traffic Barrier Drainage Modifications

SUBTOTAL

QUANTITY

1 1 60,000 3,550 1 1 1 1 2,500 3,550

ls ls sf lf ls ls ls ls lf lf

3,550

ft

UNIT COST

$200,000.00 $1,000,000.00 $200.00 $8.00 $150,000.00 $200,000.00 $2,500,000.00 $2,000,000.00 $50.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

AMOUNT

$200,000 $1,000,000 Buildings along I-80 $12,000,000 24 ft x 2500 ft $28,400 $150,000 $200,000 $2,500,000 $2,000,000 $125,000 $710,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $18,913,400

MOBILIZATION / DEMOBILIZATION

10.0%

$1,891,340

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$472,835

PM & CM

5.0%

$945,670

ENGINEERING

10.0%

$1,891,340

SUBTOTAL

$24,114,585 CONTINGENCY RIGHT OF WAY COST

45% 60,000

sf

$

TOTAL

250.00

$10,851,563 $15,000,000 Private ROW $49,966,148

USE

$50,000,000

Page 9 of 20

COMMENTS

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Bay Bridge (Western Approach)

AECOM By: A. Leahy Date: February 8, 2012

9: Bay Bridge to US 101 Lane Addition ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

Traffic Control Demolition Bridge Structure, 15 ft High Bridge Structure, 15 ft High, Off Ramp Restripe Roadway Sign Modifications Utility Relocation / Modification 9th Street Off-Ramp Modification 4th Street On-Ramp Modification Drainage Modifications

QUANTITY

UNIT COST

1 1 166,950 24,000 7,950 1 1 1 1 7,950

$200,000.00 $1,000,000.00 $200.00 $250.00 $8.00 $150,000.00 $200,000.00 $2,500,000.00 $2,000,000.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

ls ls sf sf lf ls ls ls ls lf

SUBTOTAL

AMOUNT

$200,000 $1,000,000 $33,390,000 21 ft x 7950 ft $6,000,000 Off Ramp to Central Fwy 600 ft x 40 ft $63,600 $150,000 $200,000 $2,500,000 $2,000,000 $1,590,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $47,093,600

MOBILIZATION / DEMOBILIZATION

10.0%

$4,709,360

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$1,177,340

PM & CM

5.0%

$2,354,680

ENGINEERING

10.0%

$4,709,360

SUBTOTAL

$60,044,340 CONTINGENCY RIGHT OF WAY COST

45% 190,950

sf

$

TOTAL

250.00

$27,019,953 $47,737,500 Private ROW $134,801,793

USE

$134,900,000

Page 10 of 20

COMMENTS

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Bay Bridge (Western Approach)

AECOM By: A. Leahy Date: February 8, 2012

10: US 101 to Cesar Chavez HOV Lane Addition ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

Traffic Control Demolition Bridge Structure, 15 ft High Widen Roadway, At-Grade Restripe Roadway Sign Modifications Utility Relocation / Modification Modify Pedestrian Bridge Overcrossing Bridge Retaining Wall Modification Drainage Modifications

SUBTOTAL

QUANTITY

1 1 20,000 73,200 26,000 1 1 3 1 6,600 6,600

ls ls sf sf lf ls ls ea ea lf lf

6,600

ft

UNIT COST

$100,000.00 $200,000.00 $600.00 $100.00 $8.00 $100,000.00 $200,000.00 $200,000.00 $2,000,000.00 $200.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

AMOUNT

$100,000 $200,000 $12,000,000 $7,320,000 $208,000 $100,000 $200,000 $600,000 $2,000,000 $1,320,000 $1,320,000 $0 $0 $0 $0 $0 $0 $0 $0 $0

COMMENTS

1000 ft x 20 ft 6100 ft x 12

Allowance 23rd St Ht = varies

$25,368,000

MOBILIZATION / DEMOBILIZATION

10.0%

$2,536,800

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$634,200

PM & CM

5.0%

$1,268,400

ENGINEERING

10.0%

$2,536,800

SUBTOTAL

$32,344,200 CONTINGENCY RIGHT OF WAY COST

45% 93,200

sf

$

TOTAL

250.00

$14,554,890 $23,300,000 Private ROW $70,199,090

USE

$70,200,000

Page 11 of 20

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Bay Bridge (Western Approach)

