Industrial Gas Turbines Aftermarket Parts, Repairs & Services

Report 17 Downloads 84 Views
Industrial Gas Turbine New Parts Industrial Gas Turbine Repair Aftermarket Field Services

Industrial Gas Turbines Aftermarket Parts, Repairs & Services

1 About Us 2 Industrial Gas Turbine New Parts 6 Industrial Gas Turbine Repair 9 Aftermarket Field Services

About Us PW Power Systems, Inc. (PWPS) is a world leader in developing and manufacturing energy solutions for power generation offering products for aero-derivative and industrial gas turbines. PWPS™ offers a full range of maintenance, overhaul, repair and spare parts for other manufacturers’ gas turbines with specific concentration on the high-temperature “F” class industrial machines. PWPS also offers quick turnaround for parts and repair services utilizing the latest in component repair technology integrated from Pratt & Whitney® Global Aftermarket Service expertise. PW Power Systems is committed to providing high-quality solutions for the distributed energy market that increase energy productivity, energy reliability, and operational savings for our customers.

1

Industrial Gas Turbine New Parts PW Power Systems designs, reengineers and manufactures components for use in land-based Industrial Gas Turbine (IGT) applications. As part of the portfolio of components and services available, PWPS produces and repairs replacement parts for the hot gas path (HGP) from other OEMs of large-frame gas turbines. The PWPS™ components are manufactured using Pratt & Whitney® proprietary alloys and coatings. These materials, coupled with aerospace and industrial design technology and quality systems, enable users to install these components and operate their equipment with no degradation in machine performance while realizing improved durability of the hot gas path components. PWPS™ solutions allow customers to develop a degree of confidence that is unparalleled in the industry. 2

PWPS experience with HGP parts and repairs is based on comparisons of distress modes observed in the fleet. At PW Power Systems, it is our goal to provide value- based gas turbine solutions for our customers by incorporating customer feedback, component optimization and the advantage of over 80 years of technology development from our extensive hightemperature aviation heritage. PWPS is leveraging Pratt & Whitney® world-renowned hot section engineering to address the needs of the industrial gas turbine customer. PWPS has an extensive proven history of producing industry-leading technological solutions. We utilize this advantage by applying our proprietary technology to create new and innovative solutions for our industrial customers.

Engineering Standard Work The Foundation for Quality OEM Part

Industrial Gas Turbine Enhanced New Parts

Scanned Data

Scanning

Initial CAD Model

Systems & Aero Analysis

Advanced Proprietary Technology includes: •  High-Temperature Technology •  Proprietary Alloys •  Metallic Coatings •  Ceramic Coatings •  Film Cooling •  Multidisciplinary Optimization •  Tip Clearance Material Systems •  Advanced Computational Modeling Techniques

60 HZ Portfolio offering

Design/Analysis Multi-disciplinary Optimization

•  Frame 7FA.03 1st, 2nd and 3rd Stage Buckets, Nozzles & Shroud Blocks •  Frame 7FA.03 DLN 2.6 Transition Pieces, Liners, Flow Sleeves, Liner End Cap, Fuel Nozzles •  Frame 7EA 1st, 2nd and 3rd Stage Bucket

50 HZ Portfolio offering HighTemperature-Class hardware

Final Definition

•  STG5-4000F (V94.3A4x) Hot Gas Path Components •  1st, 2nd, 3rd, 4th Stage Blades & Vanes •  Blade Outer Air Seals (BOAS) New PWPS™ Part

“PWPS has surpassed over 1.8 million hours of accumulated run time on its Frame 7FA.03 (7FA+e) HGP components.” 3

Product Development Process Robust intellectual property strategy integrated into reengineering design

Project Launch

Engineering Analysis

Prelim IP Assessment

Detailed Design

Preliminary Design

Metrology

Production

Features List

IP Risk Identification

Final Clearance

IP Due Diligence Process

PW Power Systems™ Experience and Technology Differentiating from the Competition

Copying vs Redesigning

Market Data & Source for Parts

Reverse Engineer Existing Parts & Engine Equipment

Enhance Design / System Integration

Manufacturing Development

Validation

Manufacturing & Sourcing

CMM Technology

Computational Fluid Dynamics

Production Qualification Processing

Testing & Producibility

Production

Optical Technology

Durability Analysis

Wax Molding

Structural Analysis

SOAPP Analysis

Finite Element Heat Distribution Analysis

IP Risk Analysis

Materials & Coatings 4

PW Power Systems Design Toolbox: • Multiple Disciplinary Optimization allows for extensive exploration of design options while monitoring many design constraints • Iterations effectiveness maximized

Industrial Gas Turbine Repair Overview PW Power Systems™ IGT repair activities are directed from our San Antonio Center of Excellence. Originally installed as an aero engine repair facility supporting military and commercial customers, this facility is now solely dedicated to IGT repair. The same level of rigor and competency has been extended into the efficient repair of industrial gas turbine components. Each component repair is driven by documented repair procedures, process control and inspection methods, ensuring the highest quality levels. A significant investment in equipment and facility improvements has been made over the last several years as we have transformed this facility into a dedicated industrial gas turbine facility. With that investment in our facility, it will continue to expand our capabilities and retain the best technical talent in the industry. The vast majority of all repair processing required is performed in-house with minimal vendor-supported operations. This helps ensure the highest levels of quality and schedule control. On-site process capabilities include but are not limited to: Elevated Temperature Welding Manual TIG Welding Laser Welding Vacuum Heat Treat Braze Crack Repair CNC Shot Peen Robotic HVOF Plasma Robotic APS Plasma Grit Blast Blending Airflow; Water Flow Digital 450kv X-Ray Heat Tint FPI CMM Bridgeport Machining EDM Plunge and Hole Drill Submerged Ultra-sonic Inspection System FSET (Frequency Scanning Eddy Current Test) System 5-axis CNC Grinding 5

The technical expertise required to develop and execute advanced IGT repairs resides on-site in our San Antonio facility, fortified by the depth and technical resources of over 80 years of turbine engine expertise.