AECOM By: A. Leahy Date: February 8, 2012

11: Cesar Chavez to US 101 HOV Lane Addition ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

Traffic Control Demolition Widen Roadway, At-Grade Restripe Roadway Sign Modifications Utility Relocation / Modification Modify Pedestrian Bridge Overcrossing Bridge Retaining Wall Modification Drainage Modifications

SUBTOTAL

QUANTITY

1 1 52,800 20,000 1 1 2 1 4,400 4,400

4,400

UNIT COST

ls ls sf lf ls ls ea ea lf lf

AMOUNT

COMMENTS

$100,000.00 $200,000.00 $100.00 $8.00 $100,000.00 $200,000.00 $200,000.00 $2,000,000.00 $200.00 $200.00 $0.00 $0.00 $0.00

$100,000 $200,000 $5,280,000 $160,000 $100,000 $200,000 $400,000 $2,000,000 $880,000 $880,000 $0 $0 $0

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0 $0 $0 $0 $0 $0

ft

4400 ft x 12

Allowance 23rd St Ht = varies

$10,200,000

MOBILIZATION / DEMOBILIZATION

10.0%

$1,020,000

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$255,000

PM & CM

5.0%

$510,000

ENGINEERING

10.0%

$1,020,000

SUBTOTAL

$13,005,000 CONTINGENCY RIGHT OF WAY COST

45% 68,000

sf

$

TOTAL

250.00

$5,852,250 $17,000,000 Private ROW $35,857,250

USE

$35,900,000

Page 12 of 20

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Bay Bridge (Western Approach)

AECOM By: A. Leahy Date: February 8, 2012

12: Fifth Street On-Ramp HOV Lane Addition ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

Traffic Control Demolition Ramp Structure Restripe Roadway Sign Modifications Utility Relocation / Modification Drainage Modifications

QUANTITY

1 1 7,200 2,735 1 1 2,950

UNIT COST

ls ls sf lf ls ls lf

$75,000.00 $100,000.00 $200.00 $8.00 $35,000.00 $25,000.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SUBTOTAL

AMOUNT

COMMENTS

$75,000 $100,000 $1,440,000 600 ft x 12 $21,880 $35,000 $25,000 $590,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,286,880

MOBILIZATION / DEMOBILIZATION

10.0%

$228,688

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$57,172

PM & CM

5.0%

$114,344

ENGINEERING

10.0%

$228,688

SUBTOTAL

$2,915,772 CONTINGENCY RIGHT OF WAY COST

45% sf

$

TOTAL

250.00

$1,312,097 $0 Caltrans ROW $4,227,869

USE

$4,300,000

Page 13 of 20

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Bay Bridge (Western Approach)

AECOM By: A. Leahy Date: February 8, 2012

13: US 101 (I-280 to Bay Bridge) HOV Lane Addition / Bypass ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

Traffic Control Demolition Bridge Structure, 15 ft High Bridge Structure, 15 ft High Bridge Structure, 40 ft High Add HOV Lane, At-Grade Off Ramp Modifications, Bayshore Blvd Off Ramp Modifications, Vermont St Off Ramp Modifications, 4th Street Restripe Roadway Utility Relocation / Protection Sign Modifications Retaining Wall Modification Modify Pedestrian Bridge Overcrossing Bridge Drainage Modifications

QUANTITY

UNIT COST

1 1 6,000 16,000 173,000 92,400 1 1 1 14,700 1 1 7,700 3 1 9,900

$2,000,000.00 $3,000,000.00 $600.00 $600.00 $600.00 $12.00 $1,000,000.00 $1,000,000.00 $2,000,000.00 $8.00 $5,000,000.00 $1,000,000.00 $200.00 $200,000.00 $2,000,000.00 $200.00 $0.00 $0.00 $0.00 $0.00

ls ls sf sf sf sf ls ls ls lf ls ls lf ea ea lf

SUBTOTAL

AMOUNT

$2,000,000 $3,000,000 $3,600,000 $9,600,000 $103,800,000 $1,108,800 $1,000,000 $1,000,000 $2,000,000 $117,600 $5,000,000 $1,000,000 $1,540,000 $600,000 $2,000,000 $1,980,000 $0 $0 $0 $0

COMMENTS

Lane Widening Structure at Bayshore Off Ramp 600 ft x 10 ft Lane Widening Structure at Vermont St Off Ramp 1600 ft x 10 ft HOV Lane Structure 8650 ft x 20 ft wide N 101 & E I-80 7700 ft x 12 ft wide

Bridge / Ramp Structure

Ht = varies Allowance 23rd St

$139,346,400 MOBILIZATION / DEMOBILIZATION

10.0%

$13,934,640

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$3,483,660

PM & CM

5.0%

$6,967,320

ENGINEERING

10.0%

$13,934,640

SUBTOTAL

$177,666,660 CONTINGENCY RIGHT OF WAY COST

45% 287,400

sf

$

250.00

TOTAL

$79,949,997 $71,850,000 Private ROW $329,466,657

USE

$329,500,000

Page 14 of 20

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Bay Bridge (Western Approach)

AECOM By: A. Leahy Date: February 8, 2012

14: I-280 (US 101 to Bay Bridge) HOV Lane Addition / Bypass ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

Traffic Control Demolition Bridge Structure, 15 ft High Restripe Roadway Sign Modifications Utility Relocation / Modification RR Coordinatoin Drainage Modifications

QUANTITY

1 1 95,700 9,150 1 1 1 4,350

ls ls sf lf ls ls ls lf

UNIT COST

$2,000,000.00 $3,000,000.00 $600.00 $8.00 $300,000.00 $12,000,000.00 $4,000,000.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SUBTOTAL

AMOUNT

$2,000,000 $3,000,000 $57,420,000 4350 ft x 22 ft wide $73,200 $300,000 $12,000,000 $4,000,000 $870,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $79,663,200

MOBILIZATION / DEMOBILIZATION

10.0%

$7,966,320

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$1,991,580

PM & CM

5.0%

$3,983,160

ENGINEERING

10.0%

$7,966,320

SUBTOTAL

$101,570,580 CONTINGENCY RIGHT OF WAY COST

45% 95,700

sf

$

TOTAL

250.00

$45,706,761 $23,925,000 Private ROW $171,202,341

USE

$171,300,000

Page 15 of 20

COMMENTS

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail San Mateo Bridge

AECOM By: A. Leahy Date: February 8, 2012

15: San Mateo Bridge Open Road Tolling ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

QUANTITY

Construction and Demolition Hardware, Software Implementation including Signage

1 1 1

UNIT COST

ls ls ls

$690,000.00 $1,125,000.00 $450,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SUBTOTAL

AMOUNT

COMMENTS

$690,000 $1,125,000 $450,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,265,000

MOBILIZATION / DEMOBILIZATION

10.0%

$226,500

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$56,625

PM & CM

5.0%

$113,250

ENGINEERING

10.0%

$226,500

SUBTOTAL

$2,887,875 CONTINGENCY RIGHT OF WAY COST

45% -

sf

$

TOTAL

$1,299,544

250.00

$0 Existing Footprint $4,187,419

USE

$4,200,000

Source: Budget for implementation of All Electronic Tolling on the Golden Gate Bridge (http://www.tollroadsnews.com/node/5119)

Page 16 of 20

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Dumbarton Bridge

AECOM By: A. Leahy Date: February 8, 2012

16: Dumbarton Bridge Open Road Tolling ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

QUANTITY

Construction and Demolition Hardware, Software Implementation including Signage

1 1 1

UNIT COST

ls ls ls

AMOUNT

$460,000.00 $1,125,000.00 $450,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SUBTOTAL

COMMENTS

$460,000 $1,125,000 $450,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,035,000

MOBILIZATION / DEMOBILIZATION

10.0%

$203,500

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$50,875

PM & CM

5.0%

$101,750

ENGINEERING

10.0%

$203,500

SUBTOTAL

$2,594,625 CONTINGENCY RIGHT OF WAY COST

45% -

sf

$

250.00

TOTAL

$1,167,581 $0 Existing Footprint $3,762,206

USE

$3,800,000

Source: Budget for implementation of All Electronic Tolling on the Golden Gate Bridge (http://www.tollroadsnews.com/node/5119)

Page 17 of 20

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Dumbarton Bridge

AECOM By: A. Leahy Date: February 8, 2012

17: Western SR 84 / North I-880 HOV Connectors ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

Traffic Control Demolition Bridge Structure, 25 ft High Add HOV Lane, At-Grade Restripe Roadway Sign Modifications Utility Relocation / Modification Drainage Modifications

QUANTITY

1 1 124,000 48,000 4,500 1 1 4,500

UNIT COST

ls ls sf sf lf ls ls lf

$200,000.00 $100,000.00 $250.00 $12.00 $8.00 $75,000.00 $100,000.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SUBTOTAL

AMOUNT

$200,000 $100,000 $31,000,000 Flyover from I-880 to SR 84 62 ft wide ~ 2000 ft long $576,000 SR 24 & I-880 12 ft ~4000 ft $36,000 $75,000 $100,000 $900,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $32,987,000

MOBILIZATION / DEMOBILIZATION

10.0%

$3,298,700

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$824,675

PM & CM

5.0%

$1,649,350

ENGINEERING

10.0%

$3,298,700

SUBTOTAL

$42,058,425 CONTINGENCY RIGHT OF WAY COST

45% 172,000

sf

$

TOTAL

250.00

$18,926,291 $43,000,000 Private ROW $103,984,716

USE

$104,000,000

Page 18 of 20

COMMENTS

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Dumbarton Bridge

AECOM By: A. Leahy Date: February 8, 2012

18: SR 84 FasTrak Lane Extension ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

Traffic Control Demolition Add HOV Lane, At-Grade Modify Bridge Abutments Modify Ramps Restripe Roadway Sign Modifications Utility Relocation / Modification Traffic Barrier Drainage Modifications

QUANTITY

1 1 90,000 1 3 7,500 1 1 7,500 7,500

UNIT COST

ls ls sf ea ea lf ls ls lf lf

$75,000.00 $100,000.00 $12.00 $2,000,000.00 $200,000.00 $8.00 $75,000.00 $50,000.00 $50.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SUBTOTAL

AMOUNT

$75,000 $100,000 $1,080,000 7500 ft x 12 ft wide $2,000,000 Paseo Padre Parkway $600,000 $60,000 $75,000 $50,000 $375,000 $1,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,915,000

MOBILIZATION / DEMOBILIZATION

10.0%

$591,500

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$147,875

PM & CM

5.0%

$295,750

ENGINEERING

10.0%

$591,500

SUBTOTAL

$7,541,625 CONTINGENCY RIGHT OF WAY COST

45% 90,000

sf

$

TOTAL

250.00

$3,393,731 $22,500,000 Private ROW $33,435,356

USE

$33,500,000

Page 19 of 20

COMMENTS

Bay Area Toll Authority San Francisco Bay Crossing Study ROM Cost Estimate - Detail Dumbarton Bridge

AECOM By: A. Leahy Date: February 8, 2012

19: Newark Boulevard Westbound HOV Ramps ITEM No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DESCRIPTION

Traffic Control Demolition Modify Medians Modify Traffic Signals - 2 Locations Bridge Modifications - 2 Locations Pavement HOV Ramps On-Ramp Modifications Off-Ramp Modifications Traffic Stripes and Markings Sign Modifications Utility Relocation / Modification Drainage Modifications

QUANTITY

1 1 2 2 2 16,000 1 1 16,850 1 1 1

UNIT COST

ls ls ea ea ea sf ls ls lf ls ls ls

$50,000.00 $100,000.00 $10,000.00 $50,000.00 $5,000,000.00 $12.00 $75,000.00 $75,000.00 $3.00 $75,000.00 $50,000.00 $200,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SUBTOTAL

AMOUNT

$50,000 $100,000 $20,000 On Newark Blvd. $100,000 $10,000,000 $192,000 $75,000 $75,000 $50,550 Newark Blvd / SR 84 $75,000 $50,000 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $10,987,550

MOBILIZATION / DEMOBILIZATION

10.0%

$1,098,755

BONDS & GENERAL LIABILITY INSURANCE

2.5%

$274,689

PM & CM

5.0%

$549,378

ENGINEERING

10.0%

$1,098,755

SUBTOTAL

$14,009,126 CONTINGENCY RIGHT OF WAY COST

45% 16,000

sf

$

TOTAL

250.00

$6,304,107 $4,000,000 Private ROW $24,313,233

USE

$24,400,000

Page 20 of 20

COMMENTS