“PWPS has successfully repaired over 650 sets of F-class acomponents.” Gated Repair Process

INDUCT

STRIP & INSPECT

REPAIR

COAT & FINISH

PACK & SHIP

CUSTOMER REVIEW GATE

Strip & Inspect Process Steps

Repair Process Steps

Coat & Finish

Mark ID and Incoming VIS

Machine/Rout Defects

Heat Tint

Photo-Document Incoming

Solution Vacuum Heat Treat

Internal Aluminum Coat

Metallurgical Assessment

FPI

Mask for Coat

Disassembly

Weld Repair

HVOF

X-ray

Blend Repair

Diffusion Vacuum HT

Airflow

Hot Isostatic Press (HIP)

APS TBC Coat

Grit Remove TBC

Machine/CNC

Diffusion and Age Vacuum HT

Chemical or Water-Jet Strip

Vacuum Heat Treat

De-burr Cooling Holes

Heat Tint

EDM Cooling Holes

Heat Tint

Blend Residual Coating

Blend/De-burr

Shot Peen

FPI, Dimensional

Grit Blast Clean

Rail Coat

Photo-Document Post Strip

FPI

Cosmetic Clean

Generate Report

Heat Tint

Airflow; Water Flow

Customer Review Gate

X-ray

X-ray

Airflow

Dimensional Inspect

Water Flow

Final Inspect Visual

Dimensional

Moment Weigh & Sequence

Pre-Coat VIS

Customer Review Gate

Customer Review Gate 6

Standardized Repair Methodology

Engine Types with Repair Experience Frame 7B/7EA

Frame 6FA

Frame 7FA.03

TWP – Technical Work Package

F­rame 9FA+e

F­rame 9E

V84.2

Technical requirements

V94.2

V84.3A V94.3A2/A4

Defines key characteristics

Router (Traveler) Sequenced operational process steps Piece-by-piece traceability

Work Instructions Instructions for performing a specific type of operation (blending, welding, moment weight, airflow, etc.)

Technique Sheet Detailed parameters and specific instructions within a Work Instruction group unique to a specific operation/ part 7

C­oatings State-of-the-Art Coatings Extend Part Life PW Power Systems (PWPS) has created advanced coating systems to refurbish hot section components, provide oxidation/hot-gas-corrosion protection and aid temperature reduction through the use of advanced coating ceramics. These coatings represent state-of-the-art proprietary materials tailored to meet the unique challenges of industrial gas turbine environments.

Engine Models

Blades/ Buckets

Nozzles/ Vanes

Liners

Transition Pieces

Shrouds

Frame 7FA.03











Frame 6B







Frame 6FA











Frame 9E



V84.3A





•*

V94.3A2 / A4





•*

Frame 9FA+e











*heat shields

8

Aftermarket Field Services PW Power Systems has strategic alliances with best-in-class service providers to deliver the entire portfolio of power plant services, enabling PWPS to deliver the highest quality and most cost-effective maintenance solutions to our customers.

Field Service PWPS offers fully integrated outage services capable of completing emergency, unplanned or scheduled maintenance in a timely, safe, high-quality and costeffective manner. PWPS supports a wide range of power generation equipment including gas turbine, steam turbine, generator and auxiliary equipment. PWPS is ready to provide a highly experienced team to investigate, plan and execute solutions to meet your turbine generator requirements. The PWPS™ objective is to provide total service and support throughout the Americas, Europe, Asia and the Middle East, helping power producers achieve the highest levels of availability, reliability and profit. Turnkey Outage Services

Failure and Root Cause Analysis

Project Management

Outage Parts Kits

Gas/Steam Turbine Minor and Major Inspections

Balance, Tuning and NDE

Generator Inspections

Turbine Control Troubleshooting and Upgrade

Rotor Life Assessments

Remote Monitoring and Diagnostics

Contracted Service Agreements PWPS offers flexible, customizable maintenance agreements to fit your specific requirements. Maintenance objectives have moved from preservation and protection to cost reduction and optimization. Power producers need optimized maintenance solutions to cover the life cycle of the power plant, allowing for: •  Risk Management

• Guarantee Performance

•  Control Operational Costs

• Technology Advancements

PWPS is an integral part of an ever-changing market continually offering advanced service solutions.

Savannah Machinery Works PW Power Systems works in cooperation with Mitsubishi’s Savannah Machinery Works as a premier service and manufacturing center for gas turbine, steam turbine, and generator refurbishment.

Rotor Refurbishment Mitsubishi’s Savannah facility employs over 350 skilled workers in their 400,000 sq. ft. complex. Located on 121 acres in Savannah, Georgia, this ISO 9001:2008 certified facility manufactures key gas turbine components and provides a comprehensive range of overhaul services, including major rotor refurbishments on advanced, high temperature gas turbines, steam turbines and generators. Savannah Machinery Works is dedicated to maximizing availability, reliability, and profitability for power providers. 9

The export is made under the authority of “No License Required” (NLR). ECCN EAR99 No SED required per 30.55(h) FTSR. These commodities, technology, or software were exported from the United States in accordance with the Export Administration Regulations. Diversion contrary to U.S. Law prohibited. Copyright © 2014 PW Power Systems, Inc. PW is a trademark of United Technologies Corporation. Used with permission. Pratt & Whitney is a trademark of United Technologies Corporation. Used with permission.

PW Power Systems, Inc. 628 Hebron Avenue, Suite 400 Glastonbury, CT 06033 www.pwps.com

IGT_DIG_012014 01/2